Controller replacement workflow - AFX 1K

Contributors netapp-driley netapp-jsnyder

Get started with replacing the controller in your AFX 1K storage system by shutting down the impaired controller, removing and replacing the controller, restoring the system configuration, and verifying system operations.

To replace the controller module, you must meet certain requirements.

Shut down or take over the impaired controller so that the healthy controller continues to serve data from the impaired controller storage.

Replace the controller by removing the impaired controller, moving the FRU components to the replacement module, and installing the replacement module in the enclosure.

Verify the low-level system configuration of the replacement controller and update the system settings if needed.

Transfer the ownership of storage resources back to the replacement controller.

Verify the Logical Interfaces (LIFs), check cluster health, and return the failed part to NetApp.