Skip to main content
Install and maintain

Controller replacement workflow - AFF C800

Contributors dougthomp

Replace the controller in your AFF C800 storage system by shutting down the impaired controller, removing and replacing the controller, restoring the system configuration, and returning control of storage resources to the replacement controller.

Review the controller replacement requirements, including system compatibility, required tools, ONTAP credentials, and component functionality verification.

Shut down or take over the impaired controller so that the healthy controller continues to serve data from the impaired controller storage.

Remove the impaired controller, move the FRU components to the replacement controller module, and install the replacement controller module in the enclosure.

Verify the low-level system configuration of the replacement controller and reconfigure system settings as necessary.

Recable the controller and transfer the ownership of storage resources back to the replacement controller.

Verify the LIFs, check cluster health, and return the failed part to NetApp.