Skip to main content
A newer release of this product is available.

Power on storage resources for a NetApp HCI system

Contributors netapp-yvonneo netapp-pcarriga

You can power on NetApp HCI after the scheduled outage is complete.

Steps
  1. Power on all the storage nodes using either the physical power button or the BMC.

  2. If using the BMC, log in to each node and navigate to Remote Control > Power Control > Power On Server.

  3. When all the storage nodes are online, log in to the NetApp HCI storage system and verify that all nodes are operational.

Find more information