The requested article is not available. Either it doesn't apply to this version of the product or the relevant information is organized differently in this version of the docs. You can search, browse, or go back to the other version.
Cabling the management and data connections
-
PDF of this doc site
-
Install a fabric-attached MetroCluster
-
Cable a fabric-attached MetroCluster configuration
-
Plan and install a MetroCluster configuration with array LUNs
-
-
Install a MetroCluster IP configuration
-
Install a stretch MetroCluster configuration
-
Maintain the MetroCluster components
-
Transition from MetroCluster FC to MetroCluster IP
-
Upgrade, refresh, or expand the MetroCluster configuration
-

Collection of separate PDF docs
Creating your file...
This may take a few minutes. Thanks for your patience.
Your file is ready
You must cable the management and data ports on each storage controller to the site networks.
About this task
This task must be repeated for each new controller at both MetroCluster sites.
You can connect the controller and cluster switch management ports to existing switches in your network or to new dedicated network switches such as NetApp CN1601 cluster management switches.
Step
-
Cable the controller's management and data ports to the management and data networks at the local site.