Each SolidFire chassis includes two power supply units for power redundancy. If a power supply unit fails, you must replace it as soon as possible to ensure that the chassis has a redundant power source.
Before you begin
- You have determined that the power supply unit has failed.
- You have a replacement power supply unit.
- You have verified that the second power supply unit is operating.
- You have an electrostatic discharge (ESD) wristband, or you have taken other antistatic precautions.
About this task
The instructions in this document apply if you have a one-rack unit (1U) chassis with any of the following storage and Fibre Channel models:
- SF2405
- SF3010
- SF4805
- SF6010
- SF9605
- SF9608
- SF9010
- SF19210
- SF38410
- SF-FCN-01
- FC0025
The following figure shows the back of a typical chassis with the two power supply units:
 |
Power supply units |
The location of the power supply units might vary depending on the hardware model.
Steps
- Unplug the power cord from the power supply unit that you are replacing.
- Press the release button to slide the power supply unit out of the chassis.
Attention: Ensure that you use both hands to support the weight of the power supply unit.
- Using both hands, align the edges of the replacement power supply unit with the opening in the chassis, and gently push the unit into the chassis.
Attention: Do not use excessive force when sliding the power supply unit into the chassis to prevent damage to the hardware.
- Plug in the power cord.
- Return the failed unit to NetApp by following the instructions in the box that was shipped to you.
You can contact NetApp Support for help with the replacement procedure.