Skip to main content
A newer release of this product is available.

Obtain additional equipment and tools (SG6000)

Contributors netapp-perveilerk

Before installing the StorageGRID appliance, confirm you have all of the additional equipment and tools that you need.

You need the following additional equipment to install and configure the hardware:

  • Screwdrivers

    Two screwdrivers

    Phillips No. 2 screwdriver

    Medium flat-blade screwdriver

  • ESD wrist strap

    ESD wrist strap
  • Optical cables and SFP transceivers

    Optical cable and SFP+ transceiver

    You need one of the following options:

    • One to four TwinAx cables or optical cables for the 10/25-GbE ports you plan to use on the SG6000-CN controller

    • One to four SFP+ transceivers for the 10/25-GbE ports if you will use optical cables and 10-GbE link speed

    • One to four SFP28 transceivers for the 10/25-GbE ports if you will use optical cables and 25-GbE link speed

  • RJ-45 (Cat5/Cat5e/Cat6) Ethernet cables

    Ethernet cables
  • Service laptop

    Service laptop

    1-GbE (RJ-45) port

  • Optional tools

    Power drill and flashlight

    Power drill with Phillips head bit

    Flashlight

    Mechanized lift for 60-drive shelves