HI |
The master boot script has started. |
HP |
The system is checking to see if the 10/25-GbE controller firmware needs to be updated. |
RB |
The system is rebooting after applying firmware updates. |
FP |
The hardware subsystem firmware update checks have been completed. Inter-controller communication services are starting. |
HE |
The system is awaiting connectivity with the E2800 controllers and synchronizing with the SANtricity operating system.Note: If the boot-up procedure does not progress past this stage: - Confirm that the four interconnect cables between the SG6000-CN controller and the two E2800 controllers are securely connected.
- As required, replace one or more of the cables, and try again.
- If this does not resolve the issue, contact technical support.
|
HC |
The system is checking for existing StorageGRID installation data. |
HO |
The StorageGRID Appliance Installer is running. |
HA |
StorageGRID is running. |