Hardware installation and setup
ASA AFF A220: Hardware installation and setup
Videos - High-level instructions
Guide -- Detailed instructions
Preparing for installation
Installing the hardware
Cabling controllers to your network
Cabling a two-node switchless cluster, unified network configuration
Cabling controllers to drive shelves
Cabling storage on an HA pair with external drive shelves
Completing system setup and configuration
Completing system setup and configuration using a Windows or Mac laptop
Completing system setup and configuration if you are not using a Windows or Mac laptop
AFF ASA A250: Hardware installation and setup
Videos
Detailed guide
Preparing for installation
Installing the hardware
Cabling controllers
Cabling controllers to a cluster
Cabling a two node switchless cluster
Cabling configuration-dependant options
Cabling to a Fibre Channel host network
Cabling to a 25GbE data or host network
Cabling the controllers to a single drive shelf
Completing system setup and configuration
Completing system setup and configuration if network discovery is enabled
Completing system setup and configuration if network discovery is not enabled
ASA AFF A400: Hardware installation and setup
Videos - High-level instructions
Guide -- Detailed instructions
Preparing for installation
Installing the hardware
Cabling a two-node switchless cluster
Cabling controllers to drive shelves
Cabling the controllers to a single drive shelf
Cabling the controllers to two drive shelves
Cabling the controllers to SAS drive shelves
Completing system setup and configuration
Completing system setup and configuration using a Windows or Mac laptop
Completing system setup and configuration if you are not using a Windows or Mac laptop
ASA AFF A700: Hardware installation and setup
Quick guide
Videos
Detailed guide
Preparing for installation
Installing the hardware
Cabling controllers to your network
Cabling a two-node switchless cluster
Cabling controllers to drive shelves
Cabling the controllers to DS212C or DS224C drive shelves
Cabling the controllers to a single NS224 drive shelf in AFF A700 and ASA AFF A700 systems running ONTAP 9.8 and later only
Cabling the controllers to two NS224 drive shelves in AFF A700 and ASA AFF A700 systems running ONTAP 9.8 and later only
Completing system setup and configuration
Completing system setup and configuration if network discovery is enabled
Completing system setup and configuration if you are not using a Windows or Mac laptop
AFF ASA A800: Hardware installation and setup
Videos
Detailed guide
Preparing for installation
Installing the hardware
Cabling controllers
Cabling controllers to a cluster
Cabling a two-node switchless cluster
Cabling configuration-dependant options
Cabling to a Fibre Channel host network
Cabling to a 10GbE host network
Cabling the controllers to a single drive shelf
Cabling the controllers to two drive shelves
Completing system setup and configuration
Completing system setup and configuration if network discovery is enabled
Completing system setup and configuration if network discovery is not enabled
ASA AFF A220: Hardware installation and setup
Videos - High-level instructions
Guide -- Detailed instructions
Preparing for installation
Installing the hardware
Cabling controllers to your network
Cabling a two-node switchless cluster, unified network configuration
Cabling controllers to drive shelves
Cabling storage on an HA pair with external drive shelves
Completing system setup and configuration
Completing system setup and configuration using a Windows or Mac laptop
Completing system setup and configuration if you are not using a Windows or Mac laptop
AFF ASA A250: Hardware installation and setup
Videos
Detailed guide
Preparing for installation
Installing the hardware
Cabling controllers
Cabling controllers to a cluster
Cabling a two node switchless cluster
Cabling configuration-dependant options
Cabling to a Fibre Channel host network
Cabling to a 25GbE data or host network
Cabling the controllers to a single drive shelf
Completing system setup and configuration
Completing system setup and configuration if network discovery is enabled
Completing system setup and configuration if network discovery is not enabled
ASA AFF A400: Hardware installation and setup
Videos - High-level instructions
Guide -- Detailed instructions
Preparing for installation
Installing the hardware
Cabling a two-node switchless cluster
Cabling controllers to drive shelves
Cabling the controllers to a single drive shelf
Cabling the controllers to two drive shelves
Cabling the controllers to SAS drive shelves
Completing system setup and configuration
Completing system setup and configuration using a Windows or Mac laptop
Completing system setup and configuration if you are not using a Windows or Mac laptop
ASA AFF A700: Hardware installation and setup
Quick guide
Videos
Detailed guide
Preparing for installation
Installing the hardware
Cabling controllers to your network
Cabling a two-node switchless cluster
Cabling controllers to drive shelves
Cabling the controllers to DS212C or DS224C drive shelves
Cabling the controllers to a single NS224 drive shelf in AFF A700 and ASA AFF A700 systems running ONTAP 9.8 and later only
Cabling the controllers to two NS224 drive shelves in AFF A700 and ASA AFF A700 systems running ONTAP 9.8 and later only
Completing system setup and configuration
Completing system setup and configuration if network discovery is enabled
Completing system setup and configuration if you are not using a Windows or Mac laptop
AFF ASA A800: Hardware installation and setup
Videos
Detailed guide
Preparing for installation
Installing the hardware
Cabling controllers
Cabling controllers to a cluster
Cabling a two-node switchless cluster
Cabling configuration-dependant options
Cabling to a Fibre Channel host network
Cabling to a 10GbE host network
Cabling the controllers to a single drive shelf
Cabling the controllers to two drive shelves
Completing system setup and configuration
Completing system setup and configuration if network discovery is enabled
Completing system setup and configuration if network discovery is not enabled
Software setup
All SAN Array software setup
Supported All SAN Array configurations
How to set up an ASA
ASA limitations and restrictions
Support for persistent ports
ASA host settings and utilities
Ways to identify an ASA system
All SAN Array software setup
Supported All SAN Array configurations
How to set up an ASA
ASA limitations and restrictions
Support for persistent ports
ASA host settings and utilities
Ways to identify an ASA system
ASA AFF A220 systems - FRU replacement
Caching module replacement
Workflow diagram
Replacing the caching module
Shutting down the impaired controller
Shutting down the node
Opening the system
Replacing a caching module
Reinstalling the controller module
Running system-level diagnostics
Completing the replacement process
NVMEM battery replacement
Workflow diagram
Replacing the NVMEM battery
Shutting down the impaired controller
Shutting down the node
Opening the system
Replacing the NVMEM battery
Reinstalling the controller module
Running system-level diagnostics
Completing the replacement process
Power supply replacement
Workflow diagram
Swapping out a power supply
Completing the replacement process
Controller module replacement
Workflow diagram
Replacing the controller module
Shutting down the impaired controller
Shutting down the node
Replacing the controller module hardware
Opening the system
Moving the NVMEM battery
Moving the boot media
Moving the DIMMs
Moving a caching module, if present
Installing the controller
Restoring and verifying the system configuration
Verifying and setting the HA state of the controller module
Running system-level diagnostics
Completing system restoration
Recabling the system
Reassigning disks
Verifying the system ID change on an HA system
Manually reassigning the system ID on a stand-alone system in ONTAP
Installing licenses for the replacement node in ONTAP
Restoring Storage and Volume Encryption functionality
Verifying LIFs and registering the serial number
Completing the replacement process
DIMM replacement
Workflow diagram
Replacing a DIMM
Shutting down the impaired controller
Shutting down the node
Opening the system
Replacing the DIMMs
Reinstalling the controller module
Running system-level diagnostics
Completing the replacement process
Boot media replacement
Workflow diagram
Replacing the boot media
Shutting down the node
Opening the system
Replacing the boot media
Transferring the boot image to the boot media
Completing the replacement process
RTC battery replacement
Workflow diagram
Replacing the real-time clock battery
Shutting down the impaired controller
Shutting down the node
Opening the system
Replacing the RTC battery
Reinstalling the controller
Completing the replacement process
Chassis replacement
Workflow diagram
Replacing the chassis
Shutting down the controllers when replacing a chassis
Shutting down the node
Swapping out a power supply
Removing the controller module
Moving drives to the new chassis
Replacing a chassis from within the equipment rack or system cabinet
Installing the controller
Verifying and setting the HA state of the chassis
Running system-level diagnostics
Completing the replacement process
Caching module replacement
Workflow diagram
Replacing the caching module
Shutting down the impaired controller
Shutting down the node
Opening the system
Replacing a caching module
Reinstalling the controller module
Running system-level diagnostics
Completing the replacement process
NVMEM battery replacement
Workflow diagram
Replacing the NVMEM battery
Shutting down the impaired controller
Shutting down the node
Opening the system
Replacing the NVMEM battery
Reinstalling the controller module
Running system-level diagnostics
Completing the replacement process
Power supply replacement
Workflow diagram
Swapping out a power supply
Completing the replacement process
Controller module replacement
Workflow diagram
Replacing the controller module
Shutting down the impaired controller
Shutting down the node
Replacing the controller module hardware
Opening the system
Moving the NVMEM battery
Moving the boot media
Moving the DIMMs
Moving a caching module, if present
Installing the controller
Restoring and verifying the system configuration
Verifying and setting the HA state of the controller module
Running system-level diagnostics
Completing system restoration
Recabling the system
Reassigning disks
Verifying the system ID change on an HA system
Manually reassigning the system ID on a stand-alone system in ONTAP
Installing licenses for the replacement node in ONTAP
Restoring Storage and Volume Encryption functionality
Verifying LIFs and registering the serial number
Completing the replacement process
DIMM replacement
Workflow diagram
Replacing a DIMM
Shutting down the impaired controller
Shutting down the node
Opening the system
Replacing the DIMMs
Reinstalling the controller module
Running system-level diagnostics
Completing the replacement process
Boot media replacement
Workflow diagram
Replacing the boot media
Shutting down the node
Opening the system
Replacing the boot media
Transferring the boot image to the boot media
Completing the replacement process
RTC battery replacement
Workflow diagram
Replacing the real-time clock battery
Shutting down the impaired controller
Shutting down the node
Opening the system
Replacing the RTC battery
Reinstalling the controller
Completing the replacement process
Chassis replacement
Workflow diagram
Replacing the chassis
Shutting down the controllers when replacing a chassis
Shutting down the node
Swapping out a power supply
Removing the controller module
Moving drives to the new chassis
Replacing a chassis from within the equipment rack or system cabinet
Installing the controller
Verifying and setting the HA state of the chassis
Running system-level diagnostics
Completing the replacement process
AFF ASA A250 systems - FRU replacement
Boot media replacement
Replacing the boot media
Pre-shutdown checks for onboard encryption keys
Checking NVE or NSE on systems running ONTAP 9.6 and later
Shutting down the impaired controller
Completing node shutdown
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing the boot media
Transferring the boot image to the boot media
Booting the recovery image
Completing the replacement process
Chassis replacement
Replacing the chassis
Shutting down the controllers when replacing a chassis
Shutting down the nodes
Removing the controller modules
Moving drives to the new chassis
Replacing a chassis from within the equipment rack or system cabinet
Installing the controller modules
Running diagnostics
Completing the replacement process
Controller moduler replacement
Replacing the controller module
Shutting down the impaired controller
Shutting down the impaired node
Replacing the controller module hardware
Removing the controller module
Moving the power supply
Moving the fans
Moving the boot media
Moving the DIMMs
Moving a mezzanine card
Moving the NV battery
Installing the controller module
Running diagnostics
Completing system restoration
Recabling the system
Installing licenses for the replacement node in ONTAP
Restoring Storage and Volume Encryption functionality
Verifying LIFs and registering the serial number
Completing the replacement process
DIMM replacement
Replacing a DIMM
Shutting down the impaired controller
Shutting down the impaired node
Removing the controller module
Replacing a DIMM
Installing the controller module
Running diagnostics
Completing the replacement process
Fan replacement
Shutting down the impaired node
Removing the controller module
Replacing a fan
Reinstalling the controller module
Completing the replacement process
Mezzanine card replacement
Replacing or installing a mezzanine card
Shutting down the impaired controller
Shutting down the impaired node
Removing the controller module
Replacing or installing a mezzanine card
Reinstalling the controller module
Completing the replacement process
NVMEM battery replacement
Replacing the NVMEM battery
Shutting down the impaired controller
Shutting down the impaired node
Removing the controller module
Replacing the NV battery
Installing the controller module
Running diagnostics
Completing the replacement process
Power supply replacement
Replacing a power supply
Completing the replacement process
RTC battery replacement
Replacing the real-time clock battery
Shutting down the impaired controller
Shutting down the impaired node
Removing the controller module
Replacing the RTC battery
Reinstalling the controller module
Completing the replacement process
Boot media replacement
Replacing the boot media
Pre-shutdown checks for onboard encryption keys
Checking NVE or NSE on systems running ONTAP 9.6 and later
Shutting down the impaired controller
Completing node shutdown
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing the boot media
Transferring the boot image to the boot media
Booting the recovery image
Completing the replacement process
Chassis replacement
Replacing the chassis
Shutting down the controllers when replacing a chassis
Shutting down the nodes
Removing the controller modules
Moving drives to the new chassis
Replacing a chassis from within the equipment rack or system cabinet
Installing the controller modules
Running diagnostics
Completing the replacement process
Controller moduler replacement
Replacing the controller module
Shutting down the impaired controller
Shutting down the impaired node
Replacing the controller module hardware
Removing the controller module
Moving the power supply
Moving the fans
Moving the boot media
Moving the DIMMs
Moving a mezzanine card
Moving the NV battery
Installing the controller module
Running diagnostics
Completing system restoration
Recabling the system
Installing licenses for the replacement node in ONTAP
Restoring Storage and Volume Encryption functionality
Verifying LIFs and registering the serial number
Completing the replacement process
DIMM replacement
Replacing a DIMM
Shutting down the impaired controller
Shutting down the impaired node
Removing the controller module
Replacing a DIMM
Installing the controller module
Running diagnostics
Completing the replacement process
Fan replacement
Shutting down the impaired node
Removing the controller module
Replacing a fan
Reinstalling the controller module
Completing the replacement process
Mezzanine card replacement
Replacing or installing a mezzanine card
Shutting down the impaired controller
Shutting down the impaired node
Removing the controller module
Replacing or installing a mezzanine card
Reinstalling the controller module
Completing the replacement process
NVMEM battery replacement
Replacing the NVMEM battery
Shutting down the impaired controller
Shutting down the impaired node
Removing the controller module
Replacing the NV battery
Installing the controller module
Running diagnostics
Completing the replacement process
Power supply replacement
Replacing a power supply
Completing the replacement process
RTC battery replacement
Replacing the real-time clock battery
Shutting down the impaired controller
Shutting down the impaired node
Removing the controller module
Replacing the RTC battery
Reinstalling the controller module
Completing the replacement process
ASA AFF A400 systems - FRU replacement
Power supply replacement
Replacing a power supply
Completing the replacement process
Fan replacement
Hot-swapping a fan module
Completing the replacement process
NVDIMM battery replacement
Replacing the NVDIMM battery
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing the NVDIMM battery
Installing the controller module
Running diagnostics
Restoring the controller module to operation after running diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Controller module replacement
Replacing the controller module
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Replacing the controller module hardware
Removing the controller module
Moving the power supplies
Moving the NVDIMM battery
Moving the boot media
Moving the PCIe risers and mezzanine card
Moving the DIMMs
Installing the controller module
Setting and verifying system time after replacing the controller
Running diagnostics
Completing system restoration
Recabling the system
Reassigning disks
Verifying the system ID change on an HA system
Manually reassigning the system ID on systems in a two-node MetroCluster configuration
Installing licenses for the replacement node in ONTAP
Restoring Storage and Volume Encryption functionality
Verifying LIFs and registering the serial number
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
System DIMM replacement
Replacing a DIMM
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing system DIMMs
Installing the controller module
Running diagnostics
Restoring the controller module to operation after running diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
NVDIMM replacement
Replacing an NVDIMM
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing the NVDIMM
Installing the controller module
Running diagnostics
Restoring the controller module to operation after running diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Boot media replacement
Replacing the boot media
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing the boot media
Transferring the boot image to the boot media
Booting the recovery image
Booting the recovery image in most systems
Booting the recovery image in a two-node MetroCluster configuration
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
RTC battery replacement
Replacing the real-time clock battery
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing the RTC battery
Installing the controller module
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
PCIe or mezzanine card replacement
Replacing a PCIe or mezzanine card
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing a PCIe card
Replacing the mezzanine card
Installing the controller module
Switching back aggregates in a two-node MetroCluster configuration
Restoring the controller module to operation after running diagnostics
Completing the replacement process
Chassis replacement
Replacing the chassis
Shutting down the controllers when replacing a chassis
Shutting down the nodes
Shutting down a node in a two-node MetroCluster configuration
Removing the controller modules
Moving the fans
Replacing a chassis from within the equipment rack or system cabinet
Installing the controller modules
Verifying and setting the HA state of the chassis
Running diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Power supply replacement
Replacing a power supply
Completing the replacement process
Fan replacement
Hot-swapping a fan module
Completing the replacement process
NVDIMM battery replacement
Replacing the NVDIMM battery
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing the NVDIMM battery
Installing the controller module
Running diagnostics
Restoring the controller module to operation after running diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Controller module replacement
Replacing the controller module
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Replacing the controller module hardware
Removing the controller module
Moving the power supplies
Moving the NVDIMM battery
Moving the boot media
Moving the PCIe risers and mezzanine card
Moving the DIMMs
Installing the controller module
Setting and verifying system time after replacing the controller
Running diagnostics
Completing system restoration
Recabling the system
Reassigning disks
Verifying the system ID change on an HA system
Manually reassigning the system ID on systems in a two-node MetroCluster configuration
Installing licenses for the replacement node in ONTAP
Restoring Storage and Volume Encryption functionality
Verifying LIFs and registering the serial number
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
System DIMM replacement
Replacing a DIMM
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing system DIMMs
Installing the controller module
Running diagnostics
Restoring the controller module to operation after running diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
NVDIMM replacement
Replacing an NVDIMM
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing the NVDIMM
Installing the controller module
Running diagnostics
Restoring the controller module to operation after running diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Boot media replacement
Replacing the boot media
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing the boot media
Transferring the boot image to the boot media
Booting the recovery image
Booting the recovery image in most systems
Booting the recovery image in a two-node MetroCluster configuration
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
RTC battery replacement
Replacing the real-time clock battery
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing the RTC battery
Installing the controller module
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
PCIe or mezzanine card replacement
Replacing a PCIe or mezzanine card
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing a PCIe card
Replacing the mezzanine card
Installing the controller module
Switching back aggregates in a two-node MetroCluster configuration
Restoring the controller module to operation after running diagnostics
Completing the replacement process
Chassis replacement
Replacing the chassis
Shutting down the controllers when replacing a chassis
Shutting down the nodes
Shutting down a node in a two-node MetroCluster configuration
Removing the controller modules
Moving the fans
Replacing a chassis from within the equipment rack or system cabinet
Installing the controller modules
Verifying and setting the HA state of the chassis
Running diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
ASA AFF A700 systems - FRU replacement
DCPM module (containing NVRAM10 battery) replacement
Replacing the de-stage controller power module containing the NVRAM10 Battery
Replacing the DCPM module
Completing the replacement process
Disposing of batteries
Power supply replacement
Swapping out a power supply
Completing the replacement process
Fan module replacement
Swapping out a fan
Completing the replacement process
Controller module replacement
Replacing the controller module
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Replacing the controller module hardware
Opening the controller module
Moving the boot media
Moving the system DIMMs
Installing the controller
Setting and verifying system time after replacing the controller
Restoring and verifying the system configuration
Verifying and setting the HA state of the controller module
Running system-level diagnostics
Completing system restoration
Recabling the system
Installing licenses for the replacement node in ONTAP
Restoring Storage and Volume Encryption functionality
Verifying LIFs and registering the serial number
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
DIMM replacement
Replacing a DIMM
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Opening the controller module
Replacing the DIMMs
Installing the controller
Running system-level diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
NVRAM10 module and/or DIMM replacement
Replacing the NVRAM module and/or NVRAM DIMMs
Pre-replacement tasks for systems that use Storage Encryption
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Replacing the NVRAM module
Replacing a NVRAM DIMM
Rebooting the controller after FRU replacement
Reassigning disks
Verifying the system ID change on an HA system
Manually reassigning the system ID on systems in a two-node MetroCluster configuration
Restoring Storage and Volume Encryption functionality
Completing the replacement process
Boot media replacement
Replacing the boot media
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Opening the controller module
Replacing the boot media
Transferring the boot image to the boot media
Booting the recovery image
Booting the recovery image in most systems
Booting the recovery image in a two-node MetroCluster configuration
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
RTC battery replacement
Replacing the real-time clock battery
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Opening the controller module
Replacing the RTC battery
Installing the controller
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
I/O module replacement
Replacing an I/O module
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Replacing I/O modules
Rebooting the controller after PCIe module replacement
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Chassis replacement
Replacing the chassis
Shutting down the controllers when replacing a chassis
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Removing the power supplies
Removing the fans
Removing the controller module
Removing the I/O modules
Removing the De-stage Controller Power Module
Replacing a chassis from within the equipment rack or system cabinet
Moving the USB LED module to the new chassis
Installing the de-stage controller power module when replacing the chassis
Installing fans into the chassis
Installing I/O modules
Installing the power supplies
Installing the controller
Verifying and setting the HA state of the chassis
Running system-level diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
X91148A module replacement
Adding an X91148A module in an ASA AFF A700 with open slots
Adding an X91148A module as a NIC module in a system with open slots
Adding an X91148A module as a storage module in a system with open slots
Adding an X91148A storage module in a system with no open slots
Adding an X91148A module as a NIC module in a system with no open slots
Adding an X91148A module as a storage module in a system with no open slots
X9170A module replacement
Replacing adding or replacing a core dump module
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Adding or replacing an X9170A core dump module
Rebooting the controller after FRU replacement
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
DCPM module (containing NVRAM10 battery) replacement
Replacing the de-stage controller power module containing the NVRAM10 Battery
Replacing the DCPM module
Completing the replacement process
Disposing of batteries
Power supply replacement
Swapping out a power supply
Completing the replacement process
Fan module replacement
Swapping out a fan
Completing the replacement process
Controller module replacement
Replacing the controller module
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Replacing the controller module hardware
Opening the controller module
Moving the boot media
Moving the system DIMMs
Installing the controller
Setting and verifying system time after replacing the controller
Restoring and verifying the system configuration
Verifying and setting the HA state of the controller module
Running system-level diagnostics
Completing system restoration
Recabling the system
Installing licenses for the replacement node in ONTAP
Restoring Storage and Volume Encryption functionality
Verifying LIFs and registering the serial number
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
DIMM replacement
Replacing a DIMM
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Opening the controller module
Replacing the DIMMs
Installing the controller
Running system-level diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
NVRAM10 module and/or DIMM replacement
Replacing the NVRAM module and/or NVRAM DIMMs
Pre-replacement tasks for systems that use Storage Encryption
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Replacing the NVRAM module
Replacing a NVRAM DIMM
Rebooting the controller after FRU replacement
Reassigning disks
Verifying the system ID change on an HA system
Manually reassigning the system ID on systems in a two-node MetroCluster configuration
Restoring Storage and Volume Encryption functionality
Completing the replacement process
Boot media replacement
Replacing the boot media
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Opening the controller module
Replacing the boot media
Transferring the boot image to the boot media
Booting the recovery image
Booting the recovery image in most systems
Booting the recovery image in a two-node MetroCluster configuration
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
RTC battery replacement
Replacing the real-time clock battery
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Opening the controller module
Replacing the RTC battery
Installing the controller
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
I/O module replacement
Replacing an I/O module
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Replacing I/O modules
Rebooting the controller after PCIe module replacement
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Chassis replacement
Replacing the chassis
Shutting down the controllers when replacing a chassis
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Removing the power supplies
Removing the fans
Removing the controller module
Removing the I/O modules
Removing the De-stage Controller Power Module
Replacing a chassis from within the equipment rack or system cabinet
Moving the USB LED module to the new chassis
Installing the de-stage controller power module when replacing the chassis
Installing fans into the chassis
Installing I/O modules
Installing the power supplies
Installing the controller
Verifying and setting the HA state of the chassis
Running system-level diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
X91148A module replacement
Adding an X91148A module in an ASA AFF A700 with open slots
Adding an X91148A module as a NIC module in a system with open slots
Adding an X91148A module as a storage module in a system with open slots
Adding an X91148A storage module in a system with no open slots
Adding an X91148A module as a NIC module in a system with no open slots
Adding an X91148A module as a storage module in a system with no open slots
X9170A module replacement
Replacing adding or replacing a core dump module
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Adding or replacing an X9170A core dump module
Rebooting the controller after FRU replacement
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
AFF ASA A800 systems - FRU replacement
Boot media replacement
Replacing the boot media
Pre-shutdown checks for onboard encryption keys
Checking NVE or NSE on systems running ONTAP 9.5 and earlier
Checking NVE or NSE on systems running ONTAP 9.6 and later
Shutting down the impaired controller
Completing node shutdown
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing the boot media
Transferring the boot image to the boot media
Booting the recovery image
Completing the replacement process
Chassis replacement
Replacing the chassis
Shutting down the controllers when replacing a chassis
Shutting down the nodes
Shutting down a node in a two-node MetroCluster configuration
Removing the controller modules
Moving drives to the new chassis
Replacing a chassis from within the equipment rack or system cabinet
Installing the controller modules
Verifying and setting the HA state of the chassis
Running diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Controller module replacement
Replacing the controller module
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Replacing the controller module hardware
Removing the controller module
Moving the power supplies
Moving the fans
Moving the NVDIMM battery
Removing the PCIe risers
Moving system DIMMs
Moving the NVDIMMs
Moving the boot media
Installing the PCIe risers
Installing the controller module
Setting and verifying system time after replacing the controller
Verifying and setting the HA state of the controller module
Running diagnostics
Completing system restoration
Recabling the system
Reassigning disks
Verifying the system ID change on an HA system
Manually reassigning the system ID on a stand-alone system in ONTAP
Manually reassigning the system ID on systems in a two-node MetroCluster configuration
Installing licenses for the replacement node in ONTAP
Restoring Storage and Volume Encryption functionality
Verifying LIFs and registering the serial number
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
System DIMM replacement
Replacing a DIMM
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing a DIMM
Reinstalling the controller module and booting the system
Running diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Fan replacement
Shutting down the impaired node
Removing the controller module
Replacing a fan
Reinstalling the controller module
Completing the replacement process
NVDIMM battery replacement
Replacing the NVDIMM battery
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing the NVDIMM battery
Reinstalling the controller module and booting the system
Running diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
NVDIMM replacement
Replacing an NVDIMM
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing the NVDIMM
Reinstalling the controller module and booting the system
Running diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
PCIe card replacement
Replacing a PCIe card
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing a PCIe card
Reinstalling the controller module
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Power supply replacement
Replacing a power supply
Completing the replacement process
RTC battery replacement
Replacing the real-time clock battery
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Removing the PCIe risers
Replacing the RTC battery
Installing the PCIe risers
Reinstalling the controller module
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Boot media replacement
Replacing the boot media
Pre-shutdown checks for onboard encryption keys
Checking NVE or NSE on systems running ONTAP 9.5 and earlier
Checking NVE or NSE on systems running ONTAP 9.6 and later
Shutting down the impaired controller
Completing node shutdown
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing the boot media
Transferring the boot image to the boot media
Booting the recovery image
Completing the replacement process
Chassis replacement
Replacing the chassis
Shutting down the controllers when replacing a chassis
Shutting down the nodes
Shutting down a node in a two-node MetroCluster configuration
Removing the controller modules
Moving drives to the new chassis
Replacing a chassis from within the equipment rack or system cabinet
Installing the controller modules
Verifying and setting the HA state of the chassis
Running diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Controller module replacement
Replacing the controller module
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Replacing the controller module hardware
Removing the controller module
Moving the power supplies
Moving the fans
Moving the NVDIMM battery
Removing the PCIe risers
Moving system DIMMs
Moving the NVDIMMs
Moving the boot media
Installing the PCIe risers
Installing the controller module
Setting and verifying system time after replacing the controller
Verifying and setting the HA state of the controller module
Running diagnostics
Completing system restoration
Recabling the system
Reassigning disks
Verifying the system ID change on an HA system
Manually reassigning the system ID on a stand-alone system in ONTAP
Manually reassigning the system ID on systems in a two-node MetroCluster configuration
Installing licenses for the replacement node in ONTAP
Restoring Storage and Volume Encryption functionality
Verifying LIFs and registering the serial number
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
System DIMM replacement
Replacing a DIMM
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing a DIMM
Reinstalling the controller module and booting the system
Running diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Fan replacement
Shutting down the impaired node
Removing the controller module
Replacing a fan
Reinstalling the controller module
Completing the replacement process
NVDIMM battery replacement
Replacing the NVDIMM battery
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing the NVDIMM battery
Reinstalling the controller module and booting the system
Running diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
NVDIMM replacement
Replacing an NVDIMM
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing the NVDIMM
Reinstalling the controller module and booting the system
Running diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
PCIe card replacement
Replacing a PCIe card
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing a PCIe card
Reinstalling the controller module
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Power supply replacement
Replacing a power supply
Completing the replacement process
RTC battery replacement
Replacing the real-time clock battery
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Removing the PCIe risers
Replacing the RTC battery
Installing the PCIe risers
Reinstalling the controller module
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Drive shelf information
Links to shelf information
Links to shelf information
Using this Documentation Center
Tour
Help
Searching for content
Applying a filter
Printing content
Saving and sharing links
Providing feedback
Downloading PDFs or EPUBs for offline use
Tips
Better search results
Mobile devices
Mixed-language environment
Tour
Help
Searching for content
Applying a filter
Printing content
Saving and sharing links
Providing feedback
Downloading PDFs or EPUBs for offline use
Tips
Better search results
Mobile devices
Mixed-language environment
Legal notices
Copyright, trademark, patent, privacy, and machine translation
Copyright
Trademark
Patent
Privacy
Machine translation
Open source
Disk shelves
Copyright, trademark, patent, privacy, and machine translation
Copyright
Trademark
Patent
Privacy
Machine translation
Open source
Disk shelves