Skip to main content
ONTAP MetroCluster

Cabling the new controller module's FC-VI and HBA ports to the FC switches

Contributors netapp-driley netapp-thomi

The FC-VI ports and HBAs (host bus adapters) must be cabled to the site FC switches on each controller module in the MetroCluster configuration.