Skip to main content

Unpacking the boxes (SG6000)

Contributors

Before installing the StorageGRID appliance, unpack all boxes and compare the contents to the items on the packing slip.

SG6060

  • SG6000-CN controller

    SG6000-CN controller
  • E2860 controller shelf with no drives installed

    SG5760 4U appliance
  • Two front bezels

    Front Bezels
  • Two rail kits with instructions

    Rail kit
  • 60 drives (2 SSD and 58 NL-SAS)

    Drive
  • Four handles

    SG5760 handles
  • Back brackets and cage nuts for square-hole rack installation

    Back brackets and cage nuts for SG5760

SG6060 expansion shelf

  • Expansion shelf with no drives installed

    SG5760 4U appliance
  • Front bezel

    Front Bezel DE460C
  • 60 NL-SAS drives

    Drive
  • One rail kit with instructions

    Rail kit
  • Four handles

    SG5760 handles
  • Back brackets and cage nuts for square-hole rack installation

    Back brackets and cage nuts for SG5760

SGF6024

  • SG6000-CN controller

    SG6000-CN controller
  • EF570 flash array with 24 solid state (flash) drives installed

    EF570 Controller Shelf
  • Two front bezels

    SG6024 Front Bezels
  • Two rail kits with instructions

    Rail kit
  • Shelf endcaps

    Endcaps

Cables and connectors

The shipment for the StorageGRID appliance includes the following cables and connectors:

  • Four power cords for your country

    Power cords

    Your cabinet might have special power cords that you use instead of the power cords that ship with the appliance.

  • Optical cables and SFP transceivers

    Optical cables and SFPs

    Four optical cables for the FC interconnect ports

    Four SFP+ transceivers, which support 16-Gb/s FC

  • Optional: Two SAS cables for connecting each SG6060 expansion shelf

    SAS Cables