Unpacking the boxes

Before installing the StorageGRID appliance, unpack all boxes and compare the contents to the items on the packing slip.

SG6060


SG6000-CN controller

SG6000-CN controller


SG5760 4U appliance

E2860 controller shelf with no drives installed


Front Bezels

Two front bezels

Rail kit

Two rail kits with instructions


Drive

60 drives (2 SSD and 58 NL-SAS)


SG5760 handles

Four handles


Back brackets and cage nuts for SG5760

Back brackets and cage nuts for square-hole rack installation

 

SG6060 expansion shelf


SG5760 4U appliance

Expansion shelf with no drives installed


Front Bezel DE460C

Front bezel


Drive

60 NL-SAS drives

Rail kit

One rail kit with instructions


SG5760 handles

Four handles


Back brackets and cage nuts for SG5760

Back brackets and cage nuts for square-hole rack installation

SGF6024


SG6000-CN controller

SG6000-CN controller


EF570 Controller Shelf

EF570 flash array with 24 solid state (flash) drives installed


SG6024 Front Bezels
Two front bezels

Rail kit

Two rail kits with instructions

Endcaps

Shelf endcaps

 

Cables and connectors

The shipment for the StorageGRID appliance includes the following cables and connectors:


Power cords

Four power cords for your country

Your cabinet might have special power cords that you use instead of the power cords that ship with the appliance.


Optical cables and SFPs

Four optical cables for the FC interconnect ports

Four SFP+ transceivers, which support 16-Gb/s FC


SAS Cables

Optional: Two SAS cables for connecting each SG6060 expansion shelf