Racking the new equipment
-
PDF of this doc site
-
Install a fabric-attached MetroCluster
-
Install a MetroCluster IP configuration
-
Install a stretch MetroCluster configuration
-
Transition from MetroCluster FC to MetroCluster IP
-
![](https://docs.netapp.com/common/images/pdf-zip.png)
Collection of separate PDF docs
Creating your file...
This may take a few minutes. Thanks for your patience.
Your file is ready
You must rack the equipment for the new nodes.
Steps
-
Use the procedure in Fabric-attached MetroCluster installation and configuration to rack the new storage systems, disk shelves, and FC-to-SAS bridges.