Stage 6 overview
Suggest changes
-
PDF of this doc site
-
Upgrade by using ARL
- Use "system controller replace" commands to upgrade controller models in the same chassis
-
Upgrade by using ARL
Collection of separate PDF docs
Creating your file...
This may take a few minutes. Thanks for your patience.
Your file is ready
During Stage 6, you confirm that the new nodes are set up correctly and, if the new nodes are encryption-enabled, you configure and set up Storage Encryption or NetApp Volume Encryption. You should also decommission the old nodes and resume the SnapMirror operations.
Steps
MetroCluster FC configuration
In a MetroCluster FC configuration, you must replace the disaster recovery/failover site nodes as soon as possible. Mismatch in controller models within a MetroCluster is not supported because controller model mismatch can cause disaster recovery mirroring to go offline. Use the -skip-metrocluster-check true
command to bypass MetroCluster checks when you are replacing nodes at the second site.