Replace I/O module - ASA A70 and ASA A90
Use this procedure to replace a failed I/O module.
-
You can use this procedure with all versions of ONTAP supported by your storage system.
-
All other components in the storage system must be functioning properly; if not, you must contact technical support.
Step 1: Shut down the impaired controller
Shut down or take over the impaired controller.
To shut down the impaired controller, you must determine the status of the controller and, if necessary, take over the controller so that the healthy controller continues to serve data from the impaired controller storage.
-
If you have a SAN system, you must have checked event messages (
cluster kernel-service show
) for the impaired controller SCSI blade. Thecluster kernel-service show
command (from priv advanced mode) displays the node name, quorum status of that node, availability status of that node, and operational status of that node.Each SCSI-blade process should be in quorum with the other nodes in the cluster. Any issues must be resolved before you proceed with the replacement.
-
If you have a cluster with more than two nodes, it must be in quorum. If the cluster is not in quorum or a healthy controller shows false for eligibility and health, you must correct the issue before shutting down the impaired controller; see Synchronize a node with the cluster.
-
If AutoSupport is enabled, suppress automatic case creation by invoking an AutoSupport message:
system node autosupport invoke -node * -type all -message MAINT=<# of hours>h
The following AutoSupport message suppresses automatic case creation for two hours:
cluster1:> system node autosupport invoke -node * -type all -message MAINT=2h
-
Disable automatic giveback from the console of the healthy controller:
storage failover modify -node local -auto-giveback false
When you see Do you want to disable auto-giveback?, enter y
. -
Take the impaired controller to the LOADER prompt:
If the impaired controller is displaying… Then… The LOADER prompt
Go to the next step.
Waiting for giveback…
Press Ctrl-C, and then respond
y
when prompted.System prompt or password prompt
Take over or halt the impaired controller from the healthy controller:
storage failover takeover -ofnode impaired_node_name
When the impaired controller shows Waiting for giveback…, press Ctrl-C, and then respond
y
.
Step 2: Replace a failed I/O module
To replace an I/O module, locate it within the controller module and follow the specific sequence of steps.
-
If you are not already grounded, properly ground yourself.
-
Unplug any cabling on the target I/O module.
Make sure to label the cables so that you know where they came from.
-
Rotate the cable management tray down by pulling the buttons on the inside of the cable management tray and rotating it down.
-
Remove the I/O module from the controller module:
This following illustration shows removing a horizontal and vertical I/O module. Typically, you will only remove one I/O module. Cam locking button
-
Depress the cam latch button.
-
Rotate the cam latch do away from the module as far as it will go.
-
Remove the module from the controller module by hooking your finger into the cam lever opening and pulling the module out of the controller module.
Make sure that you keep track of which slot the I/O module was in.
-
-
Set the I/O module aside.
-
Install the replacement I/O module into the target slot:
-
Align the I/O module with the edges of the slot.
-
Gently slide the module into the slot all the way into the controller module, and then rotate the cam latch all the way up to lock the module in place.
-
-
Cable the I/O module.
-
Repeat the remove and install steps to replace additional modules for the controller.
-
Rotate the cable management tray into the locked position.
Step 3: Reboot the controller
After you replace an I/O module, you must reboot the controller module.
-
From the LOADER prompt, reboot the node:`bye`
This reinitializes the I/O cards and other components and reboots the node. Be sure to exit Maintenance mode after completing the conversion. -
Return the node to normal operation:
storage failover giveback -ofnode impaired_node_name
-
If automatic giveback was disabled, reenable it:
storage failover modify -node local -auto-giveback true
Step 4: Return the failed part to NetApp
Return the failed part to NetApp, as described in the RMA instructions shipped with the kit. See the Part Return and Replacements page for further information.