SG6060: Cabling the optional expansion shelves
Suggest changes
-
PDF of this doc site
- Install and upgrade software
-
Install and maintain hardware
- SG5700 storage appliances
- SG5600 storage appliances
-
Configure and manage
- Administer StorageGRID
- Use StorageGRID
-
Monitor and troubleshoot
- Monitor a StorageGRID system
Collection of separate PDF docs
Creating your file...
This may take a few minutes. Thanks for your patience.
Your file is ready
If you are using expansion shelves, you must connect them to the E2860 controller shelf. You can have a maximum of two expansion shelves for each SG6060 appliance.
What you'll need
-
You have the two SAS cables shipped with each expansion shelf.
-
You have installed the expansion shelves in the cabinet or rack that contains the E2860 controller shelf.
Step
Connect each expansion shelf to the E2860 controller shelf as shown in the diagram.
This drawing shows two expansion shelves. If you have only one, connect IOM A to controller A and connect IOM B to controller B.
Description | |
---|---|
1 |
SG6000-CN |
2 |
E2860 controller shelf |
3 |
Controller A |
4 |
Controller B |
5 |
Expansion shelf 1 |
6 |
IOM A for expansion shelf 1 |
7 |
IOM B for expansion shelf 1 |
8 |
Expansion shelf 2 |
9 |
IOM A for expansion shelf 2 |
10 |
IOM B for expansion shelf 2 |