Unpacking the boxes (SG6000)
Before installing the StorageGRID appliance, unpack all boxes and compare the contents to the items on the packing slip.
SG6060
-
SG6000-CN controller
-
E2860 controller shelf with no drives installed
-
Two front bezels
-
Two rail kits with instructions
-
60 drives (2 SSD and 58 NL-SAS)
-
Four handles
-
Back brackets and cage nuts for square-hole rack installation
SG6060 expansion shelf
-
Expansion shelf with no drives installed
-
Front bezel
-
60 NL-SAS drives
-
One rail kit with instructions
-
Four handles
-
Back brackets and cage nuts for square-hole rack installation
SGF6024
-
SG6000-CN controller
-
EF570 flash array with 24 solid state (flash) drives installed
-
Two front bezels
-
Two rail kits with instructions
-
Shelf endcaps
Cables and connectors
The shipment for the StorageGRID appliance includes the following cables and connectors:
-
Four power cords for your country
Your cabinet might have special power cords that you use instead of the power cords that ship with the appliance.
-
Optical cables and SFP transceivers
Four optical cables for the FC interconnect ports
Four SFP+ transceivers, which support 16-Gb/s FC
-
Optional: Two SAS cables for connecting each SG6060 expansion shelf