Hardware Used in This Solution
Suggest changes
This solution was validated using the ONTAP AI reference architecture two DGX-1 nodes and one AFF A800 storage system. See NVA-1121 for more details about the infrastructure used in this validation.
The following table lists the hardware components that are required to implement the solution as tested.
Hardware | Quantity |
---|---|
DGX-1 systems |
2 |
AFF A800 |
1 |
Nexus 3232C switches |
2 |