Skip to main content
Install and maintain

Complete the AFX system setup for the Cisco Nexus 9364D-GX2A switch

Contributors netapp-jsnyder netapp-lisa

After completing Cisco Nexus 9364D-GX2A switch configuration, power on the storage shelves and controllers, verify switch connectivity, and complete the AFX 1K or AFX 2K system setup.

Before you begin
  • You must have completed the switch configuration procedures in the configure switch workflow.

  • Each switch must be connected to a console or you must have remote access to each switch.

Steps
  1. Complete the power on and setup steps for your AFX 1K or AFX 2K system:

What's next?

After you've powered on the storage shelves and controllers and completed the AFX 1K or AFX 2K system setup, you are ready to use your AFX system.