Skip to main content
ONTAP MetroCluster

Recable and reconfigure the switches

Contributors netapp-folivia netapp-thomi netapp-aoife netapp-martyh

You must apply the RCF files to reconfigure your zoning to accommodate the new nodes.

If you cannot use the RCF files to configure the switches, you must configure the switches manually. See:

Steps
  1. Locate the RCF files for your configuration.

    You must use the RCF files for an eight-node configuration and that match your switch model.

  2. Apply the RCF files, following the directions on the download page, adjusting the ISL settings as needed.

  3. Ensure that the switch configuration is saved.

  4. Reboot the FC switches.

  5. Cable both the pre-existing and the new FC-to-SAS bridges to the FC switches, using the cabling layout you created previously.

    The FC switch port usage must match the MetroCluster eight-node usage described in Fabric-attached MetroCluster installation and configuration so that the Reference Configuration Files (RCFs) can be used.

  6. Verify that the ports are online by using the correct command for your switch.

    Switch vendor

    Command

    Brocade

    switchshow

    Cisco

    show interface brief

  7. Use the procedure in Fabric-attached MetroCluster installation and configuration to cable the FC-VI ports from the existing and new controllers, using the cabling layout you created previously.

    The FC switch port usage must match the MetroCluster eight-node usage described in Fabric-attached MetroCluster installation and configuration so that the Reference Configuration Files (RCFs) can be used.

  8. From the existing nodes, verify that the FC-VI ports are online:

    metrocluster interconnect adapter show

    metrocluster interconnect mirror show

  9. Cable the HBA ports from the current and the new controllers.

  10. On the existing controller modules, e-enable the ports connected to the switch fabric undergoing maintenance:

    storage port enable -node node-name -port port-ID

  11. Start the new controllers and boot them into Maintenance mode:

    boot_ontap maint

  12. Verify that only storage that will be used by the new DR group is visible to the new controller modules.

    None of the storage that is used by the other DR group should be visible.

  13. Return to the beginning of this process to re-cable the second switch fabric.