Requirements to replace the controller - AFX 1K
Before replacing the controller in your AFX 1K storage system, ensure you meet the necessary requirements for a successful replacement. This includes verifying all other components in the system are functioning properly, verifying that you have the correct replacement controller, and saving the controller's console output to a text log file.
Review the requirements for replacing the controller.
|
|
NetApp strongly recommends that you enable console logging on the devices you are working with and take the following actions when performing this procedure:
|
-
It is important that you apply the commands in these steps on the correct systems:
-
The impaired controller is the controller that is being replaced.
-
The replacement controller is the new controller that is replacing the impaired controller.
-
The healthy controller is the surviving controller.
-
-
All drive shelves must be working properly.
-
The healthy controller must be able to take over the controller that is being replaced (referred to in this procedure as the “impaired controller”).
-
You must replace the failed component with the field-replaceable unit (FRU) you received from NetApp.
-
You must replace a controller module with a controller module of the same model type. You cannot upgrade your system by just replacing the controller module.
-
You cannot change any drives or drive shelves as part of this procedure.
After reviewing the requirements to replace your AFX 1K controller, turn off the controllers.