The requested article is not available. Either it doesn't apply to this version of the product or the relevant information is organized differently in this version of the docs. You can search, browse, or go back to the other version.
Controller replacement workflow - FAS50
-
PDF of this doc site

Collection of separate PDF docs
Creating your file...
This may take a few minutes. Thanks for your patience.
Your file is ready
Follow these workflow steps to replace your controller.
To replace the controller, you must meet certain requirements.
Shut down or take over the impaired controller so that the healthy controller continues to serve data from the impaired controller storage.
Replacing the controller includes removing the impaired controller, moving FRU components to the replacement controller, installing the replacement controller in the chassis, setting the time and date, and then recabling.
Verify the low-level system configuration of the replacement controller and reconfigure system settings as necessary.
Transfer the ownership of storage resources back to the replacement controller.
Verify the LIFs, check cluster health, and return the failed part to NetApp.