Prepare to replace the chassis - FAS70 and FAS90
Prepare to replace the impaired chassis in your FAS70 or FAS90 system by identifying the impaired chassis, verifying the replacement components, and labeling the cables and controller module.
Step 1: Locate and monitor your system
You should open a console session and save sessions logs for future reference, and also turn on the system location LED to find the impaired chassis.
-
Connect to the serial console port to interface with and monitor the system.
-
Locate and turn on the controller's Location LED:
-
Use the
system controller location-led show
command to show the current state of the location LED. -
Change the state of the location LED to "on":
system controller location-led modify -node node1 -state on
The Location LED remains lit for 30 minutes.
-
Step 2: Verify replacement components
You should verify that you received the necessary components, remove them from packaging, and save the packaging.
-
Before opening the packaging, you should look at the packaging label and verify:
-
Component part number.
-
Part description.
-
Quantity in the box.
-
-
Remove the contents from the packaging and use the packaging to returning the failed component to NetApp.
Step 3: Label the cables
You should label the cables before removing them from the I/O modules on the back of the system.
-
Label all the cables associated with the storage system. This aids recabling later in this procedure.
-
If you are not already properly grounded, ground yourself.
After you’ve prepared to replace your FAS70 or FAS90 chassis hardware, you need to shut down the controller.