Complete the chassis replacement - AFF A70 and AFF A90
Reboot the controllers, verify system health, and return the failed part to NetApp to complete the final step in the AFF A70 and AFF A90 chassis replacement procedure.
Step 1: Boot the controllers and perform giveback
Boot ONTAP on the controllers and perform controller giveback to return storage ownership.
-
Check the console output:
-
If the controller boots to the LOADER prompt, reboot the controller with the
boot_ontapcommand. -
If the console displays
waiting for givebackafter the reboot, log into the partner controller and check that the replaced controller is ready for giveback with thestorage failover showcommand.
-
-
Perform the giveback:
-
Connect the console cable to the partner controller.
-
Give back the controller with the
storage failover giveback -fromnode localcommand.
-
Step 2: Verify storage system health
After the controller giveback completes, verify system health using Active IQ Config Advisor. Address any issues found.
Step 3: Return the failed part to NetApp
Return the failed part to NetApp, as described in the RMA instructions shipped with the kit. See the Part Return and Replacements page for further information.