Cabling the cluster interconnect in eight- or four-node configurations

Download PDF of this page

In eight- or four-node MetroCluster configurations, you must cable the cluster interconnect between the local controller modules at each site.

This task is not required on two-node MetroCluster configurations.

This task must be performed at both MetroCluster sites.

Steps
  1. Cable the cluster interconnect from one controller module to the other, or if cluster interconnect switches are used, from each controller module to the switches.

Related information