Prepare to replace the chassis - AFF A1K
Prepare to replace the impaired chassis in your AFF A1K system by identifying the impaired chassis, verifying the replacement components, and labeling the cables and controller module.
Step 1: Locate and monitor your system
You should open a console session and save sessions logs for future reference, and also turn on the system location LED to find the impaired chassis.
-
Connect to the serial console port to interface with and monitor the system.
-
Locate and turn on the controller's Location LED:
-
Use the
system controller location-led show
command to show the current state of the location LED. -
Change the state of the location LED to "on":
system controller location-led modify -node node1 -state on
The Location LED remains lit for 30 minutes.
-
Step 2: Verify replacement components
You should verify that you received the necessary components, remove them from packaging, and save the packaging.
-
Before opening the packaging, you should look at the packaging label and verify:
-
Component part number.
-
Part description.
-
Quantity in the box.
-
-
Remove the contents from the packaging and use the packaging to returning the failed component to NetApp.
Step 3: Label the cables
You should label the cables before removing them from the I/O modules on the back of the system.
-
Label all the cables associated with the storage system. This aids recabling later in this procedure.
-
If you are not already properly grounded, ground yourself.
After you’ve prepared to replace your AFF A1K chassis hardware, you need to shut down the controller.