network interface migrate-all
- PDF of this doc site
Collection of separate PDF docs
Creating your file...
Migrate all data logical interfaces away from the specified node
Availability: This command is available to cluster administrators at the admin privilege level.
Description
The network interface migrate-all
command migrates all data logical interfaces from the node you specify.
Manual migration of a logical interface can take up to 15 seconds to complete. Logical interface migration is a best-effort command and can only be completed if the destination node and port are operational. Logical interface migration requires that the logical interface be pre-configured with valid failover rules to facilitate failover to a remote node. |
Logical interfaces for SAN protocols do not support migration. Attempts to do so will result in an error. |
On some cloud platforms, this operation might perform changes to the external route tables. |
Parameters
-node <nodename>
- Node-
Use this parameter to specify the node from which all logical interfaces are migrated. Each data logical interface is migrated to another node in the cluster, assuming that the logical interface is configured with failover rules that specify an operational node and port.
[-port {<netport>|<ifgrp>}]
- Port-
Use this parameter to specify the port from which all logical interfaces are migrated. This option cannot be used with asynchronous migrations. If this parameter is not specified, then logical interfaces will be migrated away from all ports on the specified node.
Examples
The following example migrates all data logical interfaces from the current (local) node.
cluster1::> network interface migrate-all -node local