Skip to main content
Install and maintain

Get up and running with AFX systems, Cluster, Storage, and Shared switches

Contributors netapp-jsnyder netapp-yvonneo netapp-jolieg

To get up and running with AFX systems, cluster, storage, and shared switches, you install hardware components and configure your switch.

Deploying the switch involves the following workflow.

One Install the switch hardware

Install your switches in the rack or cabinet. Access the following instructions for your switch model.

Two Install the storage system and storage shelves

Install your storage system and storage shelves in the cabinet or rack. Access the install and setup instructions for your platform model.

Three Cable the switches to the controllers

The ONTAP systems install and setup instructions include instructions for cabling the controller ports to the switch. However, if you need lists of supported cables and transceivers, and detailed information about the host ports for your switch, access the following instructions for your switch model.

Four Configure the switch software

To install and configure the software on your switch, follow the software install workflow for your switch model.

Five Complete system setup

After you have configured your switches and installed the required software, access the install and setup instructions for your ONTAP systems platform model to complete your system setup.

Six Complete ONTAP configuration

After you have installed and set up your ONTAP systems controllers and switches, you must complete configuring your storage in ONTAP. Access the following instructions according to your deployment configuration.