Skip to main content

Obtaining additional equipment and tools (SG5700)

Contributors

Before installing the StorageGRID appliance, confirm you have all of the additional equipment and tools that you need.

You need the following additional equipment to install and configure the hardware:

  • Screwdrivers

    Two screwdrivers

    Phillips No. 2 screwdriver

    Medium flat-blade screwdriver

  • ESD wrist strap

    ESD wrist strap
  • Optical cables and SFP transceivers

    Optical cable and SFP+ transceiver

    Optical cables for the 10/25-GbE ports you plan to use

    Optional: SFP28 transceivers if you want to use 25-GbE link speed

  • Ethernet cables

    Ethernet cables
  • Service laptop

    Service laptop

    Supported web browser

    SSH client, such as PuTTY

    1-Gb (RJ-45) Ethernet port

  • Optional tools

    Power drill and flashlight

    Power drill with Phillips head bit

    Flashlight

    Mechanized lift for SG5760