Worksheet: Information to collect before and during controller upgrade
You should gather certain information to support upgrading the original nodes. This information includes node IDs, port and LIF details, licensing keys, and IP addresses.
You can use the following worksheet to record the information for use later in the procedure:
Information needed | When collected | When used | Collected Information |
---|---|---|---|
Model, system ID, serial number of original nodes |
Stage 1: Prepare the nodes for the upgrade |
Stage 3: Install and boot node3 |
|
Shelf and disk information, flash storage details, memory, NVRAM, and adapter cards on original nodes |
Stage 1: Preparing the nodes for the upgrade |
Throughout the procedure |
|
Online aggregates and volumes on original nodes |
Stage 1: Prepare the nodes for the upgrade |
Throughout the procedure to verify that aggregates and volumes remain online except during brief relocation |
|
Output of commands |
Stage 1: Prepare the nodes for the upgrade |
Stage 3: Map ports from node1 to node3 |
|
(SAN environments only) Default configuration of FC ports |
Stage 1: Prepare the nodes for the upgrade |
When configuring FC ports on the new nodes |
|
(V-Series systems or systems with FlexArray Virtualization software only) |
Stage 1: Prepare the nodes for the upgrade |
Stage 3: Install and boot node3 |
|
IP address of SPs |
Stage 1: Prepare the nodes for the upgrade |
Stage 6: Confirm that the new controllers are set up correctly |
|
License keys |
Stage 1: Prepare the nodes for the upgrade |
Stage 6: Confirm that the new controllers are set up correctly |
|
IP address for the external key management server |
Stage 1: Rekey disks for Storage Encryption |
Stage 6: Set up Storage Encryption on the new nodes |
|
Name and path of web-accessible directory where you download files to netboot the nodes |
Stage 1: Prepare to netboot |
Stage 3: Install and boot node3 |
|
Non-SAN data LIFs owned by node1 |
Stage 2: Move nonSAN data LIFs owned by node1 to node2 |
Later in the section |
|
Cluster, intercluster, node-management, cluster-management, and physical ports |
Stage 2: Record node1 information |
Stage 3: Install and boot node3 |
|
Ports on new nodes |
Stage 3: Map ports from node1 to node3 |
Later in the section and in the section Map ports from node2 to node4 |
|
Available ports and broadcast domains on node3 |
Stage 3: Map ports from node1 to node3 |
Later in the section |
|
Non-SAN data LIFs not owned by node2 |
Moving non-SAN data LIFs belonging to node1 from node2 to node3 and verifying SAN LIFs on node3 |
Later in the section |
|
Non-SAN data LIFs owned by node2 |
Stage 3: Move nonSAN data LIFs owned by node2 to node3 |
Later in the section |
|
Cluster, intercluster, node-management, cluster-management, and physical ports |
Stage 4: Record node2 information |
Stage 5: Install and booting node4 |
|
Cluster network ports on node4 |
Stage 5: Map ports from node2 to node4 |
Later in the section |
|
Available ports and broadcast domains on node4 |
Stage 5: Map ports from node2 to node4 |
Later in the section |
|
Private and public SSL certificates for the storage system and private SSL certificates for each key management server |
Stage 6: Set up Storage Encryption on the new nodes |
Later in the section |