Cabling the cluster interconnect in eight- or four-node configurations
Suggest changes
In eight-node or four-node MetroCluster configurations, you must cable the cluster interconnect between the local controller modules at each site.
About this task
This task is not required on two-node MetroCluster configurations.
This task must be performed at both MetroCluster sites.
Step
-
Cable the cluster interconnect from one controller module to the other, or if cluster interconnect switches are used, from each controller module to the switches.
Related information