Request doc changesEdit this pageLearn how to contribute
ON THIS PAGE
    • Product and Solutions
    • Support and Training
    • Cloud Central
    • Community
    • Blog
    • Customer Stories
    • Contact
    • Contact
    Menu bars
    netapp-mark netapp-logo
    English globe
    • English
    • 日本語
    • 简体中文
    • 繁體中文
    • 한국어
    Available PDFs
    • PDF of this doc site
      • PDF of this page
      • SAN migration using FLI
        • Data migration program overview
          • Professional services for SAN migration solutions
          • Recommended tools for data migration
          • Foreign LUN Import
        • Implementation basics for data migration
        • Migration process overview
          • Analyze phase IMT best practices
            • Enablement for non-supported LUNs
          • Plan and prepare phase procedures
        • FLI offline workflow
          • FLI offline: Preparation for cutover
            • Verifying host LUN path and multipath configuration verification
        • FLI online workflow
        • FLI 7-Mode to ONTAP transition workflow
        • FLI post-migration procedures
          • Removing source storage and host zone from the zoneset
        • Foreign LUN Import Performance
          • Creating the host to destination zones
        • Sample Site Survey and Planning worksheet
    Collection of separate PDF docs

    Creating your file...

    This may take a few minutes. Thanks for your patience.
    Your file is ready
    • ONTAP FLI Docs
    • SAN migration using FLI
      • Data migration program overview
        • Overview
        • Intended audience
        • Migration types supported by Foreign LUN Import
        • Foreign LUN Import concepts
        • Data migration challenges
        • Professional services for SAN migration solutions
          • Overview
          • Data Migration Service for heterogeneous SAN environments
        • Data migration methodology
        • Data migration options
        • Recommended tools for data migration
          • Overview
          • Benchmarks for estimating migration durations
        • Foreign LUN Import
          • Overview
          • Foreign LUN Import features
          • Benefits of an FLI-based solution
          • LUN requirements and limitations
          • FLI supported configurations
      • Implementation basics for data migration
        • Overview
        • Physical wiring requirements for FLI
        • Target and initiator port zoning
        • FLI zoning requirements
        • Initiator group configuration
        • Reasons to perform test migrations
      • Migration process overview
        • Overview
        • Discover phase workflow
        • Analyze phase workflow
        • Plan phase workflow
        • FLI supported configurations
        • Execute phase workflows
        • Offline migration workflow
        • Online migration workflow
        • Verify phase workflow
        • Discover phase data collection procedures
        • Analyze phase IMT best practices
          • Overview
          • FLI interoperability and support criteria
          • Checking supported configurations for FLI using the IMT
          • Checking supported configurations for FLI using the SAN LUN Migrate App
          • Enablement for non-supported LUNs
            • Before you begin
            • Importing non-FC LUNs
            • Using Foreign LUN Import to import LUNs into AFF
          • Gap analysis report
        • Plan and prepare phase procedures
          • Overview
          • Wiring best practices for FLI migration
          • Configuring switch zones
          • How to configure source arrays
          • Migration tests
          • Test migration example using Hitachi AMS2100
      • FLI offline workflow
        • Overview
        • FLI offline: Preparation for cutover
          • Overview
          • Rebooting the host to validate the system state
          • Verifying host LUN path and multipath configuration verification
            • Overview
            • Multipath verification for Windows hosts
            • Multipath verification for Linux hosts
            • Multipath verification for ESXi hosts
          • Prepare hosts for FLI offline migration
          • Presenting source LUNs to ONTAP storage during FLI
          • Verifying source LUNs on destination storage for offline FLI
          • Configuring migration jobs
        • FLI offline: Importing the data
        • FLI offline: Verifying migration results
        • FLI offline post-migration tasks
      • FLI online workflow
        • Overview
        • Rebooting hosts
        • Supported host operating systems for FLI online
        • Verify host LUN path and multipath configuration
        • Prepare hosts for FLI online migration
        • FLI online: Preparing the LUN path
        • FLI online: Performing a disruptive cutover
        • FLI online: Importing the data
        • FLI online: Verifying migration results
        • Cleaning up the FLI online migration
        • FLI online post-migration tasks
      • FLI 7-Mode to ONTAP transition workflow
        • Overview
        • 7-Mode to ONTAP FLI supported configurations
        • Rebooting hosts
        • Verify host LUN path and multipath configuration
        • Prepare hosts for the transition
        • Preparing source and destination arrays for migration
        • Performing a disruptive cutover of FLI 7-Mode to ONTAP
        • Importing the data from FLI 7-Mode to ONTAP
        • Verifying FLI 7-Mode to ONTAP migration results
        • FLI transition workflow post-migration tasks
      • FLI using workflow automation (WFA)
      • FLI post-migration procedures
        • Overview
        • Removing source LUNs from ONTAP storage
        • Removing source LUNs from hosts
        • Removing source storage and host zone from the zoneset
          • Brocade fabric example
          • Cisco fabric example
        • Creating post-migration Snapshot copies
        • FLI migration cleanup and verify phase
        • Migration report
        • Unzoning source and destination array
        • Removing the source array from ONTAP
        • Removing destination array configuration
        • Documenting the newly migrated environment
      • Foreign LUN Import Performance
        • Overview
        • Performance enhancements in ONTAP 8.3.1
        • Variables that affect Foreign LUN Import migration performance
        • Benchmarks for estimating migration durations
        • Best practices for Foreign LUN Import migration
        • ESXi CAW/ATS remediation
        • Host remediation
        • Clearing SCSI-3 persistent reservations
        • Creating the host to destination zones
          • Overview
          • Brocade fabric in production fabric A example
          • Brocade fabric in production fabric B example
          • Cisco fabric in production fabric A example
          • Cisco fabric in production fabric B example
      • Sample Site Survey and Planning worksheet
        • Overview
        • Site Survey and Planning worksheet Contacts tab
        • Site Survey and Planning worksheet Questionnaire tab
        • Site Survey and Planning worksheet Switches tab
        • Site Survey and Planning worksheet Source Storage Devices tab
        • Site Survey and Planning worksheet Destination Storage Devices tab
        • Site Survey and Planning worksheet Hosts tab
        • Site Survey and Planning worksheet HBA and Zone Information tab
        • Site Survey and Planning worksheet Source LUNs tab
        • Site Survey and Planning worksheet Storage Groups tab
        • Site Survey and Planning worksheet LUN Details tab
        • Site Survey and Planning worksheet NetApp LUN Layouts tab
        • Site Survey and Planning worksheet Migration Schedule tab
        • Site Survey and Planning worksheet Aggregate Status tab
        • Site Survey and Planning worksheet FAS Config tab
        • Site Survey and Planning worksheet SDS CLI Scripts tab
    • Legal Notices
    • docs.netapp.com
    • ONTAP

    ONTAP Foreign LUN Import Documentation

    FLI workflows
    Offline workflow
    Online workflow
    FLI 7-Mode to ONTAP transition workflow
    FLI using workflow automation (WFA)
    • © 2022 NetApp, Inc.
    • Terms of Use
    • Privacy Policy
    • Cookie Policy
    • Cookie Settings
    • Have feedback for our website? Let us know
    • Announcements
    • blog blog@
    • community community@
    • twitter twitter@
    • facebook facebook@
    • linkedin linkedin@
    • youtube youtube@
    • slideshare slideshare@