Obtaining additional equipment and tools (SG6000)
Before installing the StorageGRID appliance, confirm you have all of the additional equipment and tools that you need.
You need the following additional equipment to install and configure the hardware:
-
Screwdrivers
Phillips No. 2 screwdriver
Medium flat-blade screwdriver
-
ESD wrist strap
-
Optical cables and SFP transceivers
You need one of the following options:
-
One to four TwinAx cables or optical cables for the 10/25-GbE ports you plan to use on the SG6000-CN controller
-
One to four SFP+ transceivers for the 10/25-GbE ports if you will use optical cables and 10-GbE link speed
-
One to four SFP28 transceivers for the 10/25-GbE ports if you will use optical cables and 25-GbE link speed
-
-
RJ-45 (Cat5/Cat5e/Cat6) Ethernet cables
-
Service laptop
Supported web browser
1-GbE (RJ-45) port
-
Optional tools
Power drill with Phillips head bit
Flashlight
Mechanized lift for 60-drive shelves