smbc.pfo events
smbc.pfo.completed
- Severity
-
NOTICE
- Description
-
This message occurs when the SnapMirror® Business Continuity (SMBC) planned failover operation completes.
- Corrective Action
-
(None).
- Syslog Message
-
SMBC planned failover operation completed. Destination path: %s.
- Parameters
-
dstpath (STRING): Path name of the destination group of the SMBC relationship.
smbc.pfo.failed
- Severity
-
ERROR
- Description
-
This message occurs when the SnapMirror® Business Continuity (SMBC) planned failover operation fails.
- Corrective Action
-
Determine the cause of the failure by using the "snapmirror failover show -fields error-reason" command. After addressing the cause, retry the "snapmirror failover start -destination-path destination_path" command.
- Syslog Message
-
SMBC planned failover operation failed. Destination path: %s.
- Parameters
-
dstpath (STRING): Path name of the destination group of the SMBC relationship.
smbc.pfo.io.outage.compl.dst
- Severity
-
NOTICE
- Description
-
This message occurs when the secondary (erstwhile) side conversion completes after a planned failover operation of a SnapMirror Business Continuity (SMBC) relationship.
- Corrective Action
-
(None).
- Syslog Message
-
In the planned failover of the SMBC relationship with destination path %s and relationship-ID %s, the destination side I/O disruption started at %s and lasted for %u msecs.
- Parameters
-
dstpath (STRING): Destination path of the SMBC relationship.
cg_rel_id (STRING): ID of the SMBC relationship.
start_time (STRING): I/O disruption start time.
latency (LONGINT): I/O disruption window (msecs).
smbc.pfo.io.outage.compl.src
- Severity
-
NOTICE
- Description
-
This message occurs when the primary (erstwhile) side conversion completes after a planned failover operation of a SnapMirror Business Continuity (SMBC) relationship and IO outage completes as the Report Target Port Group(RTPG) is consistent.
- Corrective Action
-
(None).
- Syslog Message
-
In the planned failover of the SMBC relationship with destination path %s and relationship-ID %s, the source side I/O disruption started at %s and lasted for %u msecs.
- Parameters
-
dstpath (STRING): Destination path of the SMBC relationship.
cg_rel_id (STRING): ID of the SMBC relationship.
start_time (STRING): I/O disruption start time.
latency (LONGINT): I/O disruption window (msecs).
smbc.pfo.start
- Severity
-
NOTICE
- Description
-
This message occurs when the SnapMirror® Business Continuity (SMBC) planned failover operation starts.
- Corrective Action
-
(None).
- Syslog Message
-
SMBC planned failover operation started. Destination path: %s.
- Parameters
-
dstpath (STRING): Path name of the destination group of the SMBC relationship.