Skip to main content

Unpack boxes (SG100 and SG1000)

Contributors netapp-perveilerk

Before installing the StorageGRID appliance, unpack all boxes and compare the contents to the items on the packing slip.

Appliance hardware

  • SG100 or SG1000

    Front drives SG 100 or SG1000 services appliance
  • Rail kit with instructions

    Rail kit

Power cords

The shipment for the StorageGRID appliance includes the following power cords:

  • Two power cords for your country

    Power cords

    Your cabinet might have special power cords that you use instead of the power cords that ship with the appliance.