Hardware installation and setup
  ASA AFF A220: Hardware installation and setup
    Videos - High-level instructions
    Guide -- Detailed instructions
      Preparing for installation
      Installing the hardware
      Cabling controllers to your network
        Cabling a two-node switchless cluster, unified network configuration
      Cabling controllers to drive shelves
        Cabling storage on an HA pair with external drive shelves
      Completing system setup and configuration
        Completing system setup and configuration using a Windows or Mac laptop
        Completing system setup and configuration if you are not using a Windows or Mac laptop
  ASA AFF A400: Hardware installation and setup
    Videos - High-level instructions
    Guide -- Detailed instructions
      Preparing for installation
      Installing the hardware
      Cabling a two-node switchless cluster
      Cabling controllers to drive shelves
        Cabling the controllers to a single drive shelf
        Cabling the controllers to two drive shelves
        Cabling the controllers to SAS drive shelves
      Completing system setup and configuration
        Completing system setup and configuration using a Windows or Mac laptop
        Completing system setup and configuration if you are not using a Windows or Mac laptop
  ASA AFF A700: Hardware installation and setup
    Videos - High-level instructions
    Guide -- Detailed instructions
      Preparing for installation
      Installing the hardware
      Cabling controllers to your network
        Cabling a two-node switchless cluster
      Cabling controllers to drive shelves
        Cabling storage
      Completing system setup and configuration
        Completing system setup and configuration using a Windows or Mac laptop
        Completing system setup and configuration if you are not using a Windows or Mac laptop
  ASA AFF A220: Hardware installation and setup
    Videos - High-level instructions
    Guide -- Detailed instructions
      Preparing for installation
      Installing the hardware
      Cabling controllers to your network
        Cabling a two-node switchless cluster, unified network configuration
      Cabling controllers to drive shelves
        Cabling storage on an HA pair with external drive shelves
      Completing system setup and configuration
        Completing system setup and configuration using a Windows or Mac laptop
        Completing system setup and configuration if you are not using a Windows or Mac laptop
  ASA AFF A400: Hardware installation and setup
    Videos - High-level instructions
    Guide -- Detailed instructions
      Preparing for installation
      Installing the hardware
      Cabling a two-node switchless cluster
      Cabling controllers to drive shelves
        Cabling the controllers to a single drive shelf
        Cabling the controllers to two drive shelves
        Cabling the controllers to SAS drive shelves
      Completing system setup and configuration
        Completing system setup and configuration using a Windows or Mac laptop
        Completing system setup and configuration if you are not using a Windows or Mac laptop
  ASA AFF A700: Hardware installation and setup
    Videos - High-level instructions
    Guide -- Detailed instructions
      Preparing for installation
      Installing the hardware
      Cabling controllers to your network
        Cabling a two-node switchless cluster
      Cabling controllers to drive shelves
        Cabling storage
      Completing system setup and configuration
        Completing system setup and configuration using a Windows or Mac laptop
        Completing system setup and configuration if you are not using a Windows or Mac laptop
Software setup
  All SAN Array software setup
    Supported All SAN Array configurations
    How to set up an ASA
    ASA limitations and restrictions
    ASA host settings and utilities
    Ways to identify an ASA system
  All SAN Array software setup
    Supported All SAN Array configurations
    How to set up an ASA
    ASA limitations and restrictions
    ASA host settings and utilities
    Ways to identify an ASA system
ASA AFF A220 systems - FRU replacement
  Caching module replacement
    Workflow diagram
    Replacing the caching module
      Shutting down the impaired controller
        Shutting down the node
      Opening the system
      Replacing a caching module
      Reinstalling the controller module
      Running system-level diagnostics
      Completing the replacement process
  NVMEM battery replacement
    Workflow diagram
    Replacing the NVMEM battery
      Shutting down the impaired controller
        Shutting down the node
      Opening the system
      Replacing the NVMEM battery
      Reinstalling the controller module
      Running system-level diagnostics
      Completing the replacement process
  Power supply replacement
    Workflow diagram
    Swapping out a power supply
    Completing the replacement process
  Controller module replacement
    Workflow diagram
    Replacing the controller module
      Shutting down the impaired controller
        Shutting down the node
      Replacing the controller module hardware
        Opening the system
        Moving the NVMEM battery
        Moving the boot media
        Moving the DIMMs
        Moving a caching module, if present
        Installing the controller
      Restoring and verifying the system configuration
        Verifying and setting the HA state of the controller module
        Running system-level diagnostics
      Completing system restoration
        Recabling the system
        Reassigning disks
          Verifying the system ID change on an HA system
          Manually reassigning the system ID on a stand-alone system in ONTAP
        Installing licenses for the replacement node in ONTAP
        Restoring Storage and Volume Encryption functionality
        Verifying LIFs and registering the serial number
      Completing the replacement process
  DIMM replacement
    Workflow diagram
    Replacing a DIMM
      Shutting down the impaired controller
        Shutting down the node
      Opening the system
      Replacing the DIMMs
      Reinstalling the controller module
      Running system-level diagnostics
      Completing the replacement process
  Boot media replacement
    Workflow diagram
    Replacing the boot media
      Shutting down the node
      Opening the system
      Replacing the boot media
      Transferring the boot image to the boot media
      Completing the replacement process
  RTC battery replacement
    Workflow diagram
    Replacing the real-time clock battery
      Shutting down the impaired controller
        Shutting down the node
      Opening the system
      Replacing the RTC battery
      Reinstalling the controller
      Completing the replacement process
  Chassis replacement
    Workflow diagram
    Replacing the chassis
      Shutting down the controllers when replacing a chassis
        Shutting down the node
      Swapping out a power supply
      Removing the controller module
      Moving drives to the new chassis
      Replacing a chassis from within the equipment rack or system cabinet
      Installing the controller
      Verifying and setting the HA state of the chassis
      Running system-level diagnostics
      Completing the replacement process
  Caching module replacement
    Workflow diagram
    Replacing the caching module
      Shutting down the impaired controller
        Shutting down the node
      Opening the system
      Replacing a caching module
      Reinstalling the controller module
      Running system-level diagnostics
      Completing the replacement process
  NVMEM battery replacement
    Workflow diagram
    Replacing the NVMEM battery
      Shutting down the impaired controller
        Shutting down the node
      Opening the system
      Replacing the NVMEM battery
      Reinstalling the controller module
      Running system-level diagnostics
      Completing the replacement process
  Power supply replacement
    Workflow diagram
    Swapping out a power supply
    Completing the replacement process
  Controller module replacement
    Workflow diagram
    Replacing the controller module
      Shutting down the impaired controller
        Shutting down the node
      Replacing the controller module hardware
        Opening the system
        Moving the NVMEM battery
        Moving the boot media
        Moving the DIMMs
        Moving a caching module, if present
        Installing the controller
      Restoring and verifying the system configuration
        Verifying and setting the HA state of the controller module
        Running system-level diagnostics
      Completing system restoration
        Recabling the system
        Reassigning disks
          Verifying the system ID change on an HA system
          Manually reassigning the system ID on a stand-alone system in ONTAP
        Installing licenses for the replacement node in ONTAP
        Restoring Storage and Volume Encryption functionality
        Verifying LIFs and registering the serial number
      Completing the replacement process
  DIMM replacement
    Workflow diagram
    Replacing a DIMM
      Shutting down the impaired controller
        Shutting down the node
      Opening the system
      Replacing the DIMMs
      Reinstalling the controller module
      Running system-level diagnostics
      Completing the replacement process
  Boot media replacement
    Workflow diagram
    Replacing the boot media
      Shutting down the node
      Opening the system
      Replacing the boot media
      Transferring the boot image to the boot media
      Completing the replacement process
  RTC battery replacement
    Workflow diagram
    Replacing the real-time clock battery
      Shutting down the impaired controller
        Shutting down the node
      Opening the system
      Replacing the RTC battery
      Reinstalling the controller
      Completing the replacement process
  Chassis replacement
    Workflow diagram
    Replacing the chassis
      Shutting down the controllers when replacing a chassis
        Shutting down the node
      Swapping out a power supply
      Removing the controller module
      Moving drives to the new chassis
      Replacing a chassis from within the equipment rack or system cabinet
      Installing the controller
      Verifying and setting the HA state of the chassis
      Running system-level diagnostics
      Completing the replacement process
ASA AFF A400 systems - FRU replacement
  Power supply replacement
    Replacing a power supply
    Completing the replacement process
  Fan replacement
    Hot-swapping a fan module
    Completing the replacement process
  NVDIMM battery replacement
    Replacing the NVDIMM battery
      Shutting down the impaired controller
        Shutting down the node
        Shutting down a node in a two-node MetroCluster configuration
      Removing the controller module
      Replacing the NVDIMM battery
      Installing the controller module
      Running diagnostics
      Restoring the controller module to operation after running diagnostics
      Switching back aggregates in a two-node MetroCluster configuration
      Completing the replacement process
  Controller module replacement
    Replacing the controller module
      Shutting down the impaired controller
        Shutting down the node
        Shutting down a node in a two-node MetroCluster configuration
      Replacing the controller module hardware
        Removing the controller module
        Moving the power supplies
        Moving the NVDIMM battery
        Moving the boot media
        Moving the PCIe risers and mezzanine card
        Moving the DIMMs
        Installing the controller module
      Setting and verifying system time after replacing the controller
      Running diagnostics
      Completing system restoration
        Recabling the system
        Reassigning disks
          Verifying the system ID change on an HA system
          Manually reassigning the system ID on systems in a two-node MetroCluster configuration
        Installing licenses for the replacement node in ONTAP
        Restoring Storage and Volume Encryption functionality
        Verifying LIFs and registering the serial number
        Switching back aggregates in a two-node MetroCluster configuration
      Completing the replacement process
  System DIMM replacement
    Replacing a DIMM
      Shutting down the impaired controller
        Shutting down the node
        Shutting down a node in a two-node MetroCluster configuration
      Removing the controller module
      Replacing system DIMMs
      Installing the controller module
      Running diagnostics
      Restoring the controller module to operation after running diagnostics
      Switching back aggregates in a two-node MetroCluster configuration
      Completing the replacement process
  NVDIMM replacement
    Replacing an NVDIMM
      Shutting down the impaired controller
        Shutting down the node
        Shutting down a node in a two-node MetroCluster configuration
      Removing the controller module
      Replacing the NVDIMM
      Installing the controller module
      Running diagnostics
      Restoring the controller module to operation after running diagnostics
      Switching back aggregates in a two-node MetroCluster configuration
      Completing the replacement process
  Boot media replacement
    Replacing the boot media
      Shutting down the impaired controller
        Shutting down the node
        Shutting down a node in a two-node MetroCluster configuration
      Removing the controller module
      Replacing the boot media
      Transferring the boot image to the boot media
      Booting the recovery image
        Booting the recovery image in most systems
        Booting the recovery image in a two-node MetroCluster configuration
      Switching back aggregates in a two-node MetroCluster configuration
      Completing the replacement process
  RTC battery replacement
    Replacing the real-time clock battery
      Shutting down the impaired controller
        Shutting down the node
        Shutting down a node in a two-node MetroCluster configuration
      Removing the controller module
      Replacing the RTC battery
      Installing the controller module
      Switching back aggregates in a two-node MetroCluster configuration
      Completing the replacement process
  PCIe or mezzanine card replacement
    Replacing a PCIe or mezzanine card
      Shutting down the impaired controller
        Shutting down the node
        Shutting down a node in a two-node MetroCluster configuration
      Removing the controller module
      Replacing a PCIe card
      Replacing the mezzanine card
      Installing the controller module
      Switching back aggregates in a two-node MetroCluster configuration
      Restoring the controller module to operation after running diagnostics
      Completing the replacement process
  Chassis replacement
    Replacing the chassis
      Shutting down the controllers when replacing a chassis
        Shutting down the nodes
        Shutting down a node in a two-node MetroCluster configuration
      Removing the controller modules
      Moving the fans
      Replacing a chassis from within the equipment rack or system cabinet
      Installing the controller modules
      Verifying and setting the HA state of the chassis
      Running diagnostics
      Switching back aggregates in a two-node MetroCluster configuration
      Completing the replacement process
  Power supply replacement
    Replacing a power supply
    Completing the replacement process
  Fan replacement
    Hot-swapping a fan module
    Completing the replacement process
  NVDIMM battery replacement
    Replacing the NVDIMM battery
      Shutting down the impaired controller
        Shutting down the node
        Shutting down a node in a two-node MetroCluster configuration
      Removing the controller module
      Replacing the NVDIMM battery
      Installing the controller module
      Running diagnostics
      Restoring the controller module to operation after running diagnostics
      Switching back aggregates in a two-node MetroCluster configuration
      Completing the replacement process
  Controller module replacement
    Replacing the controller module
      Shutting down the impaired controller
        Shutting down the node
        Shutting down a node in a two-node MetroCluster configuration
      Replacing the controller module hardware
        Removing the controller module
        Moving the power supplies
        Moving the NVDIMM battery
        Moving the boot media
        Moving the PCIe risers and mezzanine card
        Moving the DIMMs
        Installing the controller module
      Setting and verifying system time after replacing the controller
      Running diagnostics
      Completing system restoration
        Recabling the system
        Reassigning disks
          Verifying the system ID change on an HA system
          Manually reassigning the system ID on systems in a two-node MetroCluster configuration
        Installing licenses for the replacement node in ONTAP
        Restoring Storage and Volume Encryption functionality
        Verifying LIFs and registering the serial number
        Switching back aggregates in a two-node MetroCluster configuration
      Completing the replacement process
  System DIMM replacement
    Replacing a DIMM
      Shutting down the impaired controller
        Shutting down the node
        Shutting down a node in a two-node MetroCluster configuration
      Removing the controller module
      Replacing system DIMMs
      Installing the controller module
      Running diagnostics
      Restoring the controller module to operation after running diagnostics
      Switching back aggregates in a two-node MetroCluster configuration
      Completing the replacement process
  NVDIMM replacement
    Replacing an NVDIMM
      Shutting down the impaired controller
        Shutting down the node
        Shutting down a node in a two-node MetroCluster configuration
      Removing the controller module
      Replacing the NVDIMM
      Installing the controller module
      Running diagnostics
      Restoring the controller module to operation after running diagnostics
      Switching back aggregates in a two-node MetroCluster configuration
      Completing the replacement process
  Boot media replacement
    Replacing the boot media
      Shutting down the impaired controller
        Shutting down the node
        Shutting down a node in a two-node MetroCluster configuration
      Removing the controller module
      Replacing the boot media
      Transferring the boot image to the boot media
      Booting the recovery image
        Booting the recovery image in most systems
        Booting the recovery image in a two-node MetroCluster configuration
      Switching back aggregates in a two-node MetroCluster configuration
      Completing the replacement process
  RTC battery replacement
    Replacing the real-time clock battery
      Shutting down the impaired controller
        Shutting down the node
        Shutting down a node in a two-node MetroCluster configuration
      Removing the controller module
      Replacing the RTC battery
      Installing the controller module
      Switching back aggregates in a two-node MetroCluster configuration
      Completing the replacement process
  PCIe or mezzanine card replacement
    Replacing a PCIe or mezzanine card
      Shutting down the impaired controller
        Shutting down the node
        Shutting down a node in a two-node MetroCluster configuration
      Removing the controller module
      Replacing a PCIe card
      Replacing the mezzanine card
      Installing the controller module
      Switching back aggregates in a two-node MetroCluster configuration
      Restoring the controller module to operation after running diagnostics
      Completing the replacement process
  Chassis replacement
    Replacing the chassis
      Shutting down the controllers when replacing a chassis
        Shutting down the nodes
        Shutting down a node in a two-node MetroCluster configuration
      Removing the controller modules
      Moving the fans
      Replacing a chassis from within the equipment rack or system cabinet
      Installing the controller modules
      Verifying and setting the HA state of the chassis
      Running diagnostics
      Switching back aggregates in a two-node MetroCluster configuration
      Completing the replacement process
ASA AFF A700 systems - FRU replacement
  DCPM module (containing NVRAM10 battery) replacement
    Replacing the de-stage controller power module containing the NVRAM10 Battery
      Replacing the DCPM module
      Completing the replacement process
        Disposing of batteries
  Power supply replacement
    Swapping out a power supply
    Completing the replacement process
  Fan module replacement
    Swapping out a fan
    Completing the replacement process
  Controller module replacement
    Replacing the controller module
      Shutting down the impaired controller
        Shutting down the impaired node
        Shutting down a node in a two-node MetroCluster configuration
      Replacing the controller module hardware
        Opening the controller module
        Moving the boot media
        Moving the system DIMMs
        Installing the controller
      Setting and verifying system time after replacing the controller
      Restoring and verifying the system configuration
        Verifying and setting the HA state of the controller module
        Running system-level diagnostics
      Completing system restoration
        Recabling the system
        Installing licenses for the replacement node in ONTAP
        Restoring Storage and Volume Encryption functionality
        Verifying LIFs and registering the serial number
        Switching back aggregates in a two-node MetroCluster configuration
      Completing the replacement process
  DIMM replacement
    Replacing a DIMM
      Shutting down the impaired controller
        Shutting down the impaired node
        Shutting down a node in a two-node MetroCluster configuration
      Opening the controller module
      Replacing the DIMMs
      Installing the controller
      Running system-level diagnostics
      Switching back aggregates in a two-node MetroCluster configuration
      Completing the replacement process
  NVRAM10 module and/or DIMM replacement
    Replacing the NVRAM module and/or NVRAM DIMMs
      Pre-replacement tasks for systems that use Storage Encryption
      Shutting down the impaired controller
        Shutting down the impaired node
        Shutting down a node in a two-node MetroCluster configuration
      Replacing the NVRAM module
      Replacing a NVRAM DIMM
      Rebooting the controller after FRU replacement
      Reassigning disks
        Verifying the system ID change on an HA system
        Manually reassigning the system ID on systems in a two-node MetroCluster configuration
      Restoring Storage and Volume Encryption functionality
      Completing the replacement process
  Boot media replacement
    Replacing the boot media
      Shutting down the impaired controller
        Shutting down the impaired node
        Shutting down a node in a two-node MetroCluster configuration
      Opening the controller module
      Replacing the boot media
      Transferring the boot image to the boot media
      Booting the recovery image
        Booting the recovery image in most systems
        Booting the recovery image in a two-node MetroCluster configuration
      Switching back aggregates in a two-node MetroCluster configuration
      Completing the replacement process
  RTC battery replacement
    Replacing the real-time clock battery
      Shutting down the impaired controller
        Shutting down the impaired node
        Shutting down a node in a two-node MetroCluster configuration
      Opening the controller module
      Replacing the RTC battery
      Installing the controller
      Switching back aggregates in a two-node MetroCluster configuration
      Completing the replacement process
  I/O module replacement
    Replacing an I/O module
      Shutting down the impaired controller
        Shutting down the impaired node
        Shutting down a node in a two-node MetroCluster configuration
      Replacing I/O modules
      Rebooting the controller after PCIe module replacement
      Switching back aggregates in a two-node MetroCluster configuration
      Completing the replacement process
  Chassis replacement
    Replacing the chassis
      Shutting down the controllers when replacing a chassis
        Shutting down the node
        Shutting down a node in a two-node MetroCluster configuration
      Removing the power supplies
      Removing the fans
      Removing the controller module
      Removing the I/O modules
      Removing the De-stage Controller Power Module
      Replacing a chassis from within the equipment rack or system cabinet
      Moving the USB LED module to the new chassis
      Installing the de-stage controller power module when replacing the chassis
      Installing fans into the chassis
      Installing I/O modules
      Installing the power supplies
      Installing the controller
      Verifying and setting the HA state of the chassis
      Running system-level diagnostics
      Switching back aggregates in a two-node MetroCluster configuration
      Completing the replacement process
  DCPM module (containing NVRAM10 battery) replacement
    Replacing the de-stage controller power module containing the NVRAM10 Battery
      Replacing the DCPM module
      Completing the replacement process
        Disposing of batteries
  Power supply replacement
    Swapping out a power supply
    Completing the replacement process
  Fan module replacement
    Swapping out a fan
    Completing the replacement process
  Controller module replacement
    Replacing the controller module
      Shutting down the impaired controller
        Shutting down the impaired node
        Shutting down a node in a two-node MetroCluster configuration
      Replacing the controller module hardware
        Opening the controller module
        Moving the boot media
        Moving the system DIMMs
        Installing the controller
      Setting and verifying system time after replacing the controller
      Restoring and verifying the system configuration
        Verifying and setting the HA state of the controller module
        Running system-level diagnostics
      Completing system restoration
        Recabling the system
        Installing licenses for the replacement node in ONTAP
        Restoring Storage and Volume Encryption functionality
        Verifying LIFs and registering the serial number
        Switching back aggregates in a two-node MetroCluster configuration
      Completing the replacement process
  DIMM replacement
    Replacing a DIMM
      Shutting down the impaired controller
        Shutting down the impaired node
        Shutting down a node in a two-node MetroCluster configuration
      Opening the controller module
      Replacing the DIMMs
      Installing the controller
      Running system-level diagnostics
      Switching back aggregates in a two-node MetroCluster configuration
      Completing the replacement process
  NVRAM10 module and/or DIMM replacement
    Replacing the NVRAM module and/or NVRAM DIMMs
      Pre-replacement tasks for systems that use Storage Encryption
      Shutting down the impaired controller
        Shutting down the impaired node
        Shutting down a node in a two-node MetroCluster configuration
      Replacing the NVRAM module
      Replacing a NVRAM DIMM
      Rebooting the controller after FRU replacement
      Reassigning disks
        Verifying the system ID change on an HA system
        Manually reassigning the system ID on systems in a two-node MetroCluster configuration
      Restoring Storage and Volume Encryption functionality
      Completing the replacement process
  Boot media replacement
    Replacing the boot media
      Shutting down the impaired controller
        Shutting down the impaired node
        Shutting down a node in a two-node MetroCluster configuration
      Opening the controller module
      Replacing the boot media
      Transferring the boot image to the boot media
      Booting the recovery image
        Booting the recovery image in most systems
        Booting the recovery image in a two-node MetroCluster configuration
      Switching back aggregates in a two-node MetroCluster configuration
      Completing the replacement process
  RTC battery replacement
    Replacing the real-time clock battery
      Shutting down the impaired controller
        Shutting down the impaired node
        Shutting down a node in a two-node MetroCluster configuration
      Opening the controller module
      Replacing the RTC battery
      Installing the controller
      Switching back aggregates in a two-node MetroCluster configuration
      Completing the replacement process
  I/O module replacement
    Replacing an I/O module
      Shutting down the impaired controller
        Shutting down the impaired node
        Shutting down a node in a two-node MetroCluster configuration
      Replacing I/O modules
      Rebooting the controller after PCIe module replacement
      Switching back aggregates in a two-node MetroCluster configuration
      Completing the replacement process
  Chassis replacement
    Replacing the chassis
      Shutting down the controllers when replacing a chassis
        Shutting down the node
        Shutting down a node in a two-node MetroCluster configuration
      Removing the power supplies
      Removing the fans
      Removing the controller module
      Removing the I/O modules
      Removing the De-stage Controller Power Module
      Replacing a chassis from within the equipment rack or system cabinet
      Moving the USB LED module to the new chassis
      Installing the de-stage controller power module when replacing the chassis
      Installing fans into the chassis
      Installing I/O modules
      Installing the power supplies
      Installing the controller
      Verifying and setting the HA state of the chassis
      Running system-level diagnostics
      Switching back aggregates in a two-node MetroCluster configuration
      Completing the replacement process
Drive shelf information
  Links to shelf information
  Links to shelf information
Using this Documentation Center
  Tour
  Help
    Searching for content
    Applying a filter
    Printing content
    Saving and sharing links
    Providing feedback
    Downloading PDFs or EPUBs for offline use
  Tips
    Better search results
    Mobile devices
    Mixed-language environment
  Tour
  Help
    Searching for content
    Applying a filter
    Printing content
    Saving and sharing links
    Providing feedback
    Downloading PDFs or EPUBs for offline use
  Tips
    Better search results
    Mobile devices
    Mixed-language environment
Legal notices
  Copyright, trademark, patent, and privacy
    Copyright
    Trademark
    Patent
    Privacy
  Open source
    Disk shelves
  Copyright, trademark, patent, and privacy
    Copyright
    Trademark
    Patent
    Privacy
  Open source
    Disk shelves