Restore and verify the configuration - ASA A900

Contributors netapp-jsnyder netapp-ivanad

To complete the chassis replacement, you must complete specific tasks.

Step 1: Verify and set the HA state of the chassis

You must verify the HA state of the chassis, and, if necessary, update the state to match your system configuration.

  1. In Maintenance mode, from either controller module, display the HA state of the local controller module and chassis: ha-config show

    The HA state should be the same for all components.

  2. If the displayed system state for the chassis does not match your system configuration:

    1. Set the HA state for the chassis: ha-config modify chassis ha-state

      The value for HA-state can be one of the following:

      • ha

      • non-ha

  3. Confirm that the setting has changed: ha-config show

  4. If you have not already done so, recable the rest of your system.

Step 2: Bring up the system

  1. If you have not done so, plug the power cables back into the PSUs.

  2. Turn on the PSUs by toggling the rocker switched to ON, and wait for the controllers to power up completely.

  3. Check the front and the back of the chassis and controllers for any fault lights after power up.

  4. Connect to the SP or BMC IP address of the nodes via SSH. This will be the same address used to shut down the nodes.

  5. Perform additional health checks as described in How_to_perform_a_cluster_health_check_with_a_script_in_ONTAP

  6. Turn AutoSupport back on (end the maintenance window message): system node autosupport invoke -node * -type all -message MAINT=end

Note As a best practice, you should do the following:

Step 3: Return the failed part to NetApp

Return the failed part to NetApp, as described in the RMA instructions shipped with the kit. See the Part Return and Replacements page for further information.