The requested article is not available. Either it doesn't apply to this version of the product or the relevant information is organized differently in this version of the docs. You can search, browse, or go back to the other version.
Racking the new equipment
-
PDF of this doc site
-
Install a fabric-attached MetroCluster
-
Cable a fabric-attached MetroCluster configuration
-
Plan and install a MetroCluster configuration with array LUNs
-
-
Install a MetroCluster IP configuration
-
Install a stretch MetroCluster configuration
-
Maintain the MetroCluster components
-
Transition from MetroCluster FC to MetroCluster IP
-
Upgrade, refresh, or expand the MetroCluster configuration
-

Collection of separate PDF docs
Creating your file...
This may take a few minutes. Thanks for your patience.
Your file is ready
You must rack the equipment for the new nodes.
Steps
-
Use the procedure in Fabric-attached MetroCluster installation and configuration to rack the new storage systems, disk shelves, and FC-to-SAS bridges.