Scheduling file-based backup
Suggest changes
For SAP HANA configurations, you can schedule additional operations such as file-based backup and database integrity checks. You can schedule the file-based backup operation to occur at specific intervals.
-
From the main menu of the Snap Creator GUI, select Management > Schedules, and click Create.
-
In the New Job window, enter the details for the job.
The file-based backup policy is set to “none” by default.