AFF A800 systems
Installation and setup
Quick guide
Videos
Detailed guide
Preparing for installation
Installing the hardware
Cabling controllers
Cabling controllers to a cluster
Cabling a two-node switchless cluster
Cabling a switched cluster
Cabling configuration-dependant options
Cabling to a Fibre Channel host network
Cabling to a 10GbE host network
Cabling the controllers to a single drive shelf
Cabling the controllers to two drive shelves
Completing system setup and configuration
Completing system setup and configuration if network discovery is enabled
Completing system setup and configuration if network discovery is not enabled
Internal disk drive replacement
Workflow diagram
Video overview
Hot-swapping an embedded drive
Hot-swapping a drive
Hot-swapping a disk drive
How to send comments about documentation and receive update notifications
NVDIMM battery replacement
Replacing the NVDIMM battery
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing the NVDIMM battery
Reinstalling the controller module and booting the system
Running diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Power supply replacement
Replacing a power supply
Completing the replacement process
Fan replacement
Shutting down the impaired node
Removing the controller module
Replacing a fan
Reinstalling the controller module
Completing the replacement process
Controller module replacement
Replacing the controller module
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Replacing the controller module hardware
Removing the controller module
Moving the power supplies
Moving the fans
Moving the NVDIMM battery
Removing the PCIe risers
Moving system DIMMs
Moving the NVDIMMs
Moving the boot media
Installing the PCIe risers
Installing the controller module
Setting and verifying system time after replacing the controller
Verifying and setting the HA state of the controller module
Running diagnostics
Completing system restoration
Recabling the system
Reassigning disks
Verifying the system ID change on an HA system
Manually reassigning the system ID on a stand-alone system in ONTAP
Manually reassigning the system ID on systems in a two-node MetroCluster configuration
Installing licenses for the replacement node in ONTAP
Restoring Storage and Volume Encryption functionality
Verifying LIFs and registering the serial number
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
System DIMM replacement
Replacing a DIMM
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing a DIMM
Reinstalling the controller module and booting the system
Running diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
NVDIMM replacement
Replacing an NVDIMM
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing the NVDIMM
Reinstalling the controller module and booting the system
Running diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Boot media replacement
Replacing the boot media
Pre-shutdown checks for onboard encryption keys
Checking NVE or NSE on systems running ONTAP 9.5 and earlier
Checking NVE or NSE on systems running ONTAP 9.6 and later
Shutting down the impaired controller
Completing node shutdown
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing the boot media
Transferring the boot image to the boot media
Booting the recovery image
Completing the replacement process
RTC battery replacement
Replacing the real-time clock battery
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Removing the PCIe risers
Replacing the RTC battery
Installing the PCIe risers
Reinstalling the controller module
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
PCIe card replacement
Replacing a PCIe card
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing a PCIe card
Reinstalling the controller module
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Chassis replacement
Replacing the chassis
Shutting down the controllers when replacing a chassis
Shutting down the nodes
Shutting down a node in a two-node MetroCluster configuration
Removing the controller modules
Moving drives to the new chassis
Replacing a chassis from within the equipment rack or system cabinet
Installing the controller modules
Verifying and setting the HA state of the chassis
Running diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Installation and setup
Quick guide
Videos
Detailed guide
Preparing for installation
Installing the hardware
Cabling controllers
Cabling controllers to a cluster
Cabling a two-node switchless cluster
Cabling a switched cluster
Cabling configuration-dependant options
Cabling to a Fibre Channel host network
Cabling to a 10GbE host network
Cabling the controllers to a single drive shelf
Cabling the controllers to two drive shelves
Completing system setup and configuration
Completing system setup and configuration if network discovery is enabled
Completing system setup and configuration if network discovery is not enabled
Internal disk drive replacement
Workflow diagram
Video overview
Hot-swapping an embedded drive
Hot-swapping a drive
Hot-swapping a disk drive
How to send comments about documentation and receive update notifications
NVDIMM battery replacement
Replacing the NVDIMM battery
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing the NVDIMM battery
Reinstalling the controller module and booting the system
Running diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Power supply replacement
Replacing a power supply
Completing the replacement process
Fan replacement
Shutting down the impaired node
Removing the controller module
Replacing a fan
Reinstalling the controller module
Completing the replacement process
Controller module replacement
Replacing the controller module
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Replacing the controller module hardware
Removing the controller module
Moving the power supplies
Moving the fans
Moving the NVDIMM battery
Removing the PCIe risers
Moving system DIMMs
Moving the NVDIMMs
Moving the boot media
Installing the PCIe risers
Installing the controller module
Setting and verifying system time after replacing the controller
Verifying and setting the HA state of the controller module
Running diagnostics
Completing system restoration
Recabling the system
Reassigning disks
Verifying the system ID change on an HA system
Manually reassigning the system ID on a stand-alone system in ONTAP
Manually reassigning the system ID on systems in a two-node MetroCluster configuration
Installing licenses for the replacement node in ONTAP
Restoring Storage and Volume Encryption functionality
Verifying LIFs and registering the serial number
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
System DIMM replacement
Replacing a DIMM
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing a DIMM
Reinstalling the controller module and booting the system
Running diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
NVDIMM replacement
Replacing an NVDIMM
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing the NVDIMM
Reinstalling the controller module and booting the system
Running diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Boot media replacement
Replacing the boot media
Pre-shutdown checks for onboard encryption keys
Checking NVE or NSE on systems running ONTAP 9.5 and earlier
Checking NVE or NSE on systems running ONTAP 9.6 and later
Shutting down the impaired controller
Completing node shutdown
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing the boot media
Transferring the boot image to the boot media
Booting the recovery image
Completing the replacement process
RTC battery replacement
Replacing the real-time clock battery
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Removing the PCIe risers
Replacing the RTC battery
Installing the PCIe risers
Reinstalling the controller module
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
PCIe card replacement
Replacing a PCIe card
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing a PCIe card
Reinstalling the controller module
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Chassis replacement
Replacing the chassis
Shutting down the controllers when replacing a chassis
Shutting down the nodes
Shutting down a node in a two-node MetroCluster configuration
Removing the controller modules
Moving drives to the new chassis
Replacing a chassis from within the equipment rack or system cabinet
Installing the controller modules
Verifying and setting the HA state of the chassis
Running diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
AFF A700 and FAS9000 systems
Installation and setup
Quick guide
Videos
Detailed guide
Preparing for installation
Installing the hardware
Cabling controllers to your network
Cabling a two-node switchless cluster
Cabling a switched cluster
Cabling controllers to drive shelves
Cabling the controllers to DS212C or DS224C drive shelves
Cabling the controllers to a single NS224 drive shelf in AFF A700 and ASA AFF A700 systems running ONTAP 9.8 and later only
Cabling the controllers to two NS224 drive shelves in AFF A700 and ASA AFF A700 systems running ONTAP 9.8 and later only
Completing system setup and configuration
Completing system setup and configuration if network discovery is enabled
Completing system setup and configuration if you are not using a Windows or Mac laptop
Installing a two-post rail kit for AFF A700 and FAS9000 systems
Two-post support rail kit installation instructions
Caching and/or core dump module replacement
Replacing the caching module or adding/replacing a core dump module
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Replacing or adding a caching module
Adding or replacing an X9170A core dump module
Rebooting the controller after FRU replacement
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Caching module hot-swap
Hot-swapping a caching module
Completing the replacement process
DCPM module (containing NVRAM10 battery) replacement
Replacing the de-stage controller power module containing the NVRAM10 Battery
Replacing the DCPM module
Completing the replacement process
Disposing of batteries
Power supply replacement
Swapping out a power supply
Completing the replacement process
Fan module replacement
Swapping out a fan
Completing the replacement process
Controller module replacement
Replacing the controller module
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Replacing the controller module hardware
Opening the controller module
Moving the boot media
Moving the system DIMMs
Installing the controller
Setting and verifying system time after replacing the controller
Restoring and verifying the system configuration
Verifying and setting the HA state of the controller module
Running system-level diagnostics
Completing system restoration
Recabling the system
Installing licenses for the replacement node in ONTAP
Restoring Storage and Volume Encryption functionality
Verifying LIFs and registering the serial number
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
DIMM replacement
Replacing a DIMM
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Opening the controller module
Replacing the DIMMs
Installing the controller
Running system-level diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
NVRAM10 module and/or DIMM replacement
Replacing the NVRAM module and/or NVRAM DIMMs
Pre-replacement tasks for systems that use Storage Encryption
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Replacing the NVRAM module
Replacing a NVRAM DIMM
Rebooting the controller after FRU replacement
Reassigning disks
Verifying the system ID change on an HA system
Manually reassigning the system ID on systems in a two-node MetroCluster configuration
Restoring Storage and Volume Encryption functionality
Completing the replacement process
Boot media replacement
Replacing the boot media
Pre-shutdown checks for onboard encryption keys
Checking NVE or NSE on systems running ONTAP 9.5 and earlier
Checking NVE or NSE on systems running ONTAP 9.6 and later
Shutting down the impaired controller
Completing node shutdown
Shutting down a node in a two-node MetroCluster configuration
Opening the controller module
Replacing the boot media
Transferring the boot image to the boot media
Booting the recovery image
Booting the recovery image in most systems
Booting the recovery image in a two-node MetroCluster configuration
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
RTC battery replacement
Replacing the real-time clock battery
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Opening the controller module
Replacing the RTC battery
Installing the controller
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
I/O module replacement
Replacing an I/O module
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Replacing I/O modules
Rebooting the controller after PCIe module replacement
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Chassis replacement
Replacing the chassis
Shutting down the controllers when replacing a chassis
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Removing the power supplies
Removing the fans
Removing the controller module
Removing the I/O modules
Removing the De-stage Controller Power Module
Replacing a chassis from within the equipment rack or system cabinet
Moving the USB LED module to the new chassis
Installing the de-stage controller power module when replacing the chassis
Installing fans into the chassis
Installing I/O modules
Installing the power supplies
Installing the controller
Verifying and setting the HA state of the chassis
Running system-level diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
LED USB module replacement
Replacing an LED USB module
Completing the replacement process
X91148A module replacement or addition
Adding an X91148A module in an AFF A700 with open slots
Adding an X91148A module as a NIC module in a system with open slots
Adding an X91148A module as a storage module in a system with open slots
Adding an X91148A storage module in a system with no open slots
Adding an X91148A module as a NIC module in a system with no open slots
Adding an X91148A module as a storage module in a system with no open slots
Installation and setup
Quick guide
Videos
Detailed guide
Preparing for installation
Installing the hardware
Cabling controllers to your network
Cabling a two-node switchless cluster
Cabling a switched cluster
Cabling controllers to drive shelves
Cabling the controllers to DS212C or DS224C drive shelves
Cabling the controllers to a single NS224 drive shelf in AFF A700 and ASA AFF A700 systems running ONTAP 9.8 and later only
Cabling the controllers to two NS224 drive shelves in AFF A700 and ASA AFF A700 systems running ONTAP 9.8 and later only
Completing system setup and configuration
Completing system setup and configuration if network discovery is enabled
Completing system setup and configuration if you are not using a Windows or Mac laptop
Installing a two-post rail kit for AFF A700 and FAS9000 systems
Two-post support rail kit installation instructions
Caching and/or core dump module replacement
Replacing the caching module or adding/replacing a core dump module
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Replacing or adding a caching module
Adding or replacing an X9170A core dump module
Rebooting the controller after FRU replacement
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Caching module hot-swap
Hot-swapping a caching module
Completing the replacement process
DCPM module (containing NVRAM10 battery) replacement
Replacing the de-stage controller power module containing the NVRAM10 Battery
Replacing the DCPM module
Completing the replacement process
Disposing of batteries
Power supply replacement
Swapping out a power supply
Completing the replacement process
Fan module replacement
Swapping out a fan
Completing the replacement process
Controller module replacement
Replacing the controller module
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Replacing the controller module hardware
Opening the controller module
Moving the boot media
Moving the system DIMMs
Installing the controller
Setting and verifying system time after replacing the controller
Restoring and verifying the system configuration
Verifying and setting the HA state of the controller module
Running system-level diagnostics
Completing system restoration
Recabling the system
Installing licenses for the replacement node in ONTAP
Restoring Storage and Volume Encryption functionality
Verifying LIFs and registering the serial number
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
DIMM replacement
Replacing a DIMM
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Opening the controller module
Replacing the DIMMs
Installing the controller
Running system-level diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
NVRAM10 module and/or DIMM replacement
Replacing the NVRAM module and/or NVRAM DIMMs
Pre-replacement tasks for systems that use Storage Encryption
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Replacing the NVRAM module
Replacing a NVRAM DIMM
Rebooting the controller after FRU replacement
Reassigning disks
Verifying the system ID change on an HA system
Manually reassigning the system ID on systems in a two-node MetroCluster configuration
Restoring Storage and Volume Encryption functionality
Completing the replacement process
Boot media replacement
Replacing the boot media
Pre-shutdown checks for onboard encryption keys
Checking NVE or NSE on systems running ONTAP 9.5 and earlier
Checking NVE or NSE on systems running ONTAP 9.6 and later
Shutting down the impaired controller
Completing node shutdown
Shutting down a node in a two-node MetroCluster configuration
Opening the controller module
Replacing the boot media
Transferring the boot image to the boot media
Booting the recovery image
Booting the recovery image in most systems
Booting the recovery image in a two-node MetroCluster configuration
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
RTC battery replacement
Replacing the real-time clock battery
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Opening the controller module
Replacing the RTC battery
Installing the controller
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
I/O module replacement
Replacing an I/O module
Shutting down the impaired controller
Shutting down the impaired node
Shutting down a node in a two-node MetroCluster configuration
Replacing I/O modules
Rebooting the controller after PCIe module replacement
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Chassis replacement
Replacing the chassis
Shutting down the controllers when replacing a chassis
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Removing the power supplies
Removing the fans
Removing the controller module
Removing the I/O modules
Removing the De-stage Controller Power Module
Replacing a chassis from within the equipment rack or system cabinet
Moving the USB LED module to the new chassis
Installing the de-stage controller power module when replacing the chassis
Installing fans into the chassis
Installing I/O modules
Installing the power supplies
Installing the controller
Verifying and setting the HA state of the chassis
Running system-level diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
LED USB module replacement
Replacing an LED USB module
Completing the replacement process
X91148A module replacement or addition
Adding an X91148A module in an AFF A700 with open slots
Adding an X91148A module as a NIC module in a system with open slots
Adding an X91148A module as a storage module in a system with open slots
Adding an X91148A storage module in a system with no open slots
Adding an X91148A module as a NIC module in a system with no open slots
Adding an X91148A module as a storage module in a system with no open slots
AFF A700s systems
Installation and Setup
Cluster configuration worksheet
Installation and setup PDF poster
Setup video
Internal disk drive replacement
Workflow diagram
Video overview
Hot-swapping an embedded drive
Hot-swapping a drive
Hot-swapping a disk drive
How to send comments about documentation and receive update notifications
NVRAM battery replacement
Replacing the NVRAM battery
Shutting down the impaired controller
Shutting down the impaired node
Removing the controller module
Replacing the NVRAM battery
Reinstalling the controller module
Completing the replacement process
NVRAM adapter replacement
Replacing the NVRAM module and/or NVRAM DIMMs
Shutting down the impaired node
Removing the controller module
Removing the NVRAM card
Reinstalling the controller module and booting the system
Reassigning disks
Verifying the system ID change on an HA system
Restoring Storage and Volume Encryption functionality
Completing the replacement process
Power supply replacement
Swapping out a power supply
Completing the replacement process
Fan replacement
Shutting down the impaired controller
Shutting down the impaired node
Removing the controller module
Replacing a fan
Reinstalling the controller module
Completing the replacement process
Controller module replacement
Replacing the controller module
Shutting down the impaired controller
Shutting down the impaired node
Replacing the controller module hardware
Removing the controller module
Moving the NVRAM card
Moving PCIe cards
Moving the boot media
Moving the fans
Moving system DIMMs
Installing the NVRAM module
Moving the NVRAM battery
Installing a PCIe riser
Moving the power supply
Installing the controller module
Verifying and setting the HA state of the controller module
Running diagnostics
Completing system restoration
Recabling the system
Installing licenses for the replacement node in ONTAP
Restoring Storage and Volume Encryption functionality
Verifying LIFs and registering the serial number
Setting and verifying system time after replacing the controller
Completing the replacement process
PCIe card replacement
Replacing a PCIe card
Shutting down the impaired controller
Shutting down the impaired node
Removing the controller module
Replacing a PCIe card
Reinstalling the controller module
Completing the replacement process
System DIMM replacement
Replacing a DIMM
Shutting down the impaired controller
Shutting down the impaired node
Removing the controller module
Replacing a DIMM
Reinstalling the controller module and booting the system
Running diagnostics
Completing the replacement process
Primary boot media replacement
Replacing the boot media
Pre-shutdown checks for onboard encryption keys
Checking NVE or NSE on systems running ONTAP 9.5 and earlier
Checking NVE or NSE on systems running ONTAP 9.6 and later
Shutting down the impaired controller
Completing node shutdown
Removing the controller module
Replacing the boot media
Transferring files to the boot media using backup recovery from the second boot media
Transferring the boot image to the boot media using a USB flash drive
Booting the recovery image
Completing the replacement process
RTC battery replacement
Replacing the real-time clock battery
Shutting down the impaired controller
Shutting down the impaired node
Removing the controller module
Replacing the RTC battery
Reinstalling the controller module
Completing the replacement process
Chassis replacement
Replacing the chassis
Shutting down the nodes
Removing the controller modules
Moving disk drives to the new chassis
Replacing a chassis from within the equipment rack or system cabinet
Installing the controllers
Running diagnostics
Completing the replacement process
Link to the System-Level Diagnostics Guide
Installation and Setup
Cluster configuration worksheet
Installation and setup PDF poster
Setup video
Internal disk drive replacement
Workflow diagram
Video overview
Hot-swapping an embedded drive
Hot-swapping a drive
Hot-swapping a disk drive
How to send comments about documentation and receive update notifications
NVRAM battery replacement
Replacing the NVRAM battery
Shutting down the impaired controller
Shutting down the impaired node
Removing the controller module
Replacing the NVRAM battery
Reinstalling the controller module
Completing the replacement process
NVRAM adapter replacement
Replacing the NVRAM module and/or NVRAM DIMMs
Shutting down the impaired node
Removing the controller module
Removing the NVRAM card
Reinstalling the controller module and booting the system
Reassigning disks
Verifying the system ID change on an HA system
Restoring Storage and Volume Encryption functionality
Completing the replacement process
Power supply replacement
Swapping out a power supply
Completing the replacement process
Fan replacement
Shutting down the impaired controller
Shutting down the impaired node
Removing the controller module
Replacing a fan
Reinstalling the controller module
Completing the replacement process
Controller module replacement
Replacing the controller module
Shutting down the impaired controller
Shutting down the impaired node
Replacing the controller module hardware
Removing the controller module
Moving the NVRAM card
Moving PCIe cards
Moving the boot media
Moving the fans
Moving system DIMMs
Installing the NVRAM module
Moving the NVRAM battery
Installing a PCIe riser
Moving the power supply
Installing the controller module
Verifying and setting the HA state of the controller module
Running diagnostics
Completing system restoration
Recabling the system
Installing licenses for the replacement node in ONTAP
Restoring Storage and Volume Encryption functionality
Verifying LIFs and registering the serial number
Setting and verifying system time after replacing the controller
Completing the replacement process
PCIe card replacement
Replacing a PCIe card
Shutting down the impaired controller
Shutting down the impaired node
Removing the controller module
Replacing a PCIe card
Reinstalling the controller module
Completing the replacement process
System DIMM replacement
Replacing a DIMM
Shutting down the impaired controller
Shutting down the impaired node
Removing the controller module
Replacing a DIMM
Reinstalling the controller module and booting the system
Running diagnostics
Completing the replacement process
Primary boot media replacement
Replacing the boot media
Pre-shutdown checks for onboard encryption keys
Checking NVE or NSE on systems running ONTAP 9.5 and earlier
Checking NVE or NSE on systems running ONTAP 9.6 and later
Shutting down the impaired controller
Completing node shutdown
Removing the controller module
Replacing the boot media
Transferring files to the boot media using backup recovery from the second boot media
Transferring the boot image to the boot media using a USB flash drive
Booting the recovery image
Completing the replacement process
RTC battery replacement
Replacing the real-time clock battery
Shutting down the impaired controller
Shutting down the impaired node
Removing the controller module
Replacing the RTC battery
Reinstalling the controller module
Completing the replacement process
Chassis replacement
Replacing the chassis
Shutting down the nodes
Removing the controller modules
Moving disk drives to the new chassis
Replacing a chassis from within the equipment rack or system cabinet
Installing the controllers
Running diagnostics
Completing the replacement process
Link to the System-Level Diagnostics Guide
AFF A400 systems
Installation and setup
Quick guide
Videos
Detailed guide
Preparing for installation
Installing the hardware
Cabling controllers to your network
Cabling a two-node switchless cluster
Cabling a switched cluster
Cabling controllers to drive shelves
Cabling the controllers to a single drive shelf
Cabling the controllers to two drive shelves
Cabling the controllers to SAS drive shelves
Completing system setup and configuration
Completing system setup and configuration using a Windows or Mac laptop
Completing system setup and configuration if you are not using a Windows or Mac laptop
Power supply replacement
Replacing a power supply
Completing the replacement process
Fan replacement
Hot-swapping a fan module
Completing the replacement process
NVDIMM battery replacement
Replacing the NVDIMM battery
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing the NVDIMM battery
Installing the controller module
Running diagnostics
Restoring the controller module to operation after running diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Controller module replacement
Replacing the controller module
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Replacing the controller module hardware
Removing the controller module
Moving the power supplies
Moving the NVDIMM battery
Moving the boot media
Moving the PCIe risers and mezzanine card
Moving the DIMMs
Installing the controller module
Setting and verifying system time after replacing the controller
Running diagnostics
Completing system restoration
Recabling the system
Reassigning disks
Verifying the system ID change on an HA system
Manually reassigning the system ID on systems in a two-node MetroCluster configuration
Installing licenses for the replacement node in ONTAP
Restoring Storage and Volume Encryption functionality
Verifying LIFs and registering the serial number
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
System DIMM replacement
Replacing a DIMM
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing system DIMMs
Installing the controller module
Running diagnostics
Restoring the controller module to operation after running diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
NVDIMM replacement
Replacing an NVDIMM
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing the NVDIMM
Installing the controller module
Running diagnostics
Restoring the controller module to operation after running diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Boot media replacement
Replacing the boot media
Pre-shutdown checks for onboard encryption keys
Checking NVE or NSE on systems running ONTAP 9.6 and later
Shutting down the impaired controller
Completing node shutdown
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing the boot media
Transferring the boot image to the boot media
Booting the recovery image
Booting the recovery image in most systems
Booting the recovery image in a two-node MetroCluster configuration
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
RTC battery replacement
Replacing the real-time clock battery
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing the RTC battery
Installing the controller module
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
PCIe or mezzanine card replacement
Replacing a PCIe or mezzanine card
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing a PCIe card
Replacing the mezzanine card
Installing the controller module
Switching back aggregates in a two-node MetroCluster configuration
Restoring the controller module to operation after running diagnostics
Completing the replacement process
Chassis replacement
Replacing the chassis
Shutting down the controllers when replacing a chassis
Shutting down the nodes
Shutting down a node in a two-node MetroCluster configuration
Removing the controller modules
Moving the fans
Replacing a chassis from within the equipment rack or system cabinet
Installing the controller modules
Verifying and setting the HA state of the chassis
Running diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Installation and setup
Quick guide
Videos
Detailed guide
Preparing for installation
Installing the hardware
Cabling controllers to your network
Cabling a two-node switchless cluster
Cabling a switched cluster
Cabling controllers to drive shelves
Cabling the controllers to a single drive shelf
Cabling the controllers to two drive shelves
Cabling the controllers to SAS drive shelves
Completing system setup and configuration
Completing system setup and configuration using a Windows or Mac laptop
Completing system setup and configuration if you are not using a Windows or Mac laptop
Power supply replacement
Replacing a power supply
Completing the replacement process
Fan replacement
Hot-swapping a fan module
Completing the replacement process
NVDIMM battery replacement
Replacing the NVDIMM battery
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing the NVDIMM battery
Installing the controller module
Running diagnostics
Restoring the controller module to operation after running diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Controller module replacement
Replacing the controller module
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Replacing the controller module hardware
Removing the controller module
Moving the power supplies
Moving the NVDIMM battery
Moving the boot media
Moving the PCIe risers and mezzanine card
Moving the DIMMs
Installing the controller module
Setting and verifying system time after replacing the controller
Running diagnostics
Completing system restoration
Recabling the system
Reassigning disks
Verifying the system ID change on an HA system
Manually reassigning the system ID on systems in a two-node MetroCluster configuration
Installing licenses for the replacement node in ONTAP
Restoring Storage and Volume Encryption functionality
Verifying LIFs and registering the serial number
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
System DIMM replacement
Replacing a DIMM
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing system DIMMs
Installing the controller module
Running diagnostics
Restoring the controller module to operation after running diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
NVDIMM replacement
Replacing an NVDIMM
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing the NVDIMM
Installing the controller module
Running diagnostics
Restoring the controller module to operation after running diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Boot media replacement
Replacing the boot media
Pre-shutdown checks for onboard encryption keys
Checking NVE or NSE on systems running ONTAP 9.6 and later
Shutting down the impaired controller
Completing node shutdown
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing the boot media
Transferring the boot image to the boot media
Booting the recovery image
Booting the recovery image in most systems
Booting the recovery image in a two-node MetroCluster configuration
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
RTC battery replacement
Replacing the real-time clock battery
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing the RTC battery
Installing the controller module
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
PCIe or mezzanine card replacement
Replacing a PCIe or mezzanine card
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing a PCIe card
Replacing the mezzanine card
Installing the controller module
Switching back aggregates in a two-node MetroCluster configuration
Restoring the controller module to operation after running diagnostics
Completing the replacement process
Chassis replacement
Replacing the chassis
Shutting down the controllers when replacing a chassis
Shutting down the nodes
Shutting down a node in a two-node MetroCluster configuration
Removing the controller modules
Moving the fans
Replacing a chassis from within the equipment rack or system cabinet
Installing the controller modules
Verifying and setting the HA state of the chassis
Running diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
AFF A320 systems
Installation and setup
Quick guide
Videos
Detailed guide
Preparing for installation
Installing the hardware
Cabling controllers to your network
Cabling a two-node switchless cluster
Cabling a switched cluster
Cabling controllers to drive shelves
Cabling the controllers to a single drive shelf
Cabling the controllers to two drive shelves
Completing system setup and configuration
Completing system setup and configuration using a Windows or Mac laptop
Completing system setup and configuration if you are not using a Windows or Mac laptop
Power supply replacement
Replacing a power supply
Completing the replacement process
Fan replacement
Hot-swapping a fan module
Completing the replacement process
NV battery replacement
Replacing the NVDIMM battery
Shutting down the impaired controller
Shutting down the node
Removing the controller module
Replacing the NVDIMM battery
Installing the controller module
Running diagnostics
Restoring the controller module to operation after running diagnostics
Completing the replacement process
Controller module replacement
Replacing the controller module
Shutting down the impaired controller
Shutting down the node
Replacing the controller module hardware
Removing the controller module
Moving the power supplies
Moving the NVDIMM battery
Moving the boot media
Moving the DIMMs
Moving the PCIe risers
Installing the controller module
Setting and verifying system time after replacing the controller
Completing system restoration
Recabling the system
Reassigning disks
Verifying the system ID change on an HA system
Installing licenses for the replacement node in ONTAP
Restoring Storage and Volume Encryption functionality
Verifying LIFs and registering the serial number
Completing the replacement process
System DIMM replacement
Replacing a DIMM
Shutting down the impaired controller
Shutting down the node
Removing the controller module
Replacing system DIMMs
Installing the controller module
Running diagnostics
Restoring the controller module to operation after running diagnostics
Completing the replacement process
NVDIMM replacement
Replacing an NVDIMM
Shutting down the impaired controller
Shutting down the node
Removing the controller module
Replacing the NVDIMM
Installing the controller module
Running diagnostics
Restoring the controller module to operation after running diagnostics
Completing the replacement process
Boot media replacement
Replacing the boot media
Pre-shutdown checks for onboard encryption keys
Checking NVE or NSE on systems running ONTAP 9.6 and later
Shutting down the impaired controller
Completing node shutdown
Removing the controller module
Replacing the boot media
Transferring the boot image to the boot media using a USB flash drive
Booting the recovery image
Completing the replacement process
RTC battery replacement
Replacing the real-time clock battery
Shutting down the impaired controller
Shutting down the node
Removing the controller module
Replacing the RTC battery
Installing the controller module
Completing the replacement process
PCIe card replacement
Replacing a PCIe card
Shutting down the impaired controller
Shutting down the node
Removing the controller module
Replacing a PCIe card
Installing the controller module
Running diagnostics
Restoring the controller module to operation after running diagnostics
Completing the replacement process
Chassis replacement
Replacing the chassis
Shutting down the nodes
Removing the controller modules
Moving the fans
Replacing a chassis from within the equipment rack or system cabinet
Installing the controller modules
Running diagnostics
Completing the replacement process
Installation and setup
Quick guide
Videos
Detailed guide
Preparing for installation
Installing the hardware
Cabling controllers to your network
Cabling a two-node switchless cluster
Cabling a switched cluster
Cabling controllers to drive shelves
Cabling the controllers to a single drive shelf
Cabling the controllers to two drive shelves
Completing system setup and configuration
Completing system setup and configuration using a Windows or Mac laptop
Completing system setup and configuration if you are not using a Windows or Mac laptop
Power supply replacement
Replacing a power supply
Completing the replacement process
Fan replacement
Hot-swapping a fan module
Completing the replacement process
NV battery replacement
Replacing the NVDIMM battery
Shutting down the impaired controller
Shutting down the node
Removing the controller module
Replacing the NVDIMM battery
Installing the controller module
Running diagnostics
Restoring the controller module to operation after running diagnostics
Completing the replacement process
Controller module replacement
Replacing the controller module
Shutting down the impaired controller
Shutting down the node
Replacing the controller module hardware
Removing the controller module
Moving the power supplies
Moving the NVDIMM battery
Moving the boot media
Moving the DIMMs
Moving the PCIe risers
Installing the controller module
Setting and verifying system time after replacing the controller
Completing system restoration
Recabling the system
Reassigning disks
Verifying the system ID change on an HA system
Installing licenses for the replacement node in ONTAP
Restoring Storage and Volume Encryption functionality
Verifying LIFs and registering the serial number
Completing the replacement process
System DIMM replacement
Replacing a DIMM
Shutting down the impaired controller
Shutting down the node
Removing the controller module
Replacing system DIMMs
Installing the controller module
Running diagnostics
Restoring the controller module to operation after running diagnostics
Completing the replacement process
NVDIMM replacement
Replacing an NVDIMM
Shutting down the impaired controller
Shutting down the node
Removing the controller module
Replacing the NVDIMM
Installing the controller module
Running diagnostics
Restoring the controller module to operation after running diagnostics
Completing the replacement process
Boot media replacement
Replacing the boot media
Pre-shutdown checks for onboard encryption keys
Checking NVE or NSE on systems running ONTAP 9.6 and later
Shutting down the impaired controller
Completing node shutdown
Removing the controller module
Replacing the boot media
Transferring the boot image to the boot media using a USB flash drive
Booting the recovery image
Completing the replacement process
RTC battery replacement
Replacing the real-time clock battery
Shutting down the impaired controller
Shutting down the node
Removing the controller module
Replacing the RTC battery
Installing the controller module
Completing the replacement process
PCIe card replacement
Replacing a PCIe card
Shutting down the impaired controller
Shutting down the node
Removing the controller module
Replacing a PCIe card
Installing the controller module
Running diagnostics
Restoring the controller module to operation after running diagnostics
Completing the replacement process
Chassis replacement
Replacing the chassis
Shutting down the nodes
Removing the controller modules
Moving the fans
Replacing a chassis from within the equipment rack or system cabinet
Installing the controller modules
Running diagnostics
Completing the replacement process
AFF A300 systems
Installation and Setup
Cluster configuration worksheet
Installation and setup PDF poster
Setup video
NVMEM battery replacement
Replacing the NVMEM battery
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Opening the controller module
Replacing the NVMEM battery
Reinstalling the controller
Running system-level diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Power supply replacement
Swapping out a power supply
Completing the replacement process
Fan replacement
Swapping out a fan
Completing the replacement process
Controller module replacement
Replacing the controller module
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Replacing the controller module hardware
Opening the controller module
Moving the boot device
Moving the NVMEM battery
Moving the DIMMs
Moving a PCIe card
Installing the controller
Restoring and verifying the system configuration
Verifying and setting the HA state of the controller module
Running system-level diagnostics
Completing system restoration
Recabling the system
Reassigning disks
Verifying the system ID change on an HA system
Manually reassigning the system ID on a stand-alone system in ONTAP
Manually reassigning the system ID on systems in a two-node MetroCluster configuration
Installing licenses for the replacement node in ONTAP
Restoring Storage and Volume Encryption functionality
Verifying LIFs and registering the serial number
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
PCIe card replacement
Replacing a PCIe card
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Opening the controller module
Replacing a PCIe card
Reinstalling the controller
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
DIMM replacement
Replacing a DIMM
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Opening the controller module
Replacing the DIMMs
Reinstalling the controller
Running system-level diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Boot media replacement
Replacing the boot media
Pre-shutdown checks for onboard encryption keys
Checking NVE or NSE on systems running ONTAP 9.5 and earlier
Checking NVE or NSE on systems running ONTAP 9.6 and later
Shutting down the impaired controller
Completing node shutdown
Shutting down a node in a two-node MetroCluster configuration
Opening the controller module
Replacing the boot media
Transferring the boot image to the boot media
Booting the recovery image
Booting the recovery image in most systems
Booting the recovery image in a two-node MetroCluster configuration
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
RTC battery replacement
Replacing the real-time clock battery
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Opening the controller module
Replacing the RTC Battery
Reinstalling the controller
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Chassis replacement
Replacing the chassis
Shutting down the controllers when replacing a chassis
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Swapping out a power supply
Swapping out a fan
Removing the controller module
Replacing a chassis from within the equipment rack or system cabinet
Installing the controller
Verifying and setting the HA state of the chassis
Running system-level diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Installation and Setup
Cluster configuration worksheet
Installation and setup PDF poster
Setup video
NVMEM battery replacement
Replacing the NVMEM battery
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Opening the controller module
Replacing the NVMEM battery
Reinstalling the controller
Running system-level diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Power supply replacement
Swapping out a power supply
Completing the replacement process
Fan replacement
Swapping out a fan
Completing the replacement process
Controller module replacement
Replacing the controller module
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Replacing the controller module hardware
Opening the controller module
Moving the boot device
Moving the NVMEM battery
Moving the DIMMs
Moving a PCIe card
Installing the controller
Restoring and verifying the system configuration
Verifying and setting the HA state of the controller module
Running system-level diagnostics
Completing system restoration
Recabling the system
Reassigning disks
Verifying the system ID change on an HA system
Manually reassigning the system ID on a stand-alone system in ONTAP
Manually reassigning the system ID on systems in a two-node MetroCluster configuration
Installing licenses for the replacement node in ONTAP
Restoring Storage and Volume Encryption functionality
Verifying LIFs and registering the serial number
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
PCIe card replacement
Replacing a PCIe card
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Opening the controller module
Replacing a PCIe card
Reinstalling the controller
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
DIMM replacement
Replacing a DIMM
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Opening the controller module
Replacing the DIMMs
Reinstalling the controller
Running system-level diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Boot media replacement
Replacing the boot media
Pre-shutdown checks for onboard encryption keys
Checking NVE or NSE on systems running ONTAP 9.5 and earlier
Checking NVE or NSE on systems running ONTAP 9.6 and later
Shutting down the impaired controller
Completing node shutdown
Shutting down a node in a two-node MetroCluster configuration
Opening the controller module
Replacing the boot media
Transferring the boot image to the boot media
Booting the recovery image
Booting the recovery image in most systems
Booting the recovery image in a two-node MetroCluster configuration
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
RTC battery replacement
Replacing the real-time clock battery
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Opening the controller module
Replacing the RTC Battery
Reinstalling the controller
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Chassis replacement
Replacing the chassis
Shutting down the controllers when replacing a chassis
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Swapping out a power supply
Swapping out a fan
Removing the controller module
Replacing a chassis from within the equipment rack or system cabinet
Installing the controller
Verifying and setting the HA state of the chassis
Running system-level diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
AFF A250 systems
Installation and setup
Quick guide
Videos
Detailed guide
Preparing for installation
Installing the hardware
Cabling controllers
Cabling controllers to a cluster
Cabling a two node switchless cluster
Cabling a switched cluster
Cabling configuration-dependant options
Cabling to a Fibre Channel host network
Cabling to a 25GbE data or host network
Cabling the controllers to a single drive shelf
Completing system setup and configuration
Completing system setup and configuration if network discovery is enabled
Completing system setup and configuration if network discovery is not enabled
Internal disk drive replacement
Workflow diagram
Video overview
Hot-swapping an embedded drive
Hot-swapping a drive
Hot-swapping a disk drive
How to send comments about documentation and receive update notifications
NVMEM battery replacement
Replacing the NVMEM battery
Shutting down the impaired controller
Shutting down the impaired node
Removing the controller module
Replacing the NV battery
Installing the controller module
Running diagnostics
Completing the replacement process
Power supply replacement
Replacing a power supply
Completing the replacement process
Fan replacement
Shutting down the impaired node
Removing the controller module
Replacing a fan
Reinstalling the controller module
Completing the replacement process
Controller moduler replacement
Replacing the controller module
Shutting down the impaired controller
Shutting down the impaired node
Replacing the controller module hardware
Removing the controller module
Moving the power supply
Moving the fans
Moving the boot media
Moving the DIMMs
Moving a mezzanine card
Moving the NV battery
Installing the controller module
Running diagnostics
Completing system restoration
Recabling the system
Installing licenses for the replacement node in ONTAP
Restoring Storage and Volume Encryption functionality
Verifying LIFs and registering the serial number
Completing the replacement process
DIMM replacement
Replacing a DIMM
Shutting down the impaired controller
Shutting down the impaired node
Removing the controller module
Replacing a DIMM
Installing the controller module
Running diagnostics
Completing the replacement process
Boot media replacement
Replacing the boot media
Pre-shutdown checks for onboard encryption keys
Checking NVE or NSE on systems running ONTAP 9.6 and later
Shutting down the impaired controller
Completing node shutdown
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing the boot media
Transferring the boot image to the boot media
Booting the recovery image
Completing the replacement process
RTC battery replacement
Replacing the real-time clock battery
Shutting down the impaired controller
Shutting down the impaired node
Removing the controller module
Replacing the RTC battery
Reinstalling the controller module
Completing the replacement process
Mezzanine card replacement
Replacing or installing a mezzanine card
Shutting down the impaired controller
Shutting down the impaired node
Removing the controller module
Replacing or installing a mezzanine card
Reinstalling the controller module
Completing the replacement process
Chassis replacement
Replacing the chassis
Shutting down the controllers when replacing a chassis
Shutting down the nodes
Removing the controller modules
Moving drives to the new chassis
Replacing a chassis from within the equipment rack or system cabinet
Installing the controller modules
Running diagnostics
Completing the replacement process
Installation and setup
Quick guide
Videos
Detailed guide
Preparing for installation
Installing the hardware
Cabling controllers
Cabling controllers to a cluster
Cabling a two node switchless cluster
Cabling a switched cluster
Cabling configuration-dependant options
Cabling to a Fibre Channel host network
Cabling to a 25GbE data or host network
Cabling the controllers to a single drive shelf
Completing system setup and configuration
Completing system setup and configuration if network discovery is enabled
Completing system setup and configuration if network discovery is not enabled
Internal disk drive replacement
Workflow diagram
Video overview
Hot-swapping an embedded drive
Hot-swapping a drive
Hot-swapping a disk drive
How to send comments about documentation and receive update notifications
NVMEM battery replacement
Replacing the NVMEM battery
Shutting down the impaired controller
Shutting down the impaired node
Removing the controller module
Replacing the NV battery
Installing the controller module
Running diagnostics
Completing the replacement process
Power supply replacement
Replacing a power supply
Completing the replacement process
Fan replacement
Shutting down the impaired node
Removing the controller module
Replacing a fan
Reinstalling the controller module
Completing the replacement process
Controller moduler replacement
Replacing the controller module
Shutting down the impaired controller
Shutting down the impaired node
Replacing the controller module hardware
Removing the controller module
Moving the power supply
Moving the fans
Moving the boot media
Moving the DIMMs
Moving a mezzanine card
Moving the NV battery
Installing the controller module
Running diagnostics
Completing system restoration
Recabling the system
Installing licenses for the replacement node in ONTAP
Restoring Storage and Volume Encryption functionality
Verifying LIFs and registering the serial number
Completing the replacement process
DIMM replacement
Replacing a DIMM
Shutting down the impaired controller
Shutting down the impaired node
Removing the controller module
Replacing a DIMM
Installing the controller module
Running diagnostics
Completing the replacement process
Boot media replacement
Replacing the boot media
Pre-shutdown checks for onboard encryption keys
Checking NVE or NSE on systems running ONTAP 9.6 and later
Shutting down the impaired controller
Completing node shutdown
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing the boot media
Transferring the boot image to the boot media
Booting the recovery image
Completing the replacement process
RTC battery replacement
Replacing the real-time clock battery
Shutting down the impaired controller
Shutting down the impaired node
Removing the controller module
Replacing the RTC battery
Reinstalling the controller module
Completing the replacement process
Mezzanine card replacement
Replacing or installing a mezzanine card
Shutting down the impaired controller
Shutting down the impaired node
Removing the controller module
Replacing or installing a mezzanine card
Reinstalling the controller module
Completing the replacement process
Chassis replacement
Replacing the chassis
Shutting down the controllers when replacing a chassis
Shutting down the nodes
Removing the controller modules
Moving drives to the new chassis
Replacing a chassis from within the equipment rack or system cabinet
Installing the controller modules
Running diagnostics
Completing the replacement process
AFF A220 and FAS2700 systems
Installation and setup
Quick guide
Videos
Detailed guide
Preparing for installation
Installing the hardware
Cabling controllers to your network
Cabling a two-node switchless cluster, unified network configuration
Cabling a switched cluster, unified network configuration
Cabling a two-node switchless cluster, Ethernet network configuration
Cabling a switched cluster, Ethernet network configuration
Cabling controllers to drive shelves
Cabling storage on an HA pair with external drive shelves
Completing system setup and configuration
Completing system setup if network discovery is enabled
Completing system setup and configuration if you are not using a Windows or Mac laptop
Internal disk drive replacement
Workflow diagram
Video overview
Hot-swapping an embedded drive
Hot-swapping a drive
Hot-swapping a disk drive
How to send comments about documentation and receive update notifications
Caching module replacement
Workflow diagram
Replacing the caching module
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Opening the system
Replacing a caching module
Reinstalling the controller module
Running system-level diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
NVMEM battery replacement
Workflow diagram
Replacing the NVMEM battery
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Opening the system
Replacing the NVMEM battery
Reinstalling the controller module
Running system-level diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Power supply replacement
Workflow diagram
Swapping out a power supply
Completing the replacement process
Controller module replacement
Workflow diagram
Replacing the controller module
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Replacing the controller module hardware
Opening the system
Moving the NVMEM battery
Moving the boot media
Moving the DIMMs
Moving a caching module, if present
Installing the controller
Restoring and verifying the system configuration
Verifying and setting the HA state of the controller module
Running system-level diagnostics
Completing system restoration
Recabling the system
Reassigning disks
Verifying the system ID change on an HA system
Manually reassigning the system ID on a stand-alone system in ONTAP
Manually reassigning the system ID on systems in a two-node MetroCluster configuration
Installing licenses for the replacement node in ONTAP
Restoring Storage and Volume Encryption functionality
Verifying LIFs and registering the serial number
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
DIMM replacement
Workflow diagram
Replacing a DIMM
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Opening the system
Replacing the DIMMs
Reinstalling the controller module
Running system-level diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Boot media replacement
Workflow diagram
Replacing the boot media
Pre-shutdown checks for onboard encryption keys
Checking NVE or NSE on systems running ONTAP 9.5 and earlier
Checking NVE or NSE on systems running ONTAP 9.6 and later
Shutting down the impaired controller
Completing node shutdown
Shutting down a node in a two-node MetroCluster configuration
Opening the system
Replacing the boot media
Transferring the boot image to the boot media
Booting the recovery image
Completing the replacement process
RTC battery replacement
Workflow diagram
Replacing the real-time clock battery
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Opening the system
Replacing the RTC battery
Reinstalling the controller
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Chassis replacement
Workflow diagram
Replacing the chassis
Shutting down the controllers when replacing a chassis
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Swapping out a power supply
Removing the controller module
Moving drives to the new chassis
Replacing a chassis from within the equipment rack or system cabinet
Installing the controller
Verifying and setting the HA state of the chassis
Running system-level diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Installation and setup
Quick guide
Videos
Detailed guide
Preparing for installation
Installing the hardware
Cabling controllers to your network
Cabling a two-node switchless cluster, unified network configuration
Cabling a switched cluster, unified network configuration
Cabling a two-node switchless cluster, Ethernet network configuration
Cabling a switched cluster, Ethernet network configuration
Cabling controllers to drive shelves
Cabling storage on an HA pair with external drive shelves
Completing system setup and configuration
Completing system setup if network discovery is enabled
Completing system setup and configuration if you are not using a Windows or Mac laptop
Internal disk drive replacement
Workflow diagram
Video overview
Hot-swapping an embedded drive
Hot-swapping a drive
Hot-swapping a disk drive
How to send comments about documentation and receive update notifications
Caching module replacement
Workflow diagram
Replacing the caching module
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Opening the system
Replacing a caching module
Reinstalling the controller module
Running system-level diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
NVMEM battery replacement
Workflow diagram
Replacing the NVMEM battery
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Opening the system
Replacing the NVMEM battery
Reinstalling the controller module
Running system-level diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Power supply replacement
Workflow diagram
Swapping out a power supply
Completing the replacement process
Controller module replacement
Workflow diagram
Replacing the controller module
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Replacing the controller module hardware
Opening the system
Moving the NVMEM battery
Moving the boot media
Moving the DIMMs
Moving a caching module, if present
Installing the controller
Restoring and verifying the system configuration
Verifying and setting the HA state of the controller module
Running system-level diagnostics
Completing system restoration
Recabling the system
Reassigning disks
Verifying the system ID change on an HA system
Manually reassigning the system ID on a stand-alone system in ONTAP
Manually reassigning the system ID on systems in a two-node MetroCluster configuration
Installing licenses for the replacement node in ONTAP
Restoring Storage and Volume Encryption functionality
Verifying LIFs and registering the serial number
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
DIMM replacement
Workflow diagram
Replacing a DIMM
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Opening the system
Replacing the DIMMs
Reinstalling the controller module
Running system-level diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Boot media replacement
Workflow diagram
Replacing the boot media
Pre-shutdown checks for onboard encryption keys
Checking NVE or NSE on systems running ONTAP 9.5 and earlier
Checking NVE or NSE on systems running ONTAP 9.6 and later
Shutting down the impaired controller
Completing node shutdown
Shutting down a node in a two-node MetroCluster configuration
Opening the system
Replacing the boot media
Transferring the boot image to the boot media
Booting the recovery image
Completing the replacement process
RTC battery replacement
Workflow diagram
Replacing the real-time clock battery
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Opening the system
Replacing the RTC battery
Reinstalling the controller
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Chassis replacement
Workflow diagram
Replacing the chassis
Shutting down the controllers when replacing a chassis
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Swapping out a power supply
Removing the controller module
Moving drives to the new chassis
Replacing a chassis from within the equipment rack or system cabinet
Installing the controller
Verifying and setting the HA state of the chassis
Running system-level diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
AFF A200 systems
Installation and Setup
Cluster configuration worksheet
Installation and setup PDF poster
Setup video
Internal disk drive replacement
Workflow diagram
Video overview
Hot-swapping an embedded drive
Hot-swapping a drive
Hot-swapping a disk drive
How to send comments about documentation and receive update notifications
NVMEM battery replacement
Replacing the NVMEM battery
Shutting down the impaired controller
Shutting down the node
Opening the system
Replacing the NVMEM battery
Reinstalling the controller module
Running system-level diagnostics
Completing the replacement process
Power supply replacement
Swapping out a power supply
Completing the replacement process
Controller module replacement
Replacing the controller module
Preparing the system for the replacement
Checking quorum on the SCSI blade
Pre-replacement tasks for systems that use Storage Encryption
Shutting down the impaired controller
Shutting down the node
Replacing the controller module hardware
Opening the system
Moving the boot media
Moving the NVMEM battery
Moving the DIMMs
Installing the controller
Restoring and verifying the system configuration
Verifying and setting the HA state of the controller module
Running system-level diagnostics
Completing system restoration
Recabling the system
Reassigning disks
Verifying the system ID change on an HA system
Manually reassigning the system ID on a stand-alone system in ONTAP
Installing licenses for the replacement node in ONTAP
Restoring Storage and Volume Encryption functionality
Verifying LIFs and registering the serial number
Setting and verifying system time after replacing the controller
Completing the replacement process
DIMM replacement
Replacing a DIMM
Shutting down the impaired controller
Shutting down the node
Opening the system
Replacing the DIMMs
Reinstalling the controller module
Running system-level diagnostics
Completing the replacement process
Boot media replacement
Replacing the boot media
Pre-shutdown checks for onboard encryption keys
Checking NVE or NSE on systems running ONTAP 9.5 and earlier
Checking NVE or NSE on systems running ONTAP 9.6 and later
Shutting down the impaired controller
Completing node shutdown
Opening the system
Replacing the boot media
Transferring the boot image to the boot media
Booting the recovery image
Completing the replacement process
RTC battery replacement
Replacing the real-time clock battery
Shutting down the impaired controller
Shutting down the node
Opening the system
Replacing the RTC battery
Reinstalling the controller
Completing the replacement process
Chassis replacement
Replacing the chassis
Shutting down the node
Swapping out a power supply
Removing the controller module
Moving disk drives to the new chassis
Replacing a chassis from within the equipment rack or system cabinet
Installing the controller
Verifying and setting the HA state of the chassis
Running system-level diagnostics
Completing the replacement process
Installation and Setup
Cluster configuration worksheet
Installation and setup PDF poster
Setup video
Internal disk drive replacement
Workflow diagram
Video overview
Hot-swapping an embedded drive
Hot-swapping a drive
Hot-swapping a disk drive
How to send comments about documentation and receive update notifications
NVMEM battery replacement
Replacing the NVMEM battery
Shutting down the impaired controller
Shutting down the node
Opening the system
Replacing the NVMEM battery
Reinstalling the controller module
Running system-level diagnostics
Completing the replacement process
Power supply replacement
Swapping out a power supply
Completing the replacement process
Controller module replacement
Replacing the controller module
Preparing the system for the replacement
Checking quorum on the SCSI blade
Pre-replacement tasks for systems that use Storage Encryption
Shutting down the impaired controller
Shutting down the node
Replacing the controller module hardware
Opening the system
Moving the boot media
Moving the NVMEM battery
Moving the DIMMs
Installing the controller
Restoring and verifying the system configuration
Verifying and setting the HA state of the controller module
Running system-level diagnostics
Completing system restoration
Recabling the system
Reassigning disks
Verifying the system ID change on an HA system
Manually reassigning the system ID on a stand-alone system in ONTAP
Installing licenses for the replacement node in ONTAP
Restoring Storage and Volume Encryption functionality
Verifying LIFs and registering the serial number
Setting and verifying system time after replacing the controller
Completing the replacement process
DIMM replacement
Replacing a DIMM
Shutting down the impaired controller
Shutting down the node
Opening the system
Replacing the DIMMs
Reinstalling the controller module
Running system-level diagnostics
Completing the replacement process
Boot media replacement
Replacing the boot media
Pre-shutdown checks for onboard encryption keys
Checking NVE or NSE on systems running ONTAP 9.5 and earlier
Checking NVE or NSE on systems running ONTAP 9.6 and later
Shutting down the impaired controller
Completing node shutdown
Opening the system
Replacing the boot media
Transferring the boot image to the boot media
Booting the recovery image
Completing the replacement process
RTC battery replacement
Replacing the real-time clock battery
Shutting down the impaired controller
Shutting down the node
Opening the system
Replacing the RTC battery
Reinstalling the controller
Completing the replacement process
Chassis replacement
Replacing the chassis
Shutting down the node
Swapping out a power supply
Removing the controller module
Moving disk drives to the new chassis
Replacing a chassis from within the equipment rack or system cabinet
Installing the controller
Verifying and setting the HA state of the chassis
Running system-level diagnostics
Completing the replacement process
AFF C190 systems
Installation and setup
Quick guide
Videos
Detailed guide
Preparing for installation
Installing the hardware
Cabling controllers to your network
Cabling a two node switchless cluster, unified configuration
Cabling switched cluster, unified configuration
Cabling a two node switchless cluster, Ethernet configuration
Cabling a switched cluster, Ethernet configuration
Completing system setup and configuration
Completing system setup and configuration if network discovery is enabled
Completing system setup and configuration if network discovery is not enabled
Internal disk drive replacement
Workflow diagram
Video overview
Hot-swapping an embedded drive
Hot-swapping a drive
Hot-swapping a disk drive
How to send comments about documentation and receive update notifications
NVMEM battery replacement
Replacing the NVMEM battery
Shutting down the impaired controller
Shutting down the node
Opening the system
Replacing the NVMEM battery
Reinstalling the controller module
Completing the replacement process
Power supply replacement
Swapping out a power supply
Completing the replacement process
Controller module replacement
Replacing the controller module
Shutting down the impaired controller
Shutting down the node
Replacing the controller module hardware
Opening the system
Moving the boot media
Moving the NVMEM battery
Moving the DIMMs
Installing the controller module
Restoring and verifying the system configuration
Verifying and setting the HA state of the controller module
Setting and verifying system time after replacing the controller
Running system-level diagnostics
Completing system restoration
Recabling the system
Reassigning disks
Verifying the system ID change on an HA system
Installing licenses for the replacement node in ONTAP
Restoring Storage and Volume Encryption functionality
Verifying LIFs and registering the serial number
Completing the replacement process
DIMM replacement
Replacing a DIMM
Shutting down the impaired controller
Shutting down the node
Opening the system
Replacing the DIMMs
Reinstalling the controller module
Running system-level diagnostics
Completing the replacement process
Boot media replacement
Replacing the boot media
Pre-shutdown checks for onboard encryption keys
Checking NVE or NSE on systems running ONTAP 9.6 and later
Shutting down the impaired controller
Completing node shutdown
Opening the system
Replacing the boot media
Transferring the boot image to the boot media
Booting the recovery image
Completing the replacement process
RTC battery replacement
Replacing the real-time clock battery
Shutting down the impaired controller
Shutting down the node
Opening the system
Replacing the RTC battery
Reinstalling the controller module
Completing the replacement process
Chassis replacement
Replacing the chassis
Shutting down the node
Swapping out a power supply
Removing the controller module
Moving drives to the new chassis
Replacing a chassis from within the equipment rack or system cabinet
Installing the controller module
Verifying and setting the HA state of the chassis
Running system-level diagnostics
Completing the replacement process
Installation and setup
Quick guide
Videos
Detailed guide
Preparing for installation
Installing the hardware
Cabling controllers to your network
Cabling a two node switchless cluster, unified configuration
Cabling switched cluster, unified configuration
Cabling a two node switchless cluster, Ethernet configuration
Cabling a switched cluster, Ethernet configuration
Completing system setup and configuration
Completing system setup and configuration if network discovery is enabled
Completing system setup and configuration if network discovery is not enabled
Internal disk drive replacement
Workflow diagram
Video overview
Hot-swapping an embedded drive
Hot-swapping a drive
Hot-swapping a disk drive
How to send comments about documentation and receive update notifications
NVMEM battery replacement
Replacing the NVMEM battery
Shutting down the impaired controller
Shutting down the node
Opening the system
Replacing the NVMEM battery
Reinstalling the controller module
Completing the replacement process
Power supply replacement
Swapping out a power supply
Completing the replacement process
Controller module replacement
Replacing the controller module
Shutting down the impaired controller
Shutting down the node
Replacing the controller module hardware
Opening the system
Moving the boot media
Moving the NVMEM battery
Moving the DIMMs
Installing the controller module
Restoring and verifying the system configuration
Verifying and setting the HA state of the controller module
Setting and verifying system time after replacing the controller
Running system-level diagnostics
Completing system restoration
Recabling the system
Reassigning disks
Verifying the system ID change on an HA system
Installing licenses for the replacement node in ONTAP
Restoring Storage and Volume Encryption functionality
Verifying LIFs and registering the serial number
Completing the replacement process
DIMM replacement
Replacing a DIMM
Shutting down the impaired controller
Shutting down the node
Opening the system
Replacing the DIMMs
Reinstalling the controller module
Running system-level diagnostics
Completing the replacement process
Boot media replacement
Replacing the boot media
Pre-shutdown checks for onboard encryption keys
Checking NVE or NSE on systems running ONTAP 9.6 and later
Shutting down the impaired controller
Completing node shutdown
Opening the system
Replacing the boot media
Transferring the boot image to the boot media
Booting the recovery image
Completing the replacement process
RTC battery replacement
Replacing the real-time clock battery
Shutting down the impaired controller
Shutting down the node
Opening the system
Replacing the RTC battery
Reinstalling the controller module
Completing the replacement process
Chassis replacement
Replacing the chassis
Shutting down the node
Swapping out a power supply
Removing the controller module
Moving drives to the new chassis
Replacing a chassis from within the equipment rack or system cabinet
Installing the controller module
Verifying and setting the HA state of the chassis
Running system-level diagnostics
Completing the replacement process
FAS8300 and FAS8700 systems
Installation and setup
Quick guide
Videos
Detailed guide
Preparing for installation
Installing the hardware
Cabling controllers to your network
Cabling a two-node switchless cluster
Cabling a switched cluster
Cabling controllers to drive shelves
Cabling the controllers to SAS drive shelves
Completing system setup and configuration
Completing system setup and configuration using a Windows or Mac laptop
Completing system setup and configuration if you are not using a Windows or Mac laptop
Power supply replacement
Replacing a power supply
Completing the replacement process
Fan replacement
Hot-swapping a fan module
Completing the replacement process
Caching module replacement
Replacing the caching module
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing a caching module
Installing the controller module
Running diagnostics
Restoring the controller module to operation after running diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
NVDIMM battery replacement
Replacing the NVDIMM battery
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing the NVDIMM battery
Installing the controller module
Running diagnostics
Restoring the controller module to operation after running diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Controller module replacement
Replacing the controller module
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Replacing the controller module hardware
Removing the controller module
Moving the power supplies
Moving the NVDIMM battery
Moving the boot media
Moving the PCIe risers and mezzanine card
Moving caching modules
Moving the DIMMs
Installing the controller module
Setting and verifying system time after replacing the controller
Running diagnostics
Completing system restoration
Recabling the system
Reassigning disks
Verifying the system ID change on an HA system
Manually reassigning the system ID on systems in a two-node MetroCluster configuration
Installing licenses for the replacement node in ONTAP
Restoring Storage and Volume Encryption functionality
Verifying LIFs and registering the serial number
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
System DIMM replacement
Replacing a DIMM
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing system DIMMs
Installing the controller module
Running diagnostics
Restoring the controller module to operation after running diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
NVDIMM replacement
Replacing an NVDIMM
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing the NVDIMM
Installing the controller module
Running diagnostics
Restoring the controller module to operation after running diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Boot media replacement
Replacing the boot media
Pre-shutdown checks for onboard encryption keys
Checking NVE or NSE on systems running ONTAP 9.6 and later
Shutting down the impaired controller
Completing node shutdown
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing the boot media
Transferring the boot image to the boot media
Booting the recovery image
Booting the recovery image in most systems
Booting the recovery image in a two-node MetroCluster configuration
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
RTC battery replacement
Replacing the real-time clock battery
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing the RTC battery
Installing the controller module
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
PCIe or mezzanine card replacement
Replacing a PCIe or mezzanine card
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing a PCIe card
Replacing the mezzanine card
Installing the controller module
Switching back aggregates in a two-node MetroCluster configuration
Restoring the controller module to operation after running diagnostics
Completing the replacement process
Chassis replacement
Replacing the chassis
Shutting down the controllers when replacing a chassis
Shutting down the nodes
Shutting down a node in a two-node MetroCluster configuration
Removing the controller modules
Moving the fans
Replacing a chassis from within the equipment rack or system cabinet
Installing the controller modules
Verifying and setting the HA state of the chassis
Running diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Installation and setup
Quick guide
Videos
Detailed guide
Preparing for installation
Installing the hardware
Cabling controllers to your network
Cabling a two-node switchless cluster
Cabling a switched cluster
Cabling controllers to drive shelves
Cabling the controllers to SAS drive shelves
Completing system setup and configuration
Completing system setup and configuration using a Windows or Mac laptop
Completing system setup and configuration if you are not using a Windows or Mac laptop
Power supply replacement
Replacing a power supply
Completing the replacement process
Fan replacement
Hot-swapping a fan module
Completing the replacement process
Caching module replacement
Replacing the caching module
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing a caching module
Installing the controller module
Running diagnostics
Restoring the controller module to operation after running diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
NVDIMM battery replacement
Replacing the NVDIMM battery
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing the NVDIMM battery
Installing the controller module
Running diagnostics
Restoring the controller module to operation after running diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Controller module replacement
Replacing the controller module
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Replacing the controller module hardware
Removing the controller module
Moving the power supplies
Moving the NVDIMM battery
Moving the boot media
Moving the PCIe risers and mezzanine card
Moving caching modules
Moving the DIMMs
Installing the controller module
Setting and verifying system time after replacing the controller
Running diagnostics
Completing system restoration
Recabling the system
Reassigning disks
Verifying the system ID change on an HA system
Manually reassigning the system ID on systems in a two-node MetroCluster configuration
Installing licenses for the replacement node in ONTAP
Restoring Storage and Volume Encryption functionality
Verifying LIFs and registering the serial number
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
System DIMM replacement
Replacing a DIMM
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing system DIMMs
Installing the controller module
Running diagnostics
Restoring the controller module to operation after running diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
NVDIMM replacement
Replacing an NVDIMM
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing the NVDIMM
Installing the controller module
Running diagnostics
Restoring the controller module to operation after running diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Boot media replacement
Replacing the boot media
Pre-shutdown checks for onboard encryption keys
Checking NVE or NSE on systems running ONTAP 9.6 and later
Shutting down the impaired controller
Completing node shutdown
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing the boot media
Transferring the boot image to the boot media
Booting the recovery image
Booting the recovery image in most systems
Booting the recovery image in a two-node MetroCluster configuration
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
RTC battery replacement
Replacing the real-time clock battery
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing the RTC battery
Installing the controller module
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
PCIe or mezzanine card replacement
Replacing a PCIe or mezzanine card
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing a PCIe card
Replacing the mezzanine card
Installing the controller module
Switching back aggregates in a two-node MetroCluster configuration
Restoring the controller module to operation after running diagnostics
Completing the replacement process
Chassis replacement
Replacing the chassis
Shutting down the controllers when replacing a chassis
Shutting down the nodes
Shutting down a node in a two-node MetroCluster configuration
Removing the controller modules
Moving the fans
Replacing a chassis from within the equipment rack or system cabinet
Installing the controller modules
Verifying and setting the HA state of the chassis
Running diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
FAS8200 systems
Installation and Setup
Cluster configuration worksheet
Installation and setup PDF poster
Setup video
Caching module replacement
Replacing the caching module
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Opening the controller module
Replacing or adding a caching module
Reinstalling the controller
Running system-level diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
NVMEM battery replacement
Replacing the NVMEM battery
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Opening the controller module
Replacing the NVMEM battery
Reinstalling the controller
Running system-level diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Power supply replacement
Swapping out a power supply
Completing the replacement process
Fan replacement
Swapping out a fan
Completing the replacement process
Controller module replacement
Replacing the controller module
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Replacing the controller module hardware
Opening the controller module
Moving the boot device
Moving the NVMEM battery
Moving the DIMMs
Moving a PCIe card
Moving a caching module
Installing the controller
Restoring and verifying the system configuration
Verifying and setting the HA state of the controller module
Running system-level diagnostics
Completing system restoration
Recabling the system
Reassigning disks
Verifying the system ID change on an HA system
Manually reassigning the system ID on a stand-alone system in ONTAP
Manually reassigning the system ID on systems in a two-node MetroCluster configuration
Installing licenses for the replacement node in ONTAP
Restoring Storage and Volume Encryption functionality
Verifying LIFs and registering the serial number
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
PCIe card replacement
Replacing a PCIe card
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Opening the controller module
Replacing a PCIe card
Reinstalling the controller
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
DIMM replacement
Replacing a DIMM
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Opening the controller module
Replacing the DIMMs
Reinstalling the controller
Running system-level diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Boot media replacement
Replacing the boot media
Pre-shutdown checks for onboard encryption keys
Checking NVE or NSE on systems running ONTAP 9.5 and earlier
Checking NVE or NSE on systems running ONTAP 9.6 and later
Shutting down the impaired controller
Completing node shutdown
Shutting down a node in a two-node MetroCluster configuration
Opening the controller module
Replacing the boot media
Transferring the boot image to the boot media
Booting the recovery image
Booting the recovery image in most systems
Booting the recovery image in a two-node MetroCluster configuration
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
RTC battery replacement
Replacing the real-time clock battery
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Opening the controller module
Replacing the RTC Battery
Reinstalling the controller
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Chassis replacement
Replacing the chassis
Shutting down the controllers when replacing a chassis
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Swapping out a power supply
Swapping out a fan
Removing the controller module
Replacing a chassis from within the equipment rack or system cabinet
Installing the controller
Verifying and setting the HA state of the chassis
Running system-level diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Installation and Setup
Cluster configuration worksheet
Installation and setup PDF poster
Setup video
Caching module replacement
Replacing the caching module
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Opening the controller module
Replacing or adding a caching module
Reinstalling the controller
Running system-level diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
NVMEM battery replacement
Replacing the NVMEM battery
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Opening the controller module
Replacing the NVMEM battery
Reinstalling the controller
Running system-level diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Power supply replacement
Swapping out a power supply
Completing the replacement process
Fan replacement
Swapping out a fan
Completing the replacement process
Controller module replacement
Replacing the controller module
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Replacing the controller module hardware
Opening the controller module
Moving the boot device
Moving the NVMEM battery
Moving the DIMMs
Moving a PCIe card
Moving a caching module
Installing the controller
Restoring and verifying the system configuration
Verifying and setting the HA state of the controller module
Running system-level diagnostics
Completing system restoration
Recabling the system
Reassigning disks
Verifying the system ID change on an HA system
Manually reassigning the system ID on a stand-alone system in ONTAP
Manually reassigning the system ID on systems in a two-node MetroCluster configuration
Installing licenses for the replacement node in ONTAP
Restoring Storage and Volume Encryption functionality
Verifying LIFs and registering the serial number
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
PCIe card replacement
Replacing a PCIe card
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Opening the controller module
Replacing a PCIe card
Reinstalling the controller
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
DIMM replacement
Replacing a DIMM
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Opening the controller module
Replacing the DIMMs
Reinstalling the controller
Running system-level diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Boot media replacement
Replacing the boot media
Pre-shutdown checks for onboard encryption keys
Checking NVE or NSE on systems running ONTAP 9.5 and earlier
Checking NVE or NSE on systems running ONTAP 9.6 and later
Shutting down the impaired controller
Completing node shutdown
Shutting down a node in a two-node MetroCluster configuration
Opening the controller module
Replacing the boot media
Transferring the boot image to the boot media
Booting the recovery image
Booting the recovery image in most systems
Booting the recovery image in a two-node MetroCluster configuration
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
RTC battery replacement
Replacing the real-time clock battery
Shutting down the impaired controller
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Opening the controller module
Replacing the RTC Battery
Reinstalling the controller
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
Chassis replacement
Replacing the chassis
Shutting down the controllers when replacing a chassis
Shutting down the node
Shutting down a node in a two-node MetroCluster configuration
Swapping out a power supply
Swapping out a fan
Removing the controller module
Replacing a chassis from within the equipment rack or system cabinet
Installing the controller
Verifying and setting the HA state of the chassis
Running system-level diagnostics
Switching back aggregates in a two-node MetroCluster configuration
Completing the replacement process
FAS500f systems
Installation and setup
Quick guide
Videos
Detailed guide
Preparing for installation
Installing the hardware
Cabling controllers
Cabling controllers to a cluster
Cabling a two node switchless cluster
Cabling a switched cluster
Cabling configuration-dependant options
Cabling to a Fibre Channel host network
Cabling to a 25GbE data or host network
Cabling the controllers to a single drive shelf
Completing system setup and configuration
Completing system setup and configuration if network discovery is enabled
Completing system setup and configuration if network discovery is not enabled
Internal disk drive replacement
Workflow diagram
Video overview
Hot-swapping an embedded drive
Hot-swapping a drive
Hot-swapping a disk drive
How to send comments about documentation and receive update notifications
NVMEM battery replacement
Replacing the NVMEM battery
Shutting down the impaired controller
Shutting down the impaired node
Removing the controller module
Replacing the NV battery
Installing the controller module
Running diagnostics
Completing the replacement process
Power supply replacement
Replacing a power supply
Completing the replacement process
Fan replacement
Shutting down the impaired node
Removing the controller module
Replacing a fan
Reinstalling the controller module
Completing the replacement process
Controller moduler replacement
Replacing the controller module
Shutting down the impaired controller
Shutting down the impaired node
Replacing the controller module hardware
Removing the controller module
Moving the power supply
Moving the fans
Moving the boot media
Moving the DIMMs
Moving a mezzanine card
Moving the NV battery
Installing the controller module
Running diagnostics
Completing system restoration
Recabling the system
Installing licenses for the replacement node in ONTAP
Restoring Storage and Volume Encryption functionality
Verifying LIFs and registering the serial number
Completing the replacement process
DIMM replacement
Replacing a DIMM
Shutting down the impaired controller
Shutting down the impaired node
Removing the controller module
Replacing a DIMM
Installing the controller module
Running diagnostics
Completing the replacement process
Boot media replacement
Replacing the boot media
Pre-shutdown checks for onboard encryption keys
Checking NVE or NSE on systems running ONTAP 9.6 and later
Shutting down the impaired controller
Completing node shutdown
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing the boot media
Transferring the boot image to the boot media
Booting the recovery image
Completing the replacement process
RTC battery replacement
Replacing the real-time clock battery
Shutting down the impaired controller
Shutting down the impaired node
Removing the controller module
Replacing the RTC battery
Reinstalling the controller module
Completing the replacement process
Mezzanine card replacement
Replacing or installing a mezzanine card
Shutting down the impaired controller
Shutting down the impaired node
Removing the controller module
Replacing or installing a mezzanine card
Reinstalling the controller module
Completing the replacement process
Chassis replacement
Replacing the chassis
Shutting down the controllers when replacing a chassis
Shutting down the nodes
Removing the controller modules
Moving drives to the new chassis
Replacing a chassis from within the equipment rack or system cabinet
Installing the controller modules
Running diagnostics
Completing the replacement process
Installation and setup
Quick guide
Videos
Detailed guide
Preparing for installation
Installing the hardware
Cabling controllers
Cabling controllers to a cluster
Cabling a two node switchless cluster
Cabling a switched cluster
Cabling configuration-dependant options
Cabling to a Fibre Channel host network
Cabling to a 25GbE data or host network
Cabling the controllers to a single drive shelf
Completing system setup and configuration
Completing system setup and configuration if network discovery is enabled
Completing system setup and configuration if network discovery is not enabled
Internal disk drive replacement
Workflow diagram
Video overview
Hot-swapping an embedded drive
Hot-swapping a drive
Hot-swapping a disk drive
How to send comments about documentation and receive update notifications
NVMEM battery replacement
Replacing the NVMEM battery
Shutting down the impaired controller
Shutting down the impaired node
Removing the controller module
Replacing the NV battery
Installing the controller module
Running diagnostics
Completing the replacement process
Power supply replacement
Replacing a power supply
Completing the replacement process
Fan replacement
Shutting down the impaired node
Removing the controller module
Replacing a fan
Reinstalling the controller module
Completing the replacement process
Controller moduler replacement
Replacing the controller module
Shutting down the impaired controller
Shutting down the impaired node
Replacing the controller module hardware
Removing the controller module
Moving the power supply
Moving the fans
Moving the boot media
Moving the DIMMs
Moving a mezzanine card
Moving the NV battery
Installing the controller module
Running diagnostics
Completing system restoration
Recabling the system
Installing licenses for the replacement node in ONTAP
Restoring Storage and Volume Encryption functionality
Verifying LIFs and registering the serial number
Completing the replacement process
DIMM replacement
Replacing a DIMM
Shutting down the impaired controller
Shutting down the impaired node
Removing the controller module
Replacing a DIMM
Installing the controller module
Running diagnostics
Completing the replacement process
Boot media replacement
Replacing the boot media
Pre-shutdown checks for onboard encryption keys
Checking NVE or NSE on systems running ONTAP 9.6 and later
Shutting down the impaired controller
Completing node shutdown
Shutting down a node in a two-node MetroCluster configuration
Removing the controller module
Replacing the boot media
Transferring the boot image to the boot media
Booting the recovery image
Completing the replacement process
RTC battery replacement
Replacing the real-time clock battery
Shutting down the impaired controller
Shutting down the impaired node
Removing the controller module
Replacing the RTC battery
Reinstalling the controller module
Completing the replacement process
Mezzanine card replacement
Replacing or installing a mezzanine card
Shutting down the impaired controller
Shutting down the impaired node
Removing the controller module
Replacing or installing a mezzanine card
Reinstalling the controller module
Completing the replacement process
Chassis replacement
Replacing the chassis
Shutting down the controllers when replacing a chassis
Shutting down the nodes
Removing the controller modules
Moving drives to the new chassis
Replacing a chassis from within the equipment rack or system cabinet
Installing the controller modules
Running diagnostics
Completing the replacement process
FAS2600 systems
Installation and Setup
Cluster configuration worksheet
Installation and setup PDF poster
Setup video
Internal disk drive replacement
Workflow diagram
Video overview
Hot-swapping an embedded drive
Hot-swapping a drive
Hot-swapping a disk drive
How to send comments about documentation and receive update notifications
Caching module replacement
Workflow diagram
Video overview
Replacing the caching module
Shutting down the impaired controller
Shutting down the node
Opening the system
Replacing a caching module
Reinstalling the controller module
Running system-level diagnostics
Completing the replacement process
NVMEM battery replacement
Workflow diagram
Video overview
Replacing the NVMEM battery
Shutting down the impaired controller
Shutting down the node
Opening the system
Replacing the NVMEM battery
Reinstalling the controller module
Running system-level diagnostics
Completing the replacement process
Power supply replacement
Workflow diagram
Video overview
Swapping out a power supply
Completing the replacement process
Controller module replacement
Workflow diagram
Video overview
Replacing the controller module
Shutting down the impaired controller
Shutting down the node
Replacing the controller module hardware
Opening the system
Moving the boot media
Moving the NVMEM battery
Moving the DIMMs
Moving a caching module
Installing the controller
Moving the boot media
Restoring and verifying the system configuration
Verifying and setting the HA state of the controller module
Running system-level diagnostics
Completing system restoration
Recabling the system
Reassigning disks
Verifying the system ID change on an HA system
Manually reassigning the system ID on a stand-alone system in ONTAP
Installing licenses for the replacement node in ONTAP
Restoring Storage and Volume Encryption functionality
Verifying LIFs and registering the serial number
Setting and verifying system time after replacing the controller
Completing the replacement process
DIMM replacement
Workflow diagram
Video overview
Replacing a DIMM
Shutting down the impaired controller
Shutting down the node
Opening the system
Replacing the DIMMs
Reinstalling the controller module
Running system-level diagnostics
Completing the replacement process
Boot media replacement
Workflow diagram
Video overview
Replacing the boot media
Pre-shutdown checks for onboard encryption keys
Checking NVE or NSE on systems running ONTAP 9.5 and earlier
Checking NVE or NSE on systems running ONTAP 9.6 and later
Shutting down the impaired controller
Completing node shutdown
Opening the system
Replacing the boot media
Transferring the boot image to the boot media
Booting the recovery image
Completing the replacement process
RTC battery replacement
Workflow diagram
Video overview
Replacing the real-time clock battery
Shutting down the impaired controller
Shutting down the node
Opening the system
Replacing the RTC battery
Reinstalling the controller
Completing the replacement process
Chassis replacement
Workflow diagram
Video overview
Replacing the chassis
Shutting down the node
Swapping out a power supply
Removing the controller module
Moving disk drives to the new chassis
Replacing a chassis from within the equipment rack or system cabinet
Installing the controller
Verifying and setting the HA state of the chassis
Running system-level diagnostics
Completing the replacement process
Installation and Setup
Cluster configuration worksheet
Installation and setup PDF poster
Setup video
Internal disk drive replacement
Workflow diagram
Video overview
Hot-swapping an embedded drive
Hot-swapping a drive
Hot-swapping a disk drive
How to send comments about documentation and receive update notifications
Caching module replacement
Workflow diagram
Video overview
Replacing the caching module
Shutting down the impaired controller
Shutting down the node
Opening the system
Replacing a caching module
Reinstalling the controller module
Running system-level diagnostics
Completing the replacement process
NVMEM battery replacement
Workflow diagram
Video overview
Replacing the NVMEM battery
Shutting down the impaired controller
Shutting down the node
Opening the system
Replacing the NVMEM battery
Reinstalling the controller module
Running system-level diagnostics
Completing the replacement process
Power supply replacement
Workflow diagram
Video overview
Swapping out a power supply
Completing the replacement process
Controller module replacement
Workflow diagram
Video overview
Replacing the controller module
Shutting down the impaired controller
Shutting down the node
Replacing the controller module hardware
Opening the system
Moving the boot media
Moving the NVMEM battery
Moving the DIMMs
Moving a caching module
Installing the controller
Moving the boot media
Restoring and verifying the system configuration
Verifying and setting the HA state of the controller module
Running system-level diagnostics
Completing system restoration
Recabling the system
Reassigning disks
Verifying the system ID change on an HA system
Manually reassigning the system ID on a stand-alone system in ONTAP
Installing licenses for the replacement node in ONTAP
Restoring Storage and Volume Encryption functionality
Verifying LIFs and registering the serial number
Setting and verifying system time after replacing the controller
Completing the replacement process
DIMM replacement
Workflow diagram
Video overview
Replacing a DIMM
Shutting down the impaired controller
Shutting down the node
Opening the system
Replacing the DIMMs
Reinstalling the controller module
Running system-level diagnostics
Completing the replacement process
Boot media replacement
Workflow diagram
Video overview
Replacing the boot media
Pre-shutdown checks for onboard encryption keys
Checking NVE or NSE on systems running ONTAP 9.5 and earlier
Checking NVE or NSE on systems running ONTAP 9.6 and later
Shutting down the impaired controller
Completing node shutdown
Opening the system
Replacing the boot media
Transferring the boot image to the boot media
Booting the recovery image
Completing the replacement process
RTC battery replacement
Workflow diagram
Video overview
Replacing the real-time clock battery
Shutting down the impaired controller
Shutting down the node
Opening the system
Replacing the RTC battery
Reinstalling the controller
Completing the replacement process
Chassis replacement
Workflow diagram
Video overview
Replacing the chassis
Shutting down the node
Swapping out a power supply
Removing the controller module
Moving disk drives to the new chassis
Replacing a chassis from within the equipment rack or system cabinet
Installing the controller
Verifying and setting the HA state of the chassis
Running system-level diagnostics
Completing the replacement process
Other platform procedures
Installing SuperRail into a four-post rack
SuperRail kit installation instructions
System-level diagnostics
Introduction to system‑level diagnostics
Requirements for running system-level diagnostics
How to use online command-line help
Running system installation diagnostics
Running system panic diagnostics
Running slow system response diagnostics
Running hardware installation diagnostics
Running device failure diagnostics
Upgrading controller hardware
Deciding whether to use this guide
Considerations for upgrading controller hardware
Choosing methods for upgrading controller hardware
Upgrading controller hardware by moving storage
Preparing for the upgrade when moving storage
Shutting down the original nodes
Removing ownership of disks attached to the new nodes
Resetting default configuration on the new nodes
Installing the new nodes
Setting up the new nodes
Optional: Moving internal storage or converting the system to a drive shelf
Moving internal drives from an original node
Converting an original node to a drive shelf
Attaching storage shelves and reassigning disk ownership
Restoring the root volume configuration
Completing the upgrade
Completing the upgrade in ONTAP 9.8
Mapping network ports using ONTAP 9.8
Performing final upgrade steps in ONTAP 9.8
Completing the upgrade in ONTAP 9.7 or earlier
Mapping network ports using ONTAP 9.7 or earlier
Performing final upgrade steps in ONTAP 9.7 or earlier
Upgrading controller hardware by moving volumes
Preparing for the upgrade when moving volumes
Installing the new nodes and joining them to the cluster
Creating an aggregate and moving volumes to the new nodes
Moving non-SAN data LIFs and cluster management LIFs to the new nodes
Deleting SAN LIFs from the original nodes
Unjoining the original nodes from the cluster
Completing the upgrade
Adding a second controller to create an HA pair
Adding a second controller module to create an ONTAP HA pair
Preparing for the upgrade
Preparing to add a controller module when using Storage Encryption
Preparing cluster ports on an existing controller module
Preparing the netboot server to download the image
Setting the mode on the existing controller module
Shutting down the existing controller module
Installing and cabling the new controller module
Configuring and cabling CNA ports (80xx, FAS2600 series, FAS2552, and FAS2554 systems only)
Verifying and setting the HA state of the controller module and chassis
Assigning disks to the new controller using root-data partitioning
Netbooting and setting up Data ONTAP on the new controller module
Installing licenses for the new controller module
Enabling storage failover on both controller modules and enabling cluster HA
Installing the firmware after adding a controller module
Adding the new node as a LUN mapping's reporting node
Setting up Storage or Volume Encryption on the new controller module
Verifying the configuration with the Config Advisor
Installing SuperRail into a four-post rack
SuperRail kit installation instructions
System-level diagnostics
Introduction to system‑level diagnostics
Requirements for running system-level diagnostics
How to use online command-line help
Running system installation diagnostics
Running system panic diagnostics
Running slow system response diagnostics
Running hardware installation diagnostics
Running device failure diagnostics
Upgrading controller hardware
Deciding whether to use this guide
Considerations for upgrading controller hardware
Choosing methods for upgrading controller hardware
Upgrading controller hardware by moving storage
Preparing for the upgrade when moving storage
Shutting down the original nodes
Removing ownership of disks attached to the new nodes
Resetting default configuration on the new nodes
Installing the new nodes
Setting up the new nodes
Optional: Moving internal storage or converting the system to a drive shelf
Moving internal drives from an original node
Converting an original node to a drive shelf
Attaching storage shelves and reassigning disk ownership
Restoring the root volume configuration
Completing the upgrade
Completing the upgrade in ONTAP 9.8
Mapping network ports using ONTAP 9.8
Performing final upgrade steps in ONTAP 9.8
Completing the upgrade in ONTAP 9.7 or earlier
Mapping network ports using ONTAP 9.7 or earlier
Performing final upgrade steps in ONTAP 9.7 or earlier
Upgrading controller hardware by moving volumes
Preparing for the upgrade when moving volumes
Installing the new nodes and joining them to the cluster
Creating an aggregate and moving volumes to the new nodes
Moving non-SAN data LIFs and cluster management LIFs to the new nodes
Deleting SAN LIFs from the original nodes
Unjoining the original nodes from the cluster
Completing the upgrade
Adding a second controller to create an HA pair
Adding a second controller module to create an ONTAP HA pair
Preparing for the upgrade
Preparing to add a controller module when using Storage Encryption
Preparing cluster ports on an existing controller module
Preparing the netboot server to download the image
Setting the mode on the existing controller module
Shutting down the existing controller module
Installing and cabling the new controller module
Configuring and cabling CNA ports (80xx, FAS2600 series, FAS2552, and FAS2554 systems only)
Verifying and setting the HA state of the controller module and chassis
Assigning disks to the new controller using root-data partitioning
Netbooting and setting up Data ONTAP on the new controller module
Installing licenses for the new controller module
Enabling storage failover on both controller modules and enabling cluster HA
Installing the firmware after adding a controller module
Adding the new node as a LUN mapping's reporting node
Setting up Storage or Volume Encryption on the new controller module
Verifying the configuration with the Config Advisor
NS224 drive shelves
Hot-adds
About this procedure
Requirements for a hot-add
Considerations for a hot-add
Preparing for a hot-add
Preparing non-dedicated RoCE capable ports for a hot-add
Preparing an AFF A700, ASA A700, ASA A800, AFF A800, AFF A400, or ASA A400 HA pair to hot-add a second shelf
Preparing to manually assign drive ownership for a hot-add
Installing a drive shelf for a hot-add
Cabling a drive shelf for a hot-add
Considerations when cabling for a hot-add
Cabling a hot-add shelf for an FAS500f, AFF A250, or ASA A250 HA pair
Cabling a hot-add shelf for an AFF A700 or ASA A700 HA pair
Cabling a hot-add shelf for an AFF A800 or ASA A800 HA pair
Cabling a hot-add shelf for an AFF A400 or ASA A400 HA pair
Cabling a hot-add shelf for an AFF A320 HA pair
Completing the hot-add
Document update record
Shelf IDs
Changing an NS224 drive shelf ID
Servicing
Hot-swapping a drive
Hot-swapping a power supply
Replacing a fan
Replacing a DIMM
Replacing the real-time clock battery
Replacing the boot media
Replacing an NSM module
Hot-removing a drive shelf
Document update record
Cabling NS224 drive shelves as switch-attached storage
Where to find information
Hot-adds
About this procedure
Requirements for a hot-add
Considerations for a hot-add
Preparing for a hot-add
Preparing non-dedicated RoCE capable ports for a hot-add
Preparing an AFF A700, ASA A700, ASA A800, AFF A800, AFF A400, or ASA A400 HA pair to hot-add a second shelf
Preparing to manually assign drive ownership for a hot-add
Installing a drive shelf for a hot-add
Cabling a drive shelf for a hot-add
Considerations when cabling for a hot-add
Cabling a hot-add shelf for an FAS500f, AFF A250, or ASA A250 HA pair
Cabling a hot-add shelf for an AFF A700 or ASA A700 HA pair
Cabling a hot-add shelf for an AFF A800 or ASA A800 HA pair
Cabling a hot-add shelf for an AFF A400 or ASA A400 HA pair
Cabling a hot-add shelf for an AFF A320 HA pair
Completing the hot-add
Document update record
Shelf IDs
Changing an NS224 drive shelf ID
Servicing
Hot-swapping a drive
Hot-swapping a power supply
Replacing a fan
Replacing a DIMM
Replacing the real-time clock battery
Replacing the boot media
Replacing an NSM module
Hot-removing a drive shelf
Document update record
Cabling NS224 drive shelves as switch-attached storage
Where to find information
SAS shelves with IOM12 modules
Installing and cabling
Installing and cabling disk shelves with IOM12 modules for a new system installation
Requirements for installing and cabling disk shelves with IOM12 modules for a new system installation
Considerations for installing and cabling disk shelves with IOM12 modules for a new system installation
Installing disk shelves with IOM12 modules for a new system installation
Cabling disk shelves with IOM12 modules for a new system installation
Hot-adding disk shelves with IOM12 modules
Requirements for hot-adding disk shelves with IOM12 modules
Considerations for hot-adding disk shelves with IOM12 modules
Installing disk shelves with IOM12 modules for a hot-add
Cabling disk shelves with IOM12 modules for a hot-add
Changing the disk shelf ID
Controller-to-stack cabling worksheets and cabling examples for common multipath HA configurations
Controller-to-stack cabling worksheets and cabling examples for multipath HA configurations with quad-port SAS HBAs
Controller-to-stack cabling worksheets and cabling examples for multipath HA configurations with four onboard SAS ports
Controller-to-stack cabling worksheets and cabling examples for common FAS2600 series and FAS2700 configurations
Controller-to-stack cabling worksheet and cabling example for a quad-path HA configuration with two quad-port SAS HBAs
SAS cabling rules
Configuration rules
Controller slot numbering rules
Shelf-to-shelf connection rules
Controller-to-stack connection rules
Mini-SAS HD SAS optical cable rules
Controller-to-stack cabling worksheet template for multipathed connectivity
How to read a worksheet to cable controller-to-stack connections for multipathed connectivity
Controller-to-stack cabling worksheet template for quad-pathed connectivity
How to read a worksheet to cable controller-to-stack connections for quad-pathed connectivity
Recommended AC power line sizes
Document update record
Servicing
Hot-swapping a disk drive in a DS224C or DS212C disk shelf
Hot-swapping a disk drive in a DS460C disk shelf
Hot-swapping a power supply
Replacing a fan module in a DS460C disk shelf
Replacing a drive drawer in a DS460C disk shelf
Removing the cable chains
Removing a drive drawer
Installing a drive drawer
Attaching the cable chains
Hot-swapping or replacing an IOM12 module
Hot-removing disk shelves with IOM12 modules
Monitoring disk shelf LEDs
Operator display panel LEDs
IOM12 module LEDs
Power supply LEDs
Fan LEDs on DS460C disk shelves
Disk drive LEDs
Document update record
Hot-adding IOM12 shelves to a stack of IOM6 shelves
About this procedure
Requirements for a hot-add
Requirements for a hot-add in bridge-attached MetroCluster configurations
Considerations for a hot-add
Preparing to manually assign drive ownership for a hot-add
Installing shelves for a hot-add
Cabling shelves for a hot-add
Completing the hot-add
Document update record
Installing and cabling
Installing and cabling disk shelves with IOM12 modules for a new system installation
Requirements for installing and cabling disk shelves with IOM12 modules for a new system installation
Considerations for installing and cabling disk shelves with IOM12 modules for a new system installation
Installing disk shelves with IOM12 modules for a new system installation
Cabling disk shelves with IOM12 modules for a new system installation
Hot-adding disk shelves with IOM12 modules
Requirements for hot-adding disk shelves with IOM12 modules
Considerations for hot-adding disk shelves with IOM12 modules
Installing disk shelves with IOM12 modules for a hot-add
Cabling disk shelves with IOM12 modules for a hot-add
Changing the disk shelf ID
Controller-to-stack cabling worksheets and cabling examples for common multipath HA configurations
Controller-to-stack cabling worksheets and cabling examples for multipath HA configurations with quad-port SAS HBAs
Controller-to-stack cabling worksheets and cabling examples for multipath HA configurations with four onboard SAS ports
Controller-to-stack cabling worksheets and cabling examples for common FAS2600 series and FAS2700 configurations
Controller-to-stack cabling worksheet and cabling example for a quad-path HA configuration with two quad-port SAS HBAs
SAS cabling rules
Configuration rules
Controller slot numbering rules
Shelf-to-shelf connection rules
Controller-to-stack connection rules
Mini-SAS HD SAS optical cable rules
Controller-to-stack cabling worksheet template for multipathed connectivity
How to read a worksheet to cable controller-to-stack connections for multipathed connectivity
Controller-to-stack cabling worksheet template for quad-pathed connectivity
How to read a worksheet to cable controller-to-stack connections for quad-pathed connectivity
Recommended AC power line sizes
Document update record
Servicing
Hot-swapping a disk drive in a DS224C or DS212C disk shelf
Hot-swapping a disk drive in a DS460C disk shelf
Hot-swapping a power supply
Replacing a fan module in a DS460C disk shelf
Replacing a drive drawer in a DS460C disk shelf
Removing the cable chains
Removing a drive drawer
Installing a drive drawer
Attaching the cable chains
Hot-swapping or replacing an IOM12 module
Hot-removing disk shelves with IOM12 modules
Monitoring disk shelf LEDs
Operator display panel LEDs
IOM12 module LEDs
Power supply LEDs
Fan LEDs on DS460C disk shelves
Disk drive LEDs
Document update record
Hot-adding IOM12 shelves to a stack of IOM6 shelves
About this procedure
Requirements for a hot-add
Requirements for a hot-add in bridge-attached MetroCluster configurations
Considerations for a hot-add
Preparing to manually assign drive ownership for a hot-add
Installing shelves for a hot-add
Cabling shelves for a hot-add
Completing the hot-add
Document update record
System cabinets
42U 1280 mm System Cabinet Guide
Preparing to install the system cabinet
System cabinet features
Required tools and equipment
Space requirements and system cabinet dimensions
Supported PDU types and specifications
Unpacking the system cabinet
Installing a system cabinet
Installing the cabinet interconnect kit
Installing the bolt-down kit
Installing additional support rails
Installing equipment in the system cabinet
Powering on the system cabinet
Replacing PDUs
Reversing the system cabinet front door
Removing the illuminated badge
Removing the system cabinet door
Moving the badge power supply and cabling
Reversing the door hinge and lock catch
Reinstalling the door and illuminated badge
42U 1280 mm System Cabinet Guide
Preparing to install the system cabinet
System cabinet features
Required tools and equipment
Space requirements and system cabinet dimensions
Supported PDU types and specifications
Unpacking the system cabinet
Installing a system cabinet
Installing the cabinet interconnect kit
Installing the bolt-down kit
Installing additional support rails
Installing equipment in the system cabinet
Powering on the system cabinet
Replacing PDUs
Reversing the system cabinet front door
Removing the illuminated badge
Removing the system cabinet door
Moving the badge power supply and cabling
Reversing the door hinge and lock catch
Reinstalling the door and illuminated badge
Broadcom-supported BES-53248 switches
Setting up and configuring
Overview of the Broadcom-supported BES-53248 cluster switch
Setting up the Broadcom-supported BES-53248 cluster switch
Broadcom-supported BES-53248 cluster switch configuration requirements
Broadcom-supported BES-53248 cluster switch port assignments
Required documentation for Broadcom-supported BES-53248 cluster switches
Configuring a new Broadcom-supported BES-53248 cluster switch
Initial installation of the Broadcom-supported BES-53248 cluster switch
Enabling SSH on Broadcom-supported BES-54328 cluster switches
Installing the EFOS software
Installing licenses for Broadcom-supported BES-53248 cluster switches
Restrictions and limitations
Editing the Reference Configuration File (RCF)
Installing the Reference Configuration File (RCF)
Configuring the cluster switch log collection feature
Installing the Cluster Switch Health Monitor (CSHM) configuration file
Upgrading a Broadcom-supported BES-53248 cluster switch in an NDO/NDU environment
Preparing the controller for a cluster switch upgrade
Installing the EFOS software
Installing licenses for Broadcom-supported BES-53248 cluster switches
Restrictions and limitations
Editing the Reference Configuration File (RCF)
Installing the Reference Configuration File (RCF)
Configuring the cluster switch log collection feature
Installing the Cluster Switch Health Monitor (CSHM) configuration file
Verifying the configuration after a cluster switch upgrade
Replacing switches
Configuring a new Broadcom-supported BES-53248 cluster switch
Initial installation of the Broadcom-supported BES-53248 cluster switch
Enabling SSH on Broadcom-supported BES-54328 cluster switches
Installing the EFOS software
Installing licenses for Broadcom-supported BES-53248 cluster switches
Restrictions and limitations
Editing the Reference Configuration File (RCF)
Installing the Reference Configuration File (RCF)
Configuring the cluster switch log collection feature
Installing the Cluster Switch Health Monitor (CSHM) configuration file
Replacing a Broadcom-supported BES-53248 cluster switch
Migrating to a two-node switched cluster
Migrating to a two-node switched cluster with Broadcom-supported BES-53248 cluster switches
Migrating to a switched NetApp cluster environment using Broadcom-supported BES-53248 cluster switches
Replacing CN1610 cluster switches
Migrating CN1610 cluster switches to Broadcom-supported BES-53248 cluster switches
How to migrate CN1610 cluster switches to BES-53248 cluster switches
Setting up and configuring
Overview of the Broadcom-supported BES-53248 cluster switch
Setting up the Broadcom-supported BES-53248 cluster switch
Broadcom-supported BES-53248 cluster switch configuration requirements
Broadcom-supported BES-53248 cluster switch port assignments
Required documentation for Broadcom-supported BES-53248 cluster switches
Configuring a new Broadcom-supported BES-53248 cluster switch
Initial installation of the Broadcom-supported BES-53248 cluster switch
Enabling SSH on Broadcom-supported BES-54328 cluster switches
Installing the EFOS software
Installing licenses for Broadcom-supported BES-53248 cluster switches
Restrictions and limitations
Editing the Reference Configuration File (RCF)
Installing the Reference Configuration File (RCF)
Configuring the cluster switch log collection feature
Installing the Cluster Switch Health Monitor (CSHM) configuration file
Upgrading a Broadcom-supported BES-53248 cluster switch in an NDO/NDU environment
Preparing the controller for a cluster switch upgrade
Installing the EFOS software
Installing licenses for Broadcom-supported BES-53248 cluster switches
Restrictions and limitations
Editing the Reference Configuration File (RCF)
Installing the Reference Configuration File (RCF)
Configuring the cluster switch log collection feature
Installing the Cluster Switch Health Monitor (CSHM) configuration file
Verifying the configuration after a cluster switch upgrade
Replacing switches
Configuring a new Broadcom-supported BES-53248 cluster switch
Initial installation of the Broadcom-supported BES-53248 cluster switch
Enabling SSH on Broadcom-supported BES-54328 cluster switches
Installing the EFOS software
Installing licenses for Broadcom-supported BES-53248 cluster switches
Restrictions and limitations
Editing the Reference Configuration File (RCF)
Installing the Reference Configuration File (RCF)
Configuring the cluster switch log collection feature
Installing the Cluster Switch Health Monitor (CSHM) configuration file
Replacing a Broadcom-supported BES-53248 cluster switch
Migrating to a two-node switched cluster
Migrating to a two-node switched cluster with Broadcom-supported BES-53248 cluster switches
Migrating to a switched NetApp cluster environment using Broadcom-supported BES-53248 cluster switches
Replacing CN1610 cluster switches
Migrating CN1610 cluster switches to Broadcom-supported BES-53248 cluster switches
How to migrate CN1610 cluster switches to BES-53248 cluster switches
Cisco Nexus 9336C-FX2 cluster switches
Setting up
Switches supported by ONTAP
Setting up the switches
Required cluster configuration information
Installing the Cluster Switch Health Monitor (CSHM) configuration file for 92300YC switches
Required documentation
Considerations for using Smart Call Home
Sample and blank cabling worksheets
Cisco Nexus 9336C-FX2 cabling worksheet
Cisco Nexus 92300YC cabling worksheet
Cisco Nexus 3232C cabling worksheet
Cisco Nexus 3132Q-V cabling worksheet
Cisco Nexus 5596UP and 5596T cabling worksheet
Installing NX-OS software and Reference Configuration Files
Installing NX-OS software and RCFs on Cisco Nexus 9336C-FX2 cluster switches
Installing the NX-OS software
Installing the Reference Configuration File (RCF)
Migrating from a Cisco switch to a Cisco Nexus 9336C-FX2 switch
Migrating from a Cisco switch to a Cisco Nexus 9336C-FX2 cluster switch
How to migrate from a Cisco switch to a Cisco Nexus 9336C-FX2 cluster switch
Migrating to a two-node switched cluster
Migrating to a two-node switched cluster with Cisco Nexus 9336C-FX2 cluster switches
Migrating to a switched NetApp cluster environment with Cisco Nexus 9336C-FX2 cluster switches
Replacing switches
Configuring a Cisco Nexus 9336C-FX2 cluster switch
Initial installation of the Nexus 9336C-FX2 cluster switch
Installing the NX-OS software
Installing the Reference Configuration File (RCF)
Replacing a Cisco Nexus 9336C-FX2 cluster switch
Installing in a NetApp cabinet
Installing a Cisco Nexus 9336C-FX2 switch and pass-through panel in a NetApp cabinet
Setting up
Switches supported by ONTAP
Setting up the switches
Required cluster configuration information
Installing the Cluster Switch Health Monitor (CSHM) configuration file for 92300YC switches
Required documentation
Considerations for using Smart Call Home
Sample and blank cabling worksheets
Cisco Nexus 9336C-FX2 cabling worksheet
Cisco Nexus 92300YC cabling worksheet
Cisco Nexus 3232C cabling worksheet
Cisco Nexus 3132Q-V cabling worksheet
Cisco Nexus 5596UP and 5596T cabling worksheet
Installing NX-OS software and Reference Configuration Files
Installing NX-OS software and RCFs on Cisco Nexus 9336C-FX2 cluster switches
Installing the NX-OS software
Installing the Reference Configuration File (RCF)
Migrating from a Cisco switch to a Cisco Nexus 9336C-FX2 switch
Migrating from a Cisco switch to a Cisco Nexus 9336C-FX2 cluster switch
How to migrate from a Cisco switch to a Cisco Nexus 9336C-FX2 cluster switch
Migrating to a two-node switched cluster
Migrating to a two-node switched cluster with Cisco Nexus 9336C-FX2 cluster switches
Migrating to a switched NetApp cluster environment with Cisco Nexus 9336C-FX2 cluster switches
Replacing switches
Configuring a Cisco Nexus 9336C-FX2 cluster switch
Initial installation of the Nexus 9336C-FX2 cluster switch
Installing the NX-OS software
Installing the Reference Configuration File (RCF)
Replacing a Cisco Nexus 9336C-FX2 cluster switch
Installing in a NetApp cabinet
Installing a Cisco Nexus 9336C-FX2 switch and pass-through panel in a NetApp cabinet
Cisco Nexus 92300YC cluster switches
Installing NX-OS software and Reference Configuration Files
Installing NX-OS software and RCF on Cisco Nexus 92300YC cluster switches
Installing the NX-OS software
Installing the Reference Configuration File (RCF)
Migrating to a two-node switched cluster
Migrating to a two-node switched cluster with Cisco Nexus 92300YC switches
Migrating to a switched NetApp cluster environment using Cisco Nexus 92300YC switches
Migrating from a Cisco switch to a Cisco Nexus 92300YC switch
Migrating from a Cisco switch to a Cisco Nexus 92300YC switch
How to migrate from a Cisco switch to a Cisco Nexus 92300YC switch
Replacing switches
Configuring a new Cisco Nexus 92300YC switch
Initial installation of the Cisco Nexus 92300YC switch
Installing the NX-OS software
Installing the Reference Configuration File (RCF)
Replacing a Cisco Nexus 92300YC switch
Installing NX-OS software and Reference Configuration Files
Installing NX-OS software and RCF on Cisco Nexus 92300YC cluster switches
Installing the NX-OS software
Installing the Reference Configuration File (RCF)
Migrating to a two-node switched cluster
Migrating to a two-node switched cluster with Cisco Nexus 92300YC switches
Migrating to a switched NetApp cluster environment using Cisco Nexus 92300YC switches
Migrating from a Cisco switch to a Cisco Nexus 92300YC switch
Migrating from a Cisco switch to a Cisco Nexus 92300YC switch
How to migrate from a Cisco switch to a Cisco Nexus 92300YC switch
Replacing switches
Configuring a new Cisco Nexus 92300YC switch
Initial installation of the Cisco Nexus 92300YC switch
Installing the NX-OS software
Installing the Reference Configuration File (RCF)
Replacing a Cisco Nexus 92300YC switch
Other platforms, disk shelves, and switches
Older platform models
Older disk shelf models
Other Cisco Cluster, Storage and Management Switches
Older platform models
Older disk shelf models
Other Cisco Cluster, Storage and Management Switches
Using this Documentation Center
Tour
Help
Searching for content
Applying a filter
Printing content
Saving and sharing links
Providing feedback
Downloading PDFs or EPUBs for offline use
Tips
Better search results
Mobile devices
Mixed-language environment
Tour
Help
Searching for content
Applying a filter
Printing content
Saving and sharing links
Providing feedback
Downloading PDFs or EPUBs for offline use
Tips
Better search results
Mobile devices
Mixed-language environment
Legal notices
Copyright, trademark, patent, privacy, and machine translation
Copyright
Trademark
Patent
Privacy
Machine translation
Open source
Disk shelves
Copyright, trademark, patent, privacy, and machine translation
Copyright
Trademark
Patent
Privacy
Machine translation
Open source
Disk shelves