Connecting power cords and applying power

After connecting the network cables, you are ready to apply power to the SG1000.

Steps

  1. Connect a power cord to each of the two power supply units in the SG1000.
  2. Connect these two power cords to two different power distribution units (PDUs) in the cabinet or rack.
  3. If the power button on the front of the SG1000 is not currently illuminated blue, press the button to turn on power to the controller.
    Do not press the power button again during the power-on process.
  4. If errors occur, correct any issues.
  5. Attach the front bezel to the SG1000.