Requirements to replace the controller - AFX 1K

Contributors netapp-driley netapp-jsnyder

Before replacing the controller in your AFX 1K storage system, ensure you meet the necessary requirements for a successful replacement. This includes verifying all other components in the system are functioning properly, verifying that you have the correct replacement controller, and saving the controller's console output to a text log file.

Review the requirements for replacing the controller.

  • It is important that you apply the commands in these steps on the correct systems:

    • The impaired controller is the controller that is being replaced.

    • The replacement controller is the new controller that is replacing the impaired controller.

    • The healthy controller is the surviving controller.

  • All drive shelves must be working properly.

  • The healthy controller must be able to take over the controller that is being replaced (referred to in this procedure as the “impaired controller”).

  • You must replace the failed component with the field-replaceable unit (FRU) you received from NetApp.

  • You must replace a controller module with a controller module of the same model type. You cannot upgrade your system by just replacing the controller module.

  • You cannot change any drives or drive shelves as part of this procedure.

  • You must always capture the controller's console output to a text log file.

    This provides you a record of the procedure so that you can troubleshoot any issues that you might encounter during the replacement process.

What's next?

After reviewing the requirements to replace your AFX 1K controller, turn off the controllers.