Before installing the StorageGRID appliance, unpack all boxes and compare the contents to the items on the packing slip.
![]() SG5712 appliance with 12 drives installed |
![]() SG5760 appliance with no drives installed |
![]() Front bezel for the appliance |
![]() Rail kit with instructions |
![]() SG5760: Sixty drives |
![]() SG5760: Handles |
![]() SG5760: Back brackets and cage nuts for square-hole rack installation |
![]() Two power cords for your country. Your cabinet might have special power cords that you use instead of the power cords that ship with the appliance. |
![]() Two optical cables for the FC interconnect ports Eight SFP+ transceivers, compatible with both the four 16Gb/s FC interconnect ports and the four 10-GbE network ports |