Cabling the ISLs between MetroCluster sites
Suggest changes
You must connect the FC switches at each site through the fiber-optic Inter-Switch Links (ISLs) to form the switch fabrics that connect the MetroCluster components.
About this task
This must be done for both switch fabrics.
Steps
-
Connect the FC switches at each site to all ISLs, using the cabling in the table that corresponds to your configuration and switch model.
Related information