Prepare site (SG100 and SG1000)
Suggest changes
-
PDF of this doc site
- Install and maintain appliance hardware
- Install and upgrade software
- Perform system administration
-
Monitor and maintain StorageGRID
-
Recover and maintain
- Grid node recovery procedures
-
Recover and maintain
Collection of separate PDF docs
Creating your file...
This may take a few minutes. Thanks for your patience.
Your file is ready
Before installing the appliance, you must make sure that the site and the cabinet or rack you plan to use meet the specifications for a StorageGRID appliance.
Steps
-
Confirm that the site meets the requirements for temperature, humidity, altitude range, airflow, heat dissipation, wiring, power, and grounding. See the NetApp Hardware Universe for more information.
-
Confirm that your location provides the correct voltage of AC power (in the range of 120 to 240 volts AC).
-
Obtain a 19-inch (48.3-cm) cabinet or rack to fit shelves of this size (without cables):
Height Width Depth Maximum weight 1.70 in.
(4.32 cm)
17.32 in.
(44.0 cm)
32.0 in.
(81.3 cm)
39 lb.
(17.7 kg)
-
Decide where you are going to install the appliance.
Related information