Skip to main content
A newer release of this product is available.

Unpacking the boxes (SG6000)

Contributors

Before installing the StorageGRID appliance, unpack all boxes and compare the contents to the items on the packing slip.

SG6060

  • SG6000-CN controller

    SG6000-CN controller
  • E2860 controller shelf with no drives installed

    SG5760 4U appliance
  • Two front bezels

    Front Bezels
  • Two rail kits with instructions

    Rail kit
  • 60 drives (2 SSD and 58 NL-SAS)

    Drive
  • Four handles

    SG5760 handles
  • Back brackets and cage nuts for square-hole rack installation

    Back brackets and cage nuts for SG5760

SG6060 expansion shelf

  • Expansion shelf with no drives installed

    SG5760 4U appliance
  • Front bezel

    Front Bezel DE460C
  • 60 NL-SAS drives

    Drive
  • One rail kit with instructions

    Rail kit
  • Four handles

    SG5760 handles
  • Back brackets and cage nuts for square-hole rack installation

    Back brackets and cage nuts for SG5760

SGF6024

  • SG6000-CN controller

    SG6000-CN controller
  • EF570 flash array with 24 solid state (flash) drives installed

    EF570 Controller Shelf
  • Two front bezels

    SG6024 Front Bezels
  • Two rail kits with instructions

    Rail kit
  • Shelf endcaps

    Endcaps

Cables and connectors

The shipment for the StorageGRID appliance includes the following cables and connectors:

  • Four power cords for your country

    Power cords

    Your cabinet might have special power cords that you use instead of the power cords that ship with the appliance.

  • Optical cables and SFP transceivers

    Optical cables and SFPs

    Four optical cables for the FC interconnect ports

    Four SFP+ transceivers, which support 16-Gb/s FC

  • Optional: Two SAS cables for connecting each SG6060 expansion shelf

    SAS Cables