Cable the shelves (E4060)
Learn how to attach the power cables and power on the drive shelves.
-
Install your hardware.
-
Take anti-static precautions.
This procedure applies to IOM12 and IOM12B drive shelves.
-
Cable the shelves.
Cable the system according to your configuration. If you need more cabling options than the examples shown in this section, see Cabling.
For the examples shown in this section, you need the following cables:
SAS cables
Example A: An E4060 controller shelf with two DE460C disk shelves in a standard SAS configuration.-
Cable controller A to IOM A of the first drive shelf.
-
Cable IOM A of the first drive shelf to IOM A of the second drive shelf.
-
Cable IOM B of the first drive shelf to IOM B of the second drive shelf.
-
Cable controller B to IOM B of the second drive shelf.
Example B: An E4060 controller shelf with one DE460C disk shelf in a standard SAS configuration.-
Cable controller A to IOM A.
-
Cable controller B to IOM B.
-
-
Power the drive shelves.
You need the following cables:
Power cables
Confirm the drive shelf power switches are off. -
Connect the two power cables for each shelf to different power distribution units (PDUs) in the cabinet or rack.
-
If you have drive shelves, turn on their two power switches first. Wait 2 minutes before applying power to the controller shelf.
-
Turn on the two power switches on the controller shelf.
-
Check the LEDs on each controller.
-