Skip to main content

Installation and setup workflow for ASA r2 storage systems

Contributors netapp-jsnyder netapp-aherbin

To install and configure your ASA r2 system, you review the hardware requirements, prepare your site, install and cable the hardware components, power on the system, and set up your ONTAP cluster.

Review the hardware requirements to install your ASA r2 storage system.

To prepare to install your ASA r2 system, you need to get the site ready, check the environmental and electrical requirements, and ensure there's enough rack space. Then, unpack the equipment, compare its contents to the packing slip, and register the hardware to access support benefits.

To install the hardware, install the rail kits for your storage system and shelves, and then install and secure your storage system in the cabinet or telco rack. Next, slide the shelves onto the rails. Finally, attach cable management devices to the rear of the storage system for organized cable routing.

To cable the hardware, first connect the storage controllers to your network and then connect the controllers to your storage shelves.

Before you power on the controllers, power on each NS224 shelf and assign a unique shelf ID to ensure each shelf is uniquely identified within the setup.