Upgrade E5700 host interface card (HIC)

Contributors NetAppZacharyWambold netapp-driley netapp-jolieg netapp-jsnyder

You can upgrade a host interface card (HIC) in an E5700 array to increase the number of host ports or to change host protocols.

About this task

When you upgrade the HICs, you must power off the storage array, remove the existing HIC from each controller, install a new HIC, and reapply power.

Before you begin
  • Review Requirements for E5700 HIC replacement.

  • Schedule a downtime maintenance window for this procedure. The power must be off when you install HICs, so you cannot access data on the storage array until you have successfully completed this procedure. (In a duplex configuration, this is because both controllers must have the same HIC configuration when they are powered on.)

  • Make sure you have the following:

    • One or two HICs, based on whether you have one or two controllers in your storage array. The HICs must be compatible with your controllers.

    • New host hardware installed for the new host ports, such as switches or host bus adapters (HBAs).

    • All cables, transceivers, switches, and host bus adapters (HBAs) needed to connect the new host ports.

      For information about compatible hardware, refer to the NetApp Interoperability Matrix or the NetApp Hardware Universe.

    • Labels to identify each cable that is connected to the controller canister.

    • An ESD wristband, or you have taken other antistatic precautions.

    • A #1 Phillips screwdriver.

    • A management station with a browser that can access SANtricity System Manager for the controller. (To open the System Manager interface, point the browser to the controller's domain name or IP address.)

Step 1: Prepare to upgrade HICs

Prepare to upgrade a HIC by backing up the storage array's configuration database, collecting support data, and stopping host I/O operations. Then, you can power down the controller shelf.

Steps
  1. From the Home page of SANtricity System Manager, ensure that the storage array has Optimal status.

    If the status is not Optimal, use the Recovery Guru or contact technical support to resolve the problem. Do not continue with this procedure.

  2. Back up the storage array's configuration database using SANtricity System Manager.

    If a problem occurs during this procedure, you can use the saved file to restore your configuration. The system will save the current state of the RAID configuration database, which includes all data for volume groups and disk pools on the controller.

    • From System Manager:

      1. Select Support  Support Center  Diagnostics.

      2. Select Collect Configuration Data.

      3. Click Collect.

        The file is saved in the Downloads folder for your browser with the name, configurationData-<arrayName>-<dateTime>.7z.

    • Alternatively, you can back up the configuration database by using the following CLI command:

      save storageArray dbmDatabase sourceLocation=onboard contentType=all file="filename";

  3. Collect support data for your storage array using SANtricity System Manager.

    If a problem occurs during this procedure, you can use the saved file to troubleshoot the issue. The system will save inventory, status, and performance data about your storage array in a single file.

    1. Select Support  Support Center  Diagnostics.

    2. Select Collect Support Data.

    3. Click Collect.

      The file is saved in the Downloads folder for your browser with the name, support-data.7z.

  4. Ensure that no I/O operations are occurring between the storage array and all connected hosts. For example, you can perform these steps:

    • Stop all processes that involve the LUNs mapped from the storage to the hosts.

    • Ensure that no applications are writing data to any LUNs mapped from the storage to the hosts.

    • Unmount all file systems associated with volumes on the array.

      Note The exact steps to stop host I/O operations depend on the host operating system and the configuration, which are beyond the scope of these instructions. If you are not sure how to stop host I/O operations in your environment, consider shutting down the host.
      Caution Possible data loss — If you continue this procedure while I/O operations are occurring, the host application might lose access to the data because the storage is not accessible.
  5. If the storage array participates in a mirroring relationship, stop all host I/O operations on the secondary storage array.

  6. Wait for any data in cache memory to be written to the drives.

    The green Cache Active LED on the back of each controller is on when cached data needs to be written to the drives. You must wait for this LED to turn off.

    e5700 ib hic w cache led callouts maint e5700

    (1) Cache Active LED

  7. From the Home page of SANtricity System Manager, select View Operations in Progress. Wait for all operations to complete before continuing with the next step.

  8. Power down the controller shelf.

    1. Turn off both power switches on the controller shelf.

    2. Wait for all LEDs on the controller shelf to turn off.

Step 2: Remove controller canister

Remove the controller canister so you can upgrade the new HIC.

Steps
  1. Label each cable that is attached to the controller canister.

  2. Disconnect all the cables from the controller canister.

    Caution To prevent degraded performance, do not twist, fold, pinch, or step on the cables.
  3. If the HIC ports use SFP+ transceivers, remove them.

    Depending on what type of HIC you are upgrading to, you might be able to reuse these SFPs.

  4. Confirm that the Cache Active LED on the back of the controller is off.

    The green Cache Active LED on the back of the controller is on when cached data needs to be written to the drives. You must wait for this LED to turn off before removing the controller canister.

    e5700 ib hic w cache led callouts maint e5700

    (1) Cache Active LED

  5. Squeeze the latch on the cam handle until it releases, and then open the cam handle to the right to release the controller canister from the shelf.

    The following figure is an example of an E5724 controller shelf:

    28 dwg e2824 remove controller canister maint e5700

    (1) Controller canister

    (2) Cam handle

    The following figure is an example of an E5760 controller shelf:

    28 dwg e2860 add controller canister maint e5700

    (1) Controller canister

    (2) Cam handle

  6. Using two hands and the cam handle, slide the controller canister out of the shelf.

    Caution Always use two hands to support the weight of a controller canister.

    If you are removing the controller canister from an E5724 controller shelf, a flap swings into place to block the empty bay, helping to maintain air flow and cooling.

  7. Turn the controller canister over, so that the removable cover faces up.

  8. Place the controller canister on a flat, static-free surface.

Step 3: Remove a HIC

Remove the original HIC so you can replace it with an upgraded one.

Steps
  1. Remove the controller canister's cover by pressing down on the button and sliding the cover off.

  2. Confirm that the green LED inside the controller (between the battery and the DIMMs) is off.

    If this green LED is on, the controller is still using battery power. You must wait for this LED to go off before removing any components.

    28 dwg e2800 internal cache active led maint e5700

    (1) Cache Active LED

    (2) Battery

  3. Using a #1 Phillips screwdriver, remove the screws that attach the HIC faceplate to the controller canister.

    There are four screws: one on the top, one on the side, and two on the front.

    28 dwg e2800 hic faceplace screws maint e5700
  4. Remove the HIC faceplate.

  5. Using your fingers or a Phillips screwdriver, loosen the three thumbscrews that secure the HIC to the controller card.

  6. Carefully detach the HIC from the controller card by lifting the card up and sliding it back.

    Caution Be careful not to scratch or bump the components on the bottom of the HIC or on the top of the controller card.
    28 dwg e2800 hic thumbscrews maint e5700

    (1) Host interface card (HIC)

    (2) Thumbscrews

  7. Place the HIC on a static-free surface.

Step 4: Install the new HIC

Install the new host HIC.

Caution Possible loss of data access — Never install a HIC in an E5700 controller canister if that HIC was designed for another E-Series controller. In addition, if you have a duplex configuration, both controllers and both HICs must be identical. The presence of incompatible or mismatched HICs will cause the controllers to lock down when you apply power.
Steps
  1. Unpack the new HIC and the new HIC faceplate.

  2. Using a #1 Phillips screwdriver, remove the four screws that attach the HIC faceplate to the controller canister, and remove the faceplate.

    28 dwg e2800 hic faceplace screws maint e5700
  3. Align the three thumbscrews on the HIC with the corresponding holes on the controller, and align the connector on the bottom of the HIC with the HIC interface connector on the controller card.

    Be careful not to scratch or bump the components on the bottom of the HIC or on the top of the controller card.

  4. Carefully lower the HIC into place, and seat the HIC connector by pressing gently on the HIC.

    Caution Possible equipment damage — Be very careful not to pinch the gold ribbon connector for the controller LEDs between the HIC and the thumbscrews.
    28 dwg e2800 hic thumbscrews maint e5700

    (1) Host interface card (HIC)

    (2) Thumbscrews

  5. Hand-tighten the HIC thumbscrews.

    Do not use a screwdriver, or you might over-tighten the screws.

  6. Using a #1 Phillips screwdriver, attach the new HIC faceplate to the controller canister with the four screws you removed previously.

Step 5: Reinstall controller canister

After installing the new HIC, reinstall the controller canister into the controller shelf.

Steps
  1. Reinstall the cover on the controller canister by sliding the cover from back to front until the button clicks.

  2. Turn the controller canister over, so that the removable cover faces down.

  3. With the cam handle in the open position, slide the controller canister all the way into the controller shelf.

    The following figure is an example of an E5724 controller shelf:

    28 dwg e2824 remove controller canister maint e5700

    (1) Controller canister

    (2) Cam handle

    The following figure is an example of an E5760 controller shelf:

    28 dwg e2860 add controller canister maint e5700

    (1) Controller canister

    (2) Cam handle

  4. Move the cam handle to the left to lock the controller canister in place.

  5. Reconnect all the cables you removed.

    Note Do not connect data cables to the new HIC ports at this time.
  6. (Optional) If you are upgrading HICs in a duplex configuration, repeat all steps to remove the other controller canister, remove the HIC, install the new HIC, and replace the second controller canister.

Step 6: Complete the HIC upgrade

Check the controller LEDs and seven-segment display and confirm that the controller's status is Optimal.

Steps
  1. Turn on the two power switches at the back of the controller shelf.

    • Do not turn off the power switches during the power-on process, which typically takes 90 seconds or less to complete.

    • The fans in each shelf are very loud when they first start up. The loud noise during start-up is normal.

  2. As the controller boots, check the controller LEDs and seven-segment display.

    • The seven-segment display shows the repeating sequence OS, Sd, blank to indicate that the controller is performing Start-of-day (SOD) processing. After a controller has successfully booted up, its seven-segment display should show the tray ID.

    • The amber Attention LED on the controller turns on and then turns off, unless there is an error.

    • The green Host Link LEDs remain off until you connect the host cables.

      Note The figure shows an example controller canister. Your controller might have a different number and a different type of host ports.
      e5700 hic 3 callouts maint e5700

      (1) Host Link LED (amber)

      (2) Attention LED (amber)

      (3) Seven-segment display

  3. From SANtricity System Manager, confirm that the controller's status is Optimal.

    If the status is not Optimal or if any of the Attention LEDs are on, confirm that all cables are correctly seated, and check that the HIC and the controller canister are installed correctly. If necessary, remove and reinstall the controller canister and the HIC.

    Note If you cannot resolve the problem, contact technical support.
  4. If the new HIC ports require SFP+ transceivers, install these SFPs.

  5. Connect the cables from the controller's host ports to the data hosts.

What's next?

The process of upgrading a host interface card in your storage array is complete. You can resume normal operations.