-
PDF of this doc site

Collection of separate PDF docs
Creating your file...
This may take a few minutes. Thanks for your patience.
Your file is ready
- ONTAP FLI Docs
-
SAN migration using FLI
-
Data migration program overview
-
Implementation basics for data migration
-
Migration process overview
- Overview
- Discover phase workflow
- Analyze phase workflow
- Plan phase workflow
- FLI supported configurations
- Execute phase workflows
- Offline migration workflow
- Online migration workflow
- Verify phase workflow
- Discover phase data collection procedures
-
Analyze phase IMT best practices
-
Plan and prepare phase procedures
-
FLI offline workflow
- Overview
-
FLI offline: Preparation for cutover
- Overview
- Rebooting the host to validate the system state
-
Verifying host LUN path and multipath configuration verification
- Prepare hosts for FLI offline migration
- Presenting source LUNs to ONTAP storage during FLI
- Verifying source LUNs on destination storage for offline FLI
- Configuring migration jobs
- FLI offline: Importing the data
- FLI offline: Verifying migration results
- FLI offline post-migration tasks
-
FLI online workflow
- Overview
- Rebooting hosts
- Supported host operating systems for FLI online
- Verify host LUN path and multipath configuration
- Prepare hosts for FLI online migration
- FLI online: Preparing the LUN path
- FLI online: Performing a disruptive cutover
- FLI online: Importing the data
- FLI online: Verifying migration results
- Cleaning up the FLI online migration
- FLI online post-migration tasks
-
FLI 7-Mode to ONTAP transition workflow
- Overview
- 7-Mode to ONTAP FLI supported configurations
- Rebooting hosts
- Verify host LUN path and multipath configuration
- Prepare hosts for the transition
- Preparing source and destination arrays for migration
- Performing a disruptive cutover of FLI 7-Mode to ONTAP
- Importing the data from FLI 7-Mode to ONTAP
- Verifying FLI 7-Mode to ONTAP migration results
- FLI transition workflow post-migration tasks
- FLI using workflow automation (WFA)
-
FLI post-migration procedures
- Overview
- Removing source LUNs from ONTAP storage
- Removing source LUNs from hosts
-
Removing source storage and host zone from the zoneset
- Creating post-migration Snapshot copies
- FLI migration cleanup and verify phase
- Migration report
- Unzoning source and destination array
- Removing the source array from ONTAP
- Removing destination array configuration
- Documenting the newly migrated environment
-
Foreign LUN Import Performance
- Overview
- Performance enhancements in ONTAP 8.3.1
- Variables that affect Foreign LUN Import migration performance
- Benchmarks for estimating migration durations
- Best practices for Foreign LUN Import migration
- ESXi CAW/ATS remediation
- Host remediation
- Clearing SCSI-3 persistent reservations
-
Creating the host to destination zones
-
Sample Site Survey and Planning worksheet
- Overview
- Site Survey and Planning worksheet Contacts tab
- Site Survey and Planning worksheet Questionnaire tab
- Site Survey and Planning worksheet Switches tab
- Site Survey and Planning worksheet Source Storage Devices tab
- Site Survey and Planning worksheet Destination Storage Devices tab
- Site Survey and Planning worksheet Hosts tab
- Site Survey and Planning worksheet HBA and Zone Information tab
- Site Survey and Planning worksheet Source LUNs tab
- Site Survey and Planning worksheet Storage Groups tab
- Site Survey and Planning worksheet LUN Details tab
- Site Survey and Planning worksheet NetApp LUN Layouts tab
- Site Survey and Planning worksheet Migration Schedule tab
- Site Survey and Planning worksheet Aggregate Status tab
- Site Survey and Planning worksheet FAS Config tab
- Site Survey and Planning worksheet SDS CLI Scripts tab
-
- Legal Notices