You can power on NetApp HCI after the scheduled outage is complete.
Procedure
-
Power on all the storage nodes using either the physical power button or the BMC.
-
If using the BMC, log in to each node and navigate to .
-
When all the storage nodes are online, log in to the NetApp HCI storage system and verify that all nodes are operational.