Skip to main content
Install and maintain

Chassis replace requirements - ASA A70 and ASA A90

Contributors netapp-jsnyder

The chassis is the physical enclosure housing all the controller components such as the controller/CPU unit, power supply, and I/O.

Before replacing the chassis, make sure to review the following requirements.

  • Make sure all other components in the system are functioning properly; if not, contact technical support.

  • You can use the chassis replacement procedure with all versions of ONTAP supported by your system.

  • The chassis replacement procedure is written with the assumption that you are moving the bezel, NVMe drives, and controller modules to the new chassis, and that the replacement chassis is a new component from NetApp.

  • The chassis replacement procedure is disruptive. For a two-node cluster, you will have a complete service outage and a partial outage in a multi-node cluster.