Racking the new equipment
Suggest changes
-
PDF of this doc site
- Install a fabric-attached MetroCluster
- Install a MetroCluster IP configuration
- Install a stretch MetroCluster configuration
- Transition from MetroCluster FC to MetroCluster IP
Collection of separate PDF docs
Creating your file...
This may take a few minutes. Thanks for your patience.
Your file is ready
You must rack the equipment for the new nodes.
Steps
-
Use the procedure in Fabric-attached MetroCluster installation and configuration to rack the new storage systems, disk shelves, and FC-to-SAS bridges.