FAS50 chassis replacement workflow
Follow these workflow steps to replace your FAS50 storage system chassis.
To replace the chassis, you must meet certain requirements.
Shut down the controllers so you can perform maintenance on the chassis.
Replacing the chassis includes moving the drive blanks, any caching modules, controllers (with the power supplies), and bezel from the impaired chassis to the new chassis. You then swap out the impaired chassis with a new chassis of the same model.
Verify the HA state of the chassis and return the failed part to NetApp.



