Chassis replacement workflow - AFF A20, AFF A30, and AFF A50
-
PDF of this doc site

Collection of separate PDF docs
Creating your file...
This may take a few minutes. Thanks for your patience.
Your file is ready
Get started with replacing the chassis of your AFF A20, AFF A30, or AFF A50 storage system by reviewing the replacement requirements, shutting down the controllers, replacing the chassis, and verifying system operations.
To replace the chassis, you must meet certain requirements.
Shut down the controllers so you can perform maintenance on the chassis.
Replacing the chassis includes moving the drives and any drive blanks, controllers (with the power supplies), and bezel from the impaired chassis to the new chassis, and swapping out the impaired chassis with the new chassis of the same model as the impaired chassis.
Verify the HA state of the chassis and return the failed part to NetApp.