You can power down an entire cluster after you have contacted NetApp Support and completed preliminary steps.
Before you begin
Prepare the cluster for shutdown by doing the following:
- Stop all I/O.
- Disconnect all iSCSI sessions.
Procedure
-
Navigate to the management virtual IP (MVIP) address on the cluster to open the Element UI.
- Note the nodes listed in the Nodes list.
- Run the Shutdown API method with the halt option specified on each Node ID in the cluster.