The requested article is not available. Either it doesn't apply to this version of the product or the relevant information is organized differently in this version of the docs. You can search, browse, or go back to the other version.
A newer release of this product is available.
Obtain additional equipment and tools (SG5700)
-
PDF of this doc site
-
Install and maintain appliance hardware
-
SG100 and SG1000 services appliances
-
-
Install and upgrade software
-
Perform system administration
-
Monitor and maintain StorageGRID
-
Recover and maintain
-
Grid node recovery procedures
-
-
-

Collection of separate PDF docs
Creating your file...
This may take a few minutes. Thanks for your patience.
Your file is ready
Before installing the StorageGRID appliance, confirm you have all of the additional equipment and tools that you need.
You need the following additional equipment to install and configure the hardware:
-
Screwdrivers
Phillips No. 2 screwdriver
Medium flat-blade screwdriver
-
ESD wrist strap
-
Optical cables and SFP transceivers
Optical cables for the 10/25-GbE ports you plan to use
Optional: SFP28 transceivers if you want to use 25-GbE link speed
-
Ethernet cables
-
Service laptop
SSH client, such as PuTTY
1-Gb (RJ-45) Ethernet port
-
Optional tools
Power drill with Phillips head bit
Flashlight
Mechanized lift for SG5760