The requested article is not available. Either it doesn't apply to this version of the product or the relevant information is organized differently in this version of the docs. You can search, browse, or go back to the other version.
A newer release of this product is available.
Connect power cords and apply power (SG5700)
-
PDF of this doc site
-
Install and maintain appliance hardware
-
SG100 and SG1000 services appliances
-
-
Install and upgrade software
-
Perform system administration
-
Monitor and maintain StorageGRID
-
Recover and maintain
-
Grid node recovery procedures
-
-
-

Collection of separate PDF docs
Creating your file...
This may take a few minutes. Thanks for your patience.
Your file is ready
When you apply power to the appliance, both controllers boot up.
What you'll need
Both appliance power switches must be off before connecting power.
|
Risk of electrical shock — Before connecting the power cords, make sure that the two power switches on the appliance are off. |
Steps
-
Confirm that the two power switches on the appliance are off.
-
Connect the two power cords to the appliance.
-
Connect the two power cords to different power distribution units (PDUs) in the cabinet or rack.
-
Turn on the two power switches on the appliance.
-
Do not turn off the power switches during the power-on process.
-
The fans are very loud when they first start up. The loud noise during start-up is normal.
-
-
After the controllers have booted up, check their seven-segment displays.